You are on page 1of 1

P.W.

Ghana Limited
P W GHANA
Civil Engineering and Mining Contractors
Site Offices
Tema Port Stacking & Marshalling Area B
Ghana

METHOD STATEMENT – SECTION 2 (GENERAL)


PW/MS/06
Work Section: Pavement Drainage
Activity: Construction of U - Drains
Prepared By: Solomon Adjasoo
Date: 22nd November 2006

1. All work, materials and plant must be in accordance with the Employers Requirements.
2. All drawings in use for site work must be clearly marked ‘ISSUED FOR CONSTRUCTION’
3. All works must be within the tolerances stated in the Employer’s requirements.
4. All Works Must be carried out in accordance with the Method Statement – Section 1
5. All personnel should be suitably qualified and competent to carry out the work for which they are
employed.
6. The work must be carried out in accordance with the following approved I.F.C drawings: -
 PW/ABC/200 Pavement Geometric Layout
 PW/ABC/301 General Drainage Layout
 PW/ABC/340 Pipes & U–Drain Details
 PW/ABC/332 Dangerous Cargo Drain Layout
 PW/ABC/339 Dangerous Cargo Drain Sections
 CPcp UD60x60 hab Typical Precast U-Drain
7. All concrete work must be in accordance with Section 10 of the Employers Requirements
8. The QC Management shall be in accordance with the Employers Requirements.

Signed……………………………………………. Project Manager

Page 1 of 1

You might also like