Professional Documents
Culture Documents
DQS363 - Assign 2 - Roads and Pavings - Jul 24
DQS363 - Assign 2 - Roads and Pavings - Jul 24
FORMATIVE ASSESSMENT
INSTRUCTIONS TO STUDENTS
1. Answer the question in the Dimension Paper (Slip-sort) and Bill of Quantities for Civil
Engineering Works
2. All measurement must be strictly in accordance with the principles laid down in
Malaysian Standard Method of Measurement for Civil Engineering Works (MyCESMM2).
4. The mode of this assessment is groupwork. Please refer to your lecturer on the number
of group members in a group. It is advisable that each group must not exceed THREE
(3) number of members.
Prepare a Bill of Quantities complete with taking off for the “Cadangan Membina dan
Menyiapkan Projek Kompleks Penempatan Agropolitan Chemomoi, Mukim Pelangai,
Daerah Bentong, Pahang Darul Makmur” as indicated in drawing
RPC/CHEMOMOI/P3/C/JCT-01 for :
i. Flexible Pavement (exclude Road Shoulder)
ii. One (1) Road Furniture – Signage
iii. One (1) Road Furniture – Pavement Marking
(30 marks)
NOTA
PROJEK
TANDATANGAN PEMILIK
PEMILIK
AGENSI PELAKSANA
ARKITEK
S E N D I R I A N B E R H A D
AAD Consultants
JURUKUR BAHAN
TAJUK LUKISAN
RPC/CHEMOMOI/P3/C/JCT-01 0
COURSE : MEASUREMENT OF CIVIL ENGINEERING WORKS
COURSE CODE : DQS363
TOPIC : ROADS AND PAVINGS
ASSIGNMENT : 2
SEMESTER : MARCH - AUGUST 2024
SUBMISSION :
DATE
GROUP MEMBERS
NAME STUDENT ID
ASSESSMENT MARKS
DESCRIPTION MARKS
Taking Bill of Overall
Off Quantities
Measurement – Taking Off List /1