3 Phase Separator Maintenance Checklist

EQUIPMENT : DATE :

INDV. ID : RATING : …...........Psi

LAST MAINT. DATE : LAST MAINT. LEVEL :

Job No .:

Inspection Description   Verification / Action


Flushing and Purging
Safety Relief Valve ( PSV 1 ) Tested & Calibrated
Safety Relief Valve ( PSV 2 ) Tested & Calibrated

Fisher Control Valve ( PCV , LCV Oil , LCV Water ) Calibration Test

NRV's Functional For Non Return


Globe Valves Smooth Operation & Holding
Testing Daniel SR Meter 3" Smooth operation and hold test + (
Check Daniel's Gasket Kit
Orifice Set + Carriers + Spanner )
Testing Daniel SR Meter 6" Smooth operation and hold test + (
Check Daniel's Gasket Kit
Orifice Set + Carriers + Spanner )
Check Needle Valves & Fittings For holding and no leakage
Barton Chart Recorder
Oil Line Strainer
Water Line Strainer
Oil Turbine Meter 2" + Digital Flow Meter Calibrated + Flow
Meter Installed
Oil Turbine Meter 3" + Digital Flow Meter Calibrated + Flow
Meter Installed
Water Turbine Meter 2" + Digital Flow Meter Calibrated + Flow
Meter Installed
Pneumatic Pressure Gauges & Regulators
Thermometers & Thermowells
Inspection Description   Verification / Action
Sight Glasses
Pipes
Shrinkage Meter ( Tester )
Floaters ( Water & Oil )
Hydrostatic Pressure Test Rate …..............
UT & MPI Testing and Certification
Sling & Shackles Certification
Pad Eyes Tested and Certified
ID Plate Updated - Clear
Tools + Spares Exist
Skid Body And Paint In Good Condition
Flanges , Bolts & Nuts complete and good condition
Inlet & Outlet lines Thread in Good Condition
Brackets & Clamps complete and good condition
Color Code Updated
Parts used and Comments :

Yard Supervisor : Maint. Manager :

Signature : Signature :