NOTES:
TO GAS GATHERING AREA-HP
TO GAS GATHERING AREA-LP
CHEMICAL INJ.
HIGH PRESSURE LOW PRESSURE BOOSTER/ SHIPPER DRY CRUDE TO PIPELINE
CRUDE FROM WELLS PRODUCTION TRAPS CHARGE PUMPS
(INLET HEADER)
PRODUCTION TRAPS PUMPS
INLET FACILITY
REFERENCE DRAWINGS
WASH WATER
PRE-TREATER DEHYDRATOR DESALTER
WET CRUDE HANDLING
RECOVERED OIL WATER / OIL SALT WATER SALT WATER INJECTION TO WELLS
SEPARATOR INJECTION PUMPS
WATER HANDLING
REVISION VALIDATION
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
[Link]. DATE REVISION DESCRIPTION
UTILITY/ FIRE PRESSURE SEWER CHEMICAL INJECTION EVAPORATION
WATER SYSTEM SYSTEM SYSTEM POND
GAZAL AL KARKH OIL COMPANY
DRAWING TYPE
BLOCK FLOW DIAGRAM BFD
OVERALL BLOCK FLOW DIAGRAM
ON SHORE GOSP
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
A PRO-00001 001
Saudi Aramco 2615 ENG. (09/03)
SMART CADD-04