Mobilization/ First aid cases/medical treatment Training and regular toolbox talk; Close Additional control shall be proposed
Manual handling.
(M.C between 1 to 3 days) supervision.
2 2 4 when necessary.
Unloading of roof.
Heat stress/stroke due to hot Near miss/ unsafe act/ unsafe Use proper ventilation system; Take a Additional control shall be proposed
working environment condition short break and drink water.
3 1 3 when necessary.
Material storage at
roof top. Briefing By SHO on safety
Falling/flying object material due to Fatality or permanent disability or Material to be securely stack and away
windy condition. irreversible illness from edges.
2 5 10 awareness. Additional control shall
be made if necessary.
Permit to work,
Fatality or permanent disability or Provide safe working procedure; Wear
Slip & fall from height
irreversible illness safety harness & provide lifelines.
3 5 15 qualification/competency, briefing
by SHO on safety awareness
Installation of roof
material
Minor damage (No or less Provide safe material handling & toe
Material damage due to falling/hit by Additional control shall be proposed
falling object
disruption, repair cost > RM1,000 board at edge of roof; Cordon working 2 2 4 when necessary