CONSTRUCTION OF A 1-STORY HOUSE

1. PROJECT MANAGEMENT
1.1. PROJECT INITIATION
1.2. CREATE PLAN
1.3. PLAN LAYOUT
1.4. PLAN RESOURCES
1.5. PLAN MATERIALS
1.6. MANAGE PROJECT PLANNING AND SCHEDULING
1.7. EXECUTE COST ESTIMATES
1.8. PROCURE MATERIALS
1.9. OBTAIN NECESSARY DOCUMENTS AND PERMITS
1.10. EXECUTE PROJECT
1.11. MONITOR AND CONTROL PROJECT
1.12. CLOSE PROJECT
2. SITE PREPARATION
2.1. PROCURE EQUIPMENTS AND MATERIALS
2.2. CLEAR SITE
2.3. SET UP STORAGE
3. STRUCTURAL WORK
3.1. PROCURE EQUIPMENTS
3.2. FOUNDATION CONSTRUCTION
3.3. FORMWORKS
3.4. FRAMING
3.5. ROOFING
3.6. EXTERIOR WALLS
3.7. INTERIOR WALLS
4. UTILITIES INSTALLATION
4.1. PROCURE EQUIPMENTS
4.2. INSTALL PLUMBING
4.3. WIRE ELECTRICAL SYSTEMS
4.4. SET-UP HVAC
5. INTERIOR FINISHING
5.1. PROCURE EQUIPMENTS
5.2. FINISH INTERIOR WALLS
5.3. INSTALL CEILING
5.4. COMPLETE FLOORING
5.5. LAYING OF TILES
5.6. APPLY PAINT AND WALL COVERINGS
5.7. INSTALL BUILT-IN CABINETS AND OTHER INTERIOR FIXTURES
6. EXTERIOR FINISHING
6.1. EXTERIOR WALL FINISHING
6.2. DOOR AND WINDOW INSTALLATION
6.3. LANDSCAPING
6.4. COMPLETE ROOFING
6.5. APPLY EXTERIOR PAINTS AND CLADDING
7. FINAL TOUCHES
7.1. LANDSCAPE AND ADD OUTDOOR FEATURES
7.2. CONDUCT FINAL INSPECTIONS AND OBTAIN APPROVALS
7.3. PERFORM CLEANING AND QUALITY CHECKS
7.4. HANDOVER OF BUILDING TO THE CLIENT