You are on page 1of 4

UNIVERSITI TEKNOLOGI MARA

FORMATIVE ASSESSMENT

COURSE : MEASUREMENT OF CIVIL ENGINEERING WORKS


COURSE CODE : DQS363
TOPIC : ROADS AND PAVINGS
ASSIGNMENT : 2
WEEK OF ISSUE : WEEK 8
WEEK OF : WEEK 9
SUBMISSION (please refer to your lecturer on the exact date)

INSTRUCTIONS TO STUDENTS

1. Answer the question in the Dimension Paper (Slip-sort) and Bill of Quantities for Civil
Engineering Works

2. All measurement must be strictly in accordance with the principles laid down in
Malaysian Standard Method of Measurement for Civil Engineering Works (MyCESMM2).

3. This assessment is to achieve CLO2 and CLO3 as per stated below:


a. CLO2: Measure based on drawings and specifications by using the current
Malaysian Civil Engineering Method of Measurement (MyCESMM) for works in
Earthworks, Concrete Work and ROADS AND PAVINGS.
b. CLO3: Organize all measured works, and compile a complete Bills of Quantities
for Earthworks, Concrete Work and ROADS AND PAVINGS based on the current
Malaysian Civil Engineering Method of Measurement (MyCESMM).

4. The mode of this assessment is groupwork. Please refer to your lecturer on the number
of group members in a group. It is advisable that each group must not exceed THREE
(3) number of members.

5. The answer must be in handwritten.

6. Please submit the assignment with the cover provided.


QUESTION

Prepare a Bill of Quantities complete with taking off for the “Cadangan Membina dan
Menyiapkan Projek Kompleks Penempatan Agropolitan Chemomoi, Mukim Pelangai,
Daerah Bentong, Pahang Darul Makmur” as indicated in drawing
RPC/CHEMOMOI/P3/C/JCT-01 for :
i. Flexible Pavement (exclude Road Shoulder)
ii. One (1) Road Furniture – Signage
iii. One (1) Road Furniture – Pavement Marking

(30 marks)
NOTA

THIS DRAWING IS COPYRIGHT


CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE,
ONLY FIGURED DIMENSION ARE TO BE WORKED FROM,
DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO
THE ARCHITECT BEFORE PROCEEDING

PROJEK

TANDATANGAN PEMILIK

PEMILIK

AGENSI PELAKSANA

ARKITEK

S E N D I R I A N B E R H A D

JURUTERA PERUNDING MEKANIKAL & ELEKTRIKAL

AAD Consultants

JURUKUR BAHAN

AZM Perunding Ukur Bahan

JURUTERA PERUNDING SIVIL & STRUKTUR

TAJUK LUKISAN

PINDAAN TARIKH CATATAN

DILULUSKAN : Ir. Hj. HILMI UKURAN : 1:100 (A1)


REKABENTUK : RBH TARIKH : NOV. 2009
DILUKIS : AZbM DISEMAK : Ir. Hj. SHAHUL

NO. LUKISAN PINDAAN :

RPC/CHEMOMOI/P3/C/JCT-01 0
COURSE : MEASUREMENT OF CIVIL ENGINEERING WORKS
COURSE CODE : DQS363
TOPIC : ROADS AND PAVINGS
ASSIGNMENT : 2
SEMESTER : MARCH - AUGUST 2024
SUBMISSION :
DATE

GROUP MEMBERS
NAME STUDENT ID

ASSESSMENT MARKS

DESCRIPTION MARKS
Taking Bill of Overall
Off Quantities
Measurement – Taking Off List /1

Measurement – Query List /1

Measurement – Taking Off /13

Bill of Quantities – Preamble /5

Bill of Quantities – Preparation of bill of quantities /10

TOTAL /15 /15 /30