Trip/fall during
To ensure that operator to perform
mount/dismount of First aid cases/medical
pre start check and clean up of Additional control shall be
machinery, noise and treatment (M.C between 2 2 4 proposed when necessary
slippery surfaces before
vibration of machinery gives 1 to 3 days)
mount/dismount.
physical discomforts.
Page 12/29
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
Form No : F/OSH - 03
Rev. 0