0% found this document useful (0 votes)
45 views1 page

Oil and Gas Production Systems Overview

The document outlines a block flow diagram for an onshore Gas Oil Separation Plant (GOSP) operated by Gazal Al Karkh Oil Company. It includes various systems such as high and low-pressure gas gathering, chemical injection, water handling, and utility systems. Additionally, it mentions design certification and revision validation processes required by Saudi Aramco.

Uploaded by

lonewolf6544
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views1 page

Oil and Gas Production Systems Overview

The document outlines a block flow diagram for an onshore Gas Oil Separation Plant (GOSP) operated by Gazal Al Karkh Oil Company. It includes various systems such as high and low-pressure gas gathering, chemical injection, water handling, and utility systems. Additionally, it mentions design certification and revision validation processes required by Saudi Aramco.

Uploaded by

lonewolf6544
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

NOTES:

TO GAS GATHERING AREA-HP

TO GAS GATHERING AREA-LP

CHEMICAL INJ.

HIGH PRESSURE LOW PRESSURE BOOSTER/ SHIPPER DRY CRUDE TO PIPELINE


CRUDE FROM WELLS PRODUCTION TRAPS CHARGE PUMPS
(INLET HEADER)
PRODUCTION TRAPS PUMPS

INLET FACILITY

REFERENCE DRAWINGS
WASH WATER

PRE-TREATER DEHYDRATOR DESALTER

WET CRUDE HANDLING

RECOVERED OIL WATER / OIL SALT WATER SALT WATER INJECTION TO WELLS
SEPARATOR INJECTION PUMPS

WATER HANDLING

REVISION VALIDATION

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER


(DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

[Link]. DATE REVISION DESCRIPTION

UTILITY/ FIRE PRESSURE SEWER CHEMICAL INJECTION EVAPORATION


WATER SYSTEM SYSTEM SYSTEM POND
GAZAL AL KARKH OIL COMPANY
DRAWING TYPE
BLOCK FLOW DIAGRAM BFD
OVERALL BLOCK FLOW DIAGRAM
ON SHORE GOSP

PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

A PRO-00001 001
Saudi Aramco 2615 ENG. (09/03)

SMART CADD-04

You might also like