Contents
1. Introduction......................................................................................................................................................................................................... 2
2. Scope and Purpose.............................................................................................................................................................................................. 2
3. Who Does What and How Summary Table..........................................................................................................................................................4
4. Flowchart of Key Activities................................................................................................................................................................................... 5
5. Description of Key Activities and Responsibilities................................................................................................................................................5
6. KPI........................................................................................................................................................................................................................ 8
7. Documents and Records Management................................................................................................................................................................9
8. Review & Improvement..................................................................................................................................................................................... 10
9. Appendices - Insert details as required..............................................................................................................................................................10
MBS SOP 121 Approved 3.0 HSE Permits - Outsourced PM, Standard Operating Procedure Effective date 5/16/2012 4:02:00 PM Page 1 of 12
1. Introduction
To ensure that we meet our obligations to protect the health and ensure the safety of people assigned to work on behalf of Musanada and to
protect the environment in which we live and work, we require that our suppliers take appropriate steps to protect their staff from workplace
hazards and the environment from avoidable damage.
The nature of construction activities within Musanada means that suppliers employees and the environment may be exposed to various risks
during the execution of their work therefore it is required that those risks are assessed and systematically managed through a permit system.
This SOP applies to all in house PM construction projects under Musanada control.
This SOP defines the approach required for the contractor to define, communicate and obtain approval for activities that require an HSE permit
to work for MBS in house projects.
MBS SOP 121 Approved 3.0 HSE Permits - Outsourced PM, Standard Operating Procedure Effective date 5/16/2012 4:02:00 PM Page 2 of 12
MBS SOP 121 Approved 3.0 HSE Permits - Outsourced PM, Standard Operating Procedure Effective date 5/16/2012 4:02:00 PM Page 3 of 12
The contractor Assesses HSE risks related to planned work By developing and reviewing the activity method
activities statement
The contractor Requests a safety permit In accordance with Musanada HSE Permit requirements
The Engineer Reviews the permit request and issues the permit By assigning competent resources to review
The contractor Executes the work In accordance with the approved HSE Permit
MBS Project Manager Monitor the whole procedure To ensure adherence of all parties to requirements of this
procedure
MBS SOP 121 Approved 3.0 HSE Permits - Outsourced PM, Standard Operating Procedure Effective date 5/16/2012 4:02:00 PM Page 4 of 12
MBS SOP 121 Approved 3.0 HSE Permits - Outsourced PM, Standard Operating Procedure Effective date 5/16/2012 4:02:00 PM Page 5 of 12
The ‘Responsibility Matrix’ defined below illustrates key leadership and management responsibilities related to this procedure.
MBS SOP 121 Approved 3.0 HSE Permits - Outsourced PM, Standard Operating Procedure Effective date 5/16/2012 4:02:00 PM Page 6 of 12
Contractor
Activity
Engineer
Key Activities Description
PMC
ID
The
JOB 3 JOB 4 JOB 5
Forms used:
MBS TMT 245- Hot Work Permits
MBS SOP 121 Approved 3.0 HSE Permits - Outsourced PM, Standard Operating Procedure Effective date 5/16/2012 4:02:00 PM Page 7 of 12
R
5 Close Permit
Copy of close out permit is filed in project files along with IR
close out document.
MBS SOP 121 Approved 3.0 HSE Permits - Outsourced PM, Standard Operating Procedure Effective date 5/16/2012 4:02:00 PM Page 8 of 12
MBS SOP 121 Approved 3.0 HSE Permits - Outsourced PM, Standard Operating Procedure Effective date 5/16/2012 4:02:00 PM Page 9 of 12
6. KPI
Key Measurement
KPI Calculation Frequency Target KPI
Description
[KPI / PI calculation method
[KPI / PI title] [KPI / PI Description] [measurement frequency] [agreed KPI / PI target]
and/or equation]
MBS SOP 121 Approved 3.0 HSE Permits - Outsourced PM, Standard Operating Procedure Effective date 5/16/2012 4:02:00 PM Page 10 of 12
MBS SOP 121 Approved 3.0 HSE Permits - Outsourced PM, Standard Operating Procedure Effective date 5/16/2012 4:02:00 PM Page 11 of 12
All division heads shall review the effectiveness of the systems, processes and procedures related to business activities within their specific area of control at
least once each year.
In completing their review the respective division heads shall ensure that feedback and recommendations are provided by relevant technical specialists.
As an outcome of the review, Construction Director shall recommend potential improvements to Musanada Building Services Executive Director.
Musanada corporate management will review the summarized performance relating to corrective and preventive actions throughout Business and Support
divisions to verify the overall effectiveness of the Musanada Integrated Management System and initiate actions applicable to business and support divisions
MBS SOP 121 Approved 3.0 HSE Permits - Outsourced PM, Standard Operating Procedure Effective date 5/16/2012 4:02:00 PM Page 12 of 12