Letter of Award
(LOA)
Documents
Site Clearance
Submission
Utilities Relocation Temporary Works
Piling Work @ GL A-
Earthwork
C1/1-4C
Piling Work @ GL
C1-H/1-4C
Pilecap @ GL A-C1/ Stump @ GL A-C1/ Ground Beam @ GL
1-4C 1-4C A-C1/1-4C
Ground Slab
Pilecap @ GL C1-H/ Stump @ GL C1-H/ Ground Beam @ GL
1-4C 1-4C C1-H/1-4C
1st Floor Column /
RC Wall
AAC Block / Brick
2nd Floor Beam & Electrical - Conceal
Acotec Wall Panel
Slab Conduit
Door Frame
2nd Floor Column /
FFS – Piping at Wall Ceiling Frame ACMV – Drain Pipe
RC Wall
Roof Level Beam
FFS - Piping at Soffit
and Water Tank Screeding ACMV - Ducting
Slab
Slab
Steel Structure FFS - Piping at Soffit
Staircase 1 Electrical - Wiring Piping Works
Installation Slab
Roof Staircase 2 Ceiling Panel Trunking & Wiring
Wall Tiles
Floor Tiles
Internal Painting
FFS - Fittings Electrical - Fittings Supply Unit
FFS – Booster Pump
Testing &
Commissioning
Handover