PROZEAL GREEN ENERGY PRIVATE LIMITED

Document Name: Installation Checklist for MMS- Structures Material


Location.: Project Name.: GSECL 14MW SPV Project
Issue No.: 1 Revision No.: 0
Issue Date: 18-01-2024 Revision Date: NA

Characteristics/ Type of Check Status


SR Remarks
Brief about Parameter check details (Visual, Mech, Acceptance Norms OK/Not
NO.
operation Tech.) Ok
1) Unloading from vehicle
2)Verification of quantity &
identification
1 Unloading Visual No Physical Damage
3)Package Inspection
4)Reporting of damage/ missing
items

Stacking of
2 1. Size of structure Technical As per PO
structure material

2. Measurement of structure Technical As per drawing

3. Galvanizing Technical As per drawing

4. Damages/Breakages Visual As per drawing

5. Weight Technical As per PO

Installation of
structural material
like, column
3 sigma, rafter, 1. Installation of structure material Technical As per drawing
tilting link, module
support, end
clamp etc.

2. Tightening of structure fasteners Technical As per drawing

3. Levelling of Structure Technical As per drawing

Checked By Witnessed By Witnessed By Witnessed By