Rfi List Updated

The document lists various RFIs (Requests for Information) related to a commercial construction project, detailing their status, structure, stage, and specific work types. Most entries are currently pending, with some cleared and a few cancelled. The RFIs cover different floors and areas of the building, focusing on electrical, cable tray, and fire fighting installations.

Uploaded by

qwertykey3991
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views4 pages

Rfi List Updated

The document lists various RFIs (Requests for Information) related to a commercial construction project, detailing their status, structure, stage, and specific work types. Most entries are currently pending, with some cleared and a few cancelled. The RFIs cover different floors and areas of the building, focusing on electrical, cable tray, and fire fighting installations.

Uploaded by

qwertykey3991
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Sub Work Check Create Cleared Pending

RFI No Structure Stage Unit Coverage Drawing No Group Status Rounds


Unit Type List Date Date From
YDPL/ GCY/ C/2035-1/1 Commercial Floor 6 Corearea part-01 and part- LT-1106-00 Stage PVC/MS/ GI PVC/MS/ GI Pending 1 03/06/2025 Checker
02 / Floor Wise Conduit

YDPL/ GCY/ C/2030-1/1 Commercial Ground Floor (L-0) GF corearea and main LT-1103-00 Stage PVC/MS/ GI PVC/MS/ GI Pending 1 31/05/2025 Checker
entrance and / Floor Wise Conduit

YDPL/ GCY/ C/2029-1/1 Commercial Basement 1 Pour 1 ,2 ,3, LT-1102-00 Stage PVC/MS/ GI PVC/MS/ GI Pending 1 31/05/2025 Checker
/ Floor Wise Conduit

YDPL/ GCY/ C/2025-1/2 Commercial Floor 8 ST-01,L08 LT-1110-00 Stage Electrical Slab Conduiting Before- During Works Pending 1 30/05/2025 Checker
midlanding / Floor Wise

YDPL/ GCY/ C/2024-1/1 Commercial Basement 1 Corearea LT-1102-00 Stage PVC/MS/ GI PVC/MS/ GI Cleared 1 30/05/2025 31/05/2025
part-01 and 02 / Floor Wise Conduit

YDPL/ GCY/ C/1998-2/3 Commercial Basement 1 Pour3 CT-1102-00 Stage Cable Tray Supporting Pending 1 29/05/2025 Checker
/ Floor Wise

YDPL/ GCY/ C/2016-2/3 Commercial Ground Floor (L-0) corearea CT-1103-00 Stage Cable Tray Supporting Cleared 1 29/05/2025 29/05/2025
part-01and 02. / Floor Wise

YDPL/ GCY/ C/2016-1/3 Commercial Ground Floor (L-0) corearea CT-1103-00 Stage Cable Tray Preparation Cleared 1 29/05/2025 29/05/2025
part-01and 02. / Floor Wise

YDPL/ GCY/ C/1998-1/3 Commercial Basement 1 Pour3 EM-1003 Stage Cable Tray Preparation Cleared 1 24/05/2025 29/05/2025
/ Floor Wise

Fire Fighting
YDPL/ GCY/ core 01 and Stage
Commercial Basement 2 FF-1003-00 Sprinkler Pipe Before Work Pending 1 24/05/2025 Checker
C/1997-1/3 02 / Floor Wise
Installation

Fire Fighting
YDPL/ GCY/ core 01 and Stage
Commercial Basement 1 FF-1005-00 Sprinkler Pipe Before Work Pending 1 24/05/2025 Checker
C/1996-1/3 02 / Floor Wise
Installation

Fire
YDPL/ Basement core 01 and Stage Before
Commercial FF-1030-00 Fighting Sprinkler Pending 1 24/05/2025 Checker
GCY/ C/1995-1/3 3 02 / Floor Wise Work
Pipe Installation

YDPL/ GCY/ C/1994-1/2 Commercial Floor 11 SW-01 PW-1113-00 Stage Electrical Wall Conduiting Before - During Work Pending 1 24/05/2025 Checker
/ Floor Wise Works

YDPL/ GCY/ C/1993-1/1 Commercial Floor 11 Zone 2 SW-01 CS-1015-00 Unit Wise Services Cutouts, Grooves Before- During Works Pending 1 24/05/2025 Checker
and
Sleeves

YDPL/ GCY/ C/1992-1/1 Commercial Floor 11 Zone 2 SW-09A CS-1015-00 Unit Wise Services Cutouts, Grooves Before- During Works Pending 1 24/05/2025 Checker
and
Sleeves

YDPL/ GCY/ C/1991-1/1 Commercial Floor 11 Zone 2 SW-06A CS-1015-00 Unit Wise Services Cutouts, Grooves Before- During Works Pending 1 24/05/2025 Checker
and SLEEVES

Fire Fighting
YDPL/ GCY/ Stage
Commercial Basement 2 ZONE 01 FF-1003-00 Sprinkler Pipe During Work Pending 1 23/05/2025 Checker
C/1926-2/3 / Floor Wise
Installation

YDPL/ GCY/ C/1975-1/3 Commercial Basement 1 Pour - 2 and 3 FF-1005-00 Stage Fire Fighting Sprinkler Before Work Cleared 1 22/05/2025 29/05/2025
/ Floor Wise Pipe Installation

Fire Fighting
YDPL/ GCY/ Stage
Commercial Floor 4 core area 2 FF-1011-00 Sprinkler Pipe Before Work Pending 1 21/05/2025 Checker
C/1970-1/3 / Floor Wise
Installation
Fire Fighting
YDPL/ GCY/ Stage
Commercial Floor 4 core area 1 FF-1011-00 Sprinkler Pipe Before Work Pending 1 21/05/2025 Checker
C/1968-1/3 / Floor Wise
Installation

Fire Fighting
YDPL/ GCY/ Stage
Commercial Floor 5 core area 2 FF-1012-00 Sprinkler Pipe Before Work Pending 1 21/05/2025 Checker
C/1967-1/3 / Floor Wise
Installation

Fire Fighting
YDPL/ GCY/ Stage
Commercial Floor 3 core area 2 FF-1010-00 Sprinkler Pipe Before Work Pending 1 21/05/2025 Checker
C/1966-1/3 / Floor Wise
Installation

Fire Fighting
YDPL/ GCY/ Stage
Commercial Floor 3 core area 1 FF-1010-00 Sprinkler Pipe Before Work Pending 1 21/05/2025 Checker
C/1965-1/3 / Floor Wise
Installation

Fire Fighting
YDPL/ GCY/ Stage
Commercial Floor 5 pour 3 FF-1012-00 Sprinkler Pipe Before Work Pending 1 21/05/2025 Checker
C/1964-1/3 / Floor Wise
Installation

Fire Fighting
YDPL/ GCY/ Stage
Commercial Floor 5 core area 1 FF -1012 -00 Sprinkler Pipe Before Work Pending 1 21/05/2025 Checker
C/1961-1/3 / Floor Wise
Installation

Fire Fighting
YDPL/ GCY/ Stage
Commercial Ground Floor (L-0) POUR 01 ff-1007-00 Sprinkler Pipe During Work Pending 1 20/05/2025 Maker
C/1697-2/3 / Floor Wise
Installation

YDPL/ GCY/ C/1671-2/3 Commercial Floor 3 POUR 03 F-1010-00 Stage Fire Fighting Sprinkler During Work Cleared 1 20/05/2025 31/05/2025
/ Floor Wise Pipe Installation

YDPL/ GCY/ C/1927-2/3 Commercial Basement 1 Pour 2 EM-1003 Stage Cable Tray Supporting Pending 1 16/05/2025 Checker
/ Floor Wise

YDPL/ GCY/ C/1942-1/3 Commercial Floor 1 (L-01) Pour 3 CT-1104-00 Stage Cable Tray Preparation Cleared 1 16/05/2025 29/05/2025
/ Floor Wise

Fire Fighting
YDPL/ GCY/ Stage
Commercial Basement 1 FPS ZONE 01 FF-1005-00 Sprinkler Pipe During Work Pending 1 13/05/2025 Maker
C/1619-2/3 / Floor Wise
Installation

YDPL/ GCY/ C/1927-1/3 Commercial Basement 1 Pour 2 EM-1003 Stage Cable Tray Preparation Cleared 1 13/05/2025 15/05/2025
/ Floor Wise

YDPL/ GCY/ C/1926-1/3 Commercial Basement 2 ZONE 01 FF - 1003- 00 Stage Fire Fighting Sprinkler Before Work Cleared 1 13/05/2025 15/05/2025
/ Floor Wise Pipe Installation

YDPL/ GCY/ C/1885-1/1 Commercial Basement 1 Zone 3 Between C-02 and C-03 CS-1102-00 Unit Wise Services Cutouts, Grooves Before- During Works Pending 1 03/05/2025 Checker
and Sleeves

YDPL/ GCY/ C/1882-1/2 Commercial Floor 10 SW-01 PW-1112-00 Stage Electrical Wall Conduiting Before - During Work Pending 1 02/05/2025 Checker
/ Floor Wise Works

YDPL/ GCY/ C/1881-1/1 Commercial Floor 10 Zone 2 SW-01,L-10 CS-1014-00 Unit Wise Services Cutouts, Grooves Before- During Works Pending 1 02/05/2025 Checker
and Sleeves

YDPL/ GCY/ C/1860-1/1 Commercial Floor 10 Zone 2 SW-32A CS-1014-00 Unit Wise Services Cutouts, Grooves Before- During Works Pending 1 28/04/2025 Checker
and Sleeves
YDPL/ GCY/ C/1859-1/1 Commercial Floor 10 Zone 2 SW-31A CS-1014-00 Unit Wise Services Cutouts, Grooves Before- During Works Pending 1 28/04/2025 Checker
and Sleeves

YDPL/ Commercial Floor 7 Staircase LT-1106-00 Stage Electrical Before- Pending 1 24/04/2025 Maker
GCY/ C/1846-1/2 2,L07 / Floor Wise Slab Conduiting During Works
midlanding

YDPL/ GCY/ C/1844-1/2 Commercial Floor 8 staircase 1,L08 landing FV-111100 Stage Electrical Slab Conduiting Before- During Works Pending 1 24/04/2025 Checker
/ Floor Wise

YDPL/ GCY/ C/1835-1/2 Commercial Floor 7 staircase1 L07 midlanding LT-1106-00 Stage Electrical Slab Conduiting Before- During Works Pending 1 23/04/2025 Checker
/ Floor Wise

YDPL/ GCY/ C/1774-1/2 Commercial Floor 10 SW-33 PW-1112-00 Stage Electrical Wall Conduiting Before - During Work Cleared 1 16/04/2025 16/04/2025
/ Floor Wise Works

YDPL/ Commercial Floor 5 Corearea CT-1107-00 Stage Cable Supporting Cleared 1 16/04/2025 16/04/2025
GCY/ C/1767-2/3 part-01 ,L05 / Floor Wise Tray

YDPL/ GCY/ C/1767-1/3 Commercial Floor 5 Corearea part-01 ,L05 CT-1107-00 Stage Cable Tray Preparation Cleared 1 15/04/2025 16/04/2025
/ Floor Wise

YDPL/ GCY/ C/1722-2/3 Commercial Basement 2 CT-1101-00 CT-1100-00( Stage Cable Tray Supporting Cleared 1 15/04/2025 23/04/2025
Core Area part-1) / Floor Wise

YDPL/ GCY/ C/1721-2/3 Commercial Floor 5 pour 1 and 2 FF-1012-00 Stage Fire Fighting Sprinkler During Work Cleared 2 15/04/2025 15/05/2025
/ Floor Wise Pipe Installation

YDPL/ GCY/ C/1724-1/3 Commercial Basement 3 shsg-C sjsb Stage Cable Tray Preparation Cancelled 1 08/04/2025
/ Floor Wise

YDPL/ GCY/ C/1722-1/3 Commercial Basement 2 CT-1101-00 B2 floor core-1 area Stage Cable Tray Preparation Cleared 1 08/04/2025 10/04/2025
/ Floor Wise

YDPL/ GCY/ C/1721-1/3 Commercial Floor 5 pour 1 and 2 FF-1012-00 Stage Fire Fighting Sprinkler Before Work Cleared 1 08/04/2025 10/04/2025
/ Floor Wise Pipe
Installation

YDPL/ GCY/ C/1620-2/3 Commercial Floor 4 ZONE 01 FF-1011-00 Stage Fire Fighting Sprinkler During Work Cleared 1 05/04/2025 15/05/2025
/ Floor Wise Pipe
Installation

YDPL/ GCY/ C/1697-1/3 Commercial Ground Floor (L-0) POUR 01 FF-1007-00 Stage Fire Fighting Sprinkler Before Work Cleared 1 05/04/2025 15/05/2025
/ Floor Wise Pipe
Installation

YDPL/ GCY/ C/1690-1/2 Commercial Floor 9 SW-01 ,L09 PW-1111-00 Stage Electrical Wall Conduiting Before - During Work Cleared 1 04/04/2025 05/04/2025
/ Floor Wise Works

YDPL/ GCY/ C/1689-1/2 Commercial Floor 8 Staircase 2,L08 landing FV-1111-00 Stage Electrical Slab Conduiting Before- During Works Cleared 1 04/04/2025 05/04/2025
/ Floor Wise

YDPL/ GCY/ C/1688-1/2 Commercial Floor 7 Staircase 1,L07 landing FV-1110-00 Stage Electrical Slab Conduiting Before- During Works Cleared 1 04/04/2025 05/04/2025
/ Floor Wise

YDPL/ GCY/ C/1679-1/3 Commercial Basement 2 B2 Core 1 Area CT-1101-00 Stage Cable Tray Preparation Pending 1 03/04/2025 Maker
/ Floor Wise

YDPL/ GCY/ C/1678-1/3 Commercial Basement 2 B1 floor core 1 CT-1101-00 Stage Cable Tray Preparation Pending 1 03/04/2025 Checker
/ Floor Wise

YDPL/ GCY/ C/1671-1/3 Commercial Floor 3 POUR 03 FF-1010-00 Stage Fire Fighting Sprinkler Before Work Cleared 1 03/04/2025 04/04/2025
/ Floor Wise Pipe
Installation

YDPL/ GCY/ C/1616-2/3 Commercial Basement 1 Pour 1 ,B1 EM-1003-00 Stage Cable Tray Supporting Cleared 1 26/03/2025 28/03/2025
/ Floor Wise

YDPL/ GCY/ C/1625-1/3 Commercial Basement 1 AHU plant Rm EM-1003-00 Stage Cable Tray Preparation Cleared 1 26/03/2025 27/03/2025
/ Floor Wise
YDPL/ GCY/ C/1620-1/3 Commercial Floor 4 ZONE 01 FF-1011-00 Stage Fire Fighting Sprinkler Before Work Cleared 1 25/03/2025 27/03/2025
/ Floor Wise Pipe Installation

YDPL/ GCY/ C/1619-1/3 Commercial Basement 1 FPS ZONE 01 EMM23-0021- GY-FPS- Stage Fire Fighting Sprinkler Before Work Cleared 1 25/03/2025 28/03/2025
06 / Floor Wise Pipe Installation

FPS L03 Fire


YDPL/ Stage During
Commercial Floor 3 POUR 1 AND ff003 Fighting Sprinkler Pending 1 25/03/2025 Maker
GCY/ C/1409-2/3 / Floor Wise Work
02 Pipe Installation