Professional Documents
Culture Documents
7ut Relay XFMR Protection Relay
7ut Relay XFMR Protection Relay
RELAY DETAILS
Network frequency HZ 60 Hz
1- Stability Test
Fault I I I T I I I T
Pickup Drop Trip Measured Pickup Drop Trip Measured
(A) (A) (A) (Secs) (A) (A) (A) (Secs)
I1 ( F =60 Hz ) I2 ( F = 120 Hz )
Phase I2 / I1 ratio %
(Pickup Value) Expected Blocking Measured
I5 ( F = 300 Hz )
Phase I5 / I1 ratio % I1 ( F =60 Hz )
Expected Blocking Measured
5- Slope Test:
Idiff / IN
Sec 2
Sec 1
Id Min
IREST / IN
END SECTION 1
END SECTION 2
i) Section 1:
Where bias current is between 0 ≤ Ibias≤ section 1, Idmin = 0.2, set End section 1 = 0.8
Injected at Injected at ID
Fault IR Measured Relay Action Status
W1/SCR1 W2/SCR2 Measured
ii) Section 2:
When bias current is between End sections 1 ≤ I bias ≤ End section 2
End section 2 = 5
Injected at Injected at ID
Fault IR Measured Relay Action Status
W1/SCR1 W2/SCR2 Measured
iii) Section 3:
When bias current is more than Ibias ≥ End section 2
Injected at Injected at ID
Fault IR Measured Relay Action Status
W1/SCR1 W2/SCR2 Measured
A 9.97 10 0.128 OK
50 B DMT 10 9.98 10 0.1 0.12 0.124 OK
Over C 9.98 10 0.122 OK
current A 3.428 6 10.6 OK
ANSI-
51 B 3.13 3.427 6 3.3 10.7 10.6 OK
INVERSE
C 3.427 6 10.5 OK
Earth
fault 50G N DMT 1.25 1.24 2 0.7 0.7 0.71 OK