PARADIGM 9/14/07 7:58 AM Page 168

PARADIGM CONSTRUCTION CO.


■ Buckingham Village Townhomes – Team work is very important in our abili- to optimize the construction program for
Located in Arlington, Va., this $23 mil- ty to ensure quality.” a specific site. He says that because site
lion development will have 69 luxury costs are a significant aspect of a typical
town homes; each of them will be four Value-Added Controls budget, Paradigm’s experience in cut-and-
stories and include a two-car garage. Foster says every Paradigm project en- fill issues, dewatering methods, founda-
■ Town Center Plaza – This $11 million sures cost control from day one. He ex- tion design and building and parking de-
project in Washington, D.C., is a renova- plains this starts in the conceptual stage sign help to reduce premium costs.
tion of an existing 128-unit high-rise apart- when the construction and development Lastly, Foster says the company adds
ment building constructed in 1960. It will teams are working together to estimate “measurable value” to its projects through
be rehabilitated to offer 108 modern units costs from the preliminary information. its experience in choosing the right de-
with new roofing, windows, HVAC, plum- The company’s goal, Foster says, is to sign team, including design/build compo-
bing and mechanical systems, and archi- avoid false starts, costly modifications nents and working with the entire proj-
tectural finishes. and lost opportunities, so it uses concep- ect team to secure high-quality design
■ 2301 Columbia Pike - This $46 million tual estimating to ensure the latest ex- and reasonable construction costs.
project in Arlington will have a seven- penditures and commitments are acc-
story concrete frame, 188 apartment essible for making timely and acc- Expertise Equals Growth
units, 30,000 square feet of retail space, urate cost projections. Foster says Paradigm’s “working experi-
14,000 square feet of office space and Paradigm also ensures a project is cost ence” with a team of expert develop-
three levels of underground parking. effective by being involved early in the ment, design and construction personnel
■ Square 673 – Also located in design process. Foster stresses everyone bring “significant benefits” to its projects.
Washington, D.C., this is a 13-story high- must work together to create a design “Our skills have allowed us to have sig-
rise, including 470 apartments and three that will produce a budget-friendly, high- nificant growth in the last few years,”
levels of underground parking. The con- quality project. He notes Paradigm helps Foster says. “Last year, we had $155 mil-
tract amount is $110 million. owners and designers by suggesting lion in sales, this year we expect to have
“We work hard to maintain high stan- alternatives that lower costs, accelerate $185 million and next year we are pro-
dards of quality in every project we are the schedule and provide more value. jecting $220 million.
involved with,” Foster says. “We have a Another way in which Paradigm “We will continue to grow because
strict quality control program in place that assists owners is through developing work is picking up. As long as we keep
involves a series of checklists. location and site criteria. Foster explains doing what we’re doing, we will con
“Our multiple superintendents onsite this requires understanding of topographic tinue to grow in a reasonable way,
oversee the very detailed quality control and soil conditions, stormwater manage- keep our customers happy and keep
plan and the field workers implement it. ment techniques and slope management our company profitable.” ■

168 ■ CONSTRUCTION TODAY ■ OCTOBER 2007