Information regarding MoU signed IPPs as on May.

2010
Sl. No Compan y Name

Propose Location Land Water Coal d of the Capacity Plant, Total Already Total Quantity Coal req. Coal of plant District Require acquired quantity already (MTPA) Block (MW) / ment (or in Require allotted Allotted Project MoU Signed with Govt. of Orissa on 09.06.2006 (Total Capacity-3130 MW, State Share-782.5 MW), State share = 1 GMR Kamalang a Energy Ltd. 1050 (3x350) (Rs.4540 Cr.) HLCA cleared enhancem ent to 1400 Mahanadi 1030 Aban (2x515) Power Co (Rs.4257 Ltd. Cr.) Kamalang 1175.76 a, Ac Meramund GL-145.1 ali, Ac Dhenkanal PL1030.66 Ac (For. L78.5 Ac) Tehranpur , Talcher, Angul 1035.98 Ac. GL-57Ac PL978.98Ac 1011.025A c For Govt. land of 69 Ac permissive possessio n obtained. Nil Alienation of Govt. land under process. 6(1) notificatio Nil 6(1) notificatio n issued, Letter from IDCO received for deposit of 42 cusecs from Brahmani River Approval of WRD obtained for 30 Cusecs (Ph-1). 2.06 cusecs water Final Clearance letter for 35.81 cusec of water issued by WRD on WRD has issued clearance for drawl of 42 Cusecs.Ce ntral Ground water authority 4.85 Rampia, Dip Side Rampia (112.22 MT Coal)

40 cusecs Brahmani River

6.3

Nava Bharat Power (P) Ltd.

1050 (Rs.4700 Cr.) MoU signed for 1040 MW

Meramund 1093.3Ac ali & GLKhadagpr 88.47Ac asad, PLDhenkanal 1002.59 Ac

42 cusecs Brahmant River

4.701

Rampia Dip Side Rampia (112.22 MT Coal)

MoU Signed with Govt. of Orissa on 26.09.2006 (Total Capacity-12970 MW, State Share-2850.5 MW), State shar 4 K.V.K 1050 Kandarei, 945.1Ac 260.26 Ac Nilachal (3x350) Athgarh GL-238.29 6 (I) Power (P) (Revised) Cuttack Ac For. notificatio Ltd, (Rs. 5000 (New Ln issued Cr.) MoU location) 165.85Ac for signed for PL227.826 1200 MW 540.96Ac Ac of pvt land. 260.26 Ac. Nil Bhushan 2000 Ghantigad 1793 Ac Energy (in one ia, GL-622 Ac Proposal Ltd go) Talbahal, PL-1171 submitted (Rs. 8483 Nuahata, Ac (forest to IDCO with Cr.) Angul land-288 deposit of Ac) Water allocation for 48 cusecs issued by WRD on 15.04.08. Central Ground 70 cusecs WAC from sanctione Brahmani d 40 River cusecs of water on 28.08.200 48cusecs from Mahanadi River 5.76

15

CESC Ltd.

Essar Power Ltd.

1000 Neulapoi , 1094.13 (2x500) Dhenkanal Ac (Rs.4042. GL61Cr.) 190.39Ac Forest L20.76 1000 Paranga 1070 Ac (Rs. 4860 Talcher, GL-300 Ac Cr.) Angul PL-770 Ac

Jindal 1200 Deranga, India (Revised) Talcher Thermal (2x600) Angul Power Ltd (Rs.6136 (New Cr.) SWCA location) cleared enhancem ent to 1800 Lanco 1320 Kurunti, Babandh Power Private Ltd. (2X660 MW) (Rs.7158 Cr.) SWCA cleared enhancem ent to 2640 1000 (2x500 MW) (Revised) (Rs.4107. 25) Khadag Prasad, Dhenkanal (New location)

10

Monnet Power Company Ltd.

Malibrahm ani & Nisha, Chendipad a Angul

11

Sterlite Energy Ltd

2400 (4x600 MW) (Rs.7481 Cr.)

Burkhamu nda, Jharsugud a

678 Ac Lease deeds executed for 88.95 Ac of Govt Nil 4(1) issued for private land. 6(1) under process. 151 Ac 1100Ac 1063Ac. GL-262 Ac Lease Forest L Deeds Nil executed PL-838 Ac for 254 Ac of Govt. land & Rs 4.94 Cr paid, 1400 Ac 549.06 Ac GL-109.87 6(1) Ac , issued for Forest Lprivate 18.7 Ac land,Rs.6. PL-929.77 6 Rc paid Ac to IDCO, invoice recived Rs.72 Cr 993.42Ac 635.725 Ac GL-498.04 Ac For. L- Govt land 45.18 Ac 296.73 Ac PL-495.38 & private land Ac 338.995 Ac in possessio n. Balance pvt land 156.385 3000 Ac 705 Ac GL576 Ac Pvt 478.13Ac land,129 PLAc Govt 2536.47 land Ac Land for main plant &

40 cusecs from Brahmani River

40 cusecs from Brahmani River

40 cusecs from Brahmani River (upstream of Samal Barrage)

40 cusecs from received Brahmani for 40 River cusecs from WRD on 07.02.09. constructi on water 1.1 cusec 40 cusecs Allocation from received Brahmani for 27 River cusecs from WRD. Water pipe line survey completed . 73 cusecs WMP Hirakud submitte. Reservoir Laying of (7.7 km) water pipe line is under progress. Final

Permissio n accorded for 40 cusecs on 5.4.08 by Water drawal reccomme ndation obtained for 40 cusec from WAC Received commitme nt for 40 cusecs of water from WRD on 2.6.08. Central Ground Allocation

4.53

5.4

5.76

Mandakini (96.84 MT Coal)

6.5

Rampia Dip Side Rampia (112.22 MT Coal)

5.45

Mandakini (96.84 MT Coal)

13.25

Rampia, Dip Side Rampia (112.22 MT Coal)

12

Tata Power Company Ltd.

13

Visa Power Ltd.

1000 (HLCA cleared for 2000 MW) (Rs. 4348 Cr. ) 1000 (4x250) (Rs.4498 Cr.)

Naraj 985.304Ac Marthapur GL-158.82 , Cuttack Ac Forest L46.12Ac PL780.084 Ac Brahaman 1089 Ac abasta GL-309 Ac Athagarh, PL-780 Ac Cuttack

Nil Govt. Land of 62.67 Ac leasable land sanctione d. Pvt. 160 Ac. 160 Ac Govt. land allotted. 133 Ac of private land 9(3) completed , 202 Ac

40 cusecs from Mahanadi River

Allocation for 40 cusecs of water received from WRD on 40 cusecs 24.09.200 20 cusecs from water Mahanadi approved River by WRD for ph-I. Balance 20 cusec cleared by WAC.

Mandakini (96.84 MT Coal)

6.2

MoU Signed with Govt. of Orissa on 07.02.2009(Total capacity-9850 MW , State share-1182-1379 MW), State sh 14 Aarti Steel Ltd. 500 (4x125) (Rs.2065 Cr.) 50 MW already commissio Astaranga 2640 Power Co. (4x660) Ltd. (Rs.11200 Cr.) Ghantikhal , Athagarh Cuttack 755 Ac. IPICOL recemmen ded for allocation. GMS Power Pack WAC recommen ded for 50 cusec for Ph-1 Undertaki 41 cusec WAC Land from Survey, recommen plot plan Mahanadi ed 41 river completed Cusec , land water applicatio 545 Ac. 28 cusec Assurance from Ib / obtained 545 Ac Pvt. land Mahanadi for 28 river directly cusec of purchased water from Land from WRD owners, 5000 on per Appllied to As cum/hr MoU JSPL IPICOL. from Request participate Mahanadi in for river relocating constructi system on of the site for the barrage IPP from near 20 cusec 80 Ac. from 80 Ac. Of Mahanadi existing river land of steel plant utlised for IPP. Only Applied to 20,000 IDCO cum/hr from Devi river 2.844

15

Astaranga , Nuagarh Puri

2500 Ac

6.5

16

17

18

Chambal 1320 Infrastruct (2x660) ure & (Rs.7550 Ventures Cr.) HLCA Ltd. cleared enhancem Ind Barath 700 Energy (2x350) (Utkal) (Rs.3150 Ltd. Cr) SWCA cleared enhancem ent 700 to Jindal 1320 Steel & (2x660) Power (Rs.5940 Ltd. Cr)

Siaria, 1300 Ac Dhenkanal

6.6

Sahajbaha 725 Ac. l, GL-179.43 Lakhanpur Ac , PL-545.57 Jharsugud Ac a Boinda, 1545 Ac Angul

3.4

7.67

19

Kalinga Energy & Power Ltd.

20

21

1000 Babuchak 1000 Ac location (4x250 uli, will be MW) Sambalpur changed (Rs.4261 as 600 Ac Cr) of forest Sahara 1320 Titlagarh, 950 Ac LA India (2x660) Bolangir PL-808.45 proposal Power (Rs.6911 (New filed with Ac Corpn Ltd. Cr) location) GL-138.18 IDCO, Survey Ac) works are Visaka 1050 Deopara, 1200 Ac Recomme Thermal Power Pvt. Ltd. (2x525) Bhandari (Rs.4810 Pokhari, Cr.) MoU Bhadrak signed for (New 1100 MW location)

IPICOL recommen ed 40 Cusec water to WAC cleared for 50 cusec of water. 44 cusec Applied to ndation from WRD, sent by Baitarani IPICOL IPICOL to river recommen IDCO, system ded water IDCO to WRD. 40 cusec from Bheden/ Mahanadi river system 53 cusec from Tel / Mahanadi river system

6.3

6.2

Information IPPs who have signed MoU during 2010 Sl. No Compa MoU on Locatio State Likely ny Date n Capacit Share( Commi Name y (MW) MW) ssionin g 1 09.04.2 BGR Bhapur, Energy 010 12 Plan Nayagar 1320 158.4 System Period h Ltd JR 2 09.04.2 Redhakh Powerg ol, SBP & 12 Plan 011 en 1980 237.6 KishoreN Period Private agar, Ltd Adhunic 09.04.2 Angul 3 Birmaha Power & 012 12 Plan Natural rajpur, 1320 158.4 Period Resourc Sonepur es Ltd Maadur 09.04.2 4 ga 013 Tangi, 12 Plan Thermal 60 7.2 Cuttack Period Power Compan Vijaya 09.04.2 5 Turlakha Ferro & 014 mar,Kesi 12 Plan Power 120 14.4 nga,Kala Period Private handi Ltd

Jindal 06.05.2 Luni, Stainles 010 Dhenka s Ltd nal Total

1320 6120

158.4 734.4

12 Plan Period

Coal

Status of Environment clearance Coal Linkage Obtained

Financial Closure

LOA/EPC Placement, Ordering of BTG Equipment

Likely Commissionin g Schedule

Expenditure till date/ Signing of BPTA/Other clearances

2.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable co for 1050 Environment FC achieved MW al clearance on 27.05.09 received IDFC is from MoEF principal lender 5.02.08. , Consent for establishment issued by OPCB 30.04.08 Concent for SBI caps establishemnt appointed fin. issued by Consult. FC 6 OPCB . months from Presentation allocation of made before coal linkage MoEF for final clearance for 1050 Environment Project MW al Clearance appraisal by received PFC. FC from MoEF. achieved on Consent for 09.12.09 establishment of OPCB received on 07.08.08. Lahmeyer Internl. appointed as owners consultant, EPC ordered to SEPCO, China. NTP for BTG package issued. Mantech Synergies Pvt Ltd appointed as Owner's Consultant. Selection of EPC contractor in progress Lahmeyer Int'nal appointed as Owner's consultant, LOI issued to INDURE Ltd for EPC. BTG to Harbin, China Sep-2011, Nov-2012, Dec-2012, Rs. 850 Cr. BPTA signed. RTC from Min. of Railway, GoI. NoC for Chimney from Airport AI

June -2013/ within 36 months of the financial closure

Rs. 20.00 Cr.

Mar-2012 (balance in interval of 4 months)

Rs. 78.02 Cr. BPTA signed. RTC from Min. of Railway, Chimney Height from Airport AI

850.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable for 1000 Environment FC achieved, MW al Clearance PFC appointed received as Financial from MoEF. Advisor. Concent for Project issued by OPCB on 19.12.08. ToR received. EIA submitted Desien August/2012 appointed as Owner's consultant. EPC awared to Nagarjun Construction. BTG package finalised with after Dec-2013 Rs.261.63 Cr. BPTA signed. RTC from Min. of Railway, Chimney Height from Airport AI

ToR cleared. EIA/EMP submitted & Public Hearing expected shortly Public hearing completed. EIA / EMP completed & submitted to OPCB & MoEF. for 600 MW Obtained Concent for Project from OPCB on 18.11.08 & Environment Clearance from MoEF on 29.09.08 Concent for Project issued by OPCB on 16.03.09. Environment Clearance from MoEF on 13.09.09 MoEF clearance for 2640 MW Concent for Project issued by OPCB . Presentation before MoEF held on 12-0308 for Final Environmental Clearance
FC achieved for Unit-1 on 08.10.08 & Unit-2 on 22.12.09 through SBI Cap

Development Consultant Ltd appointed as Owner's consultant. LOI issued for BTG Package

Dec-2012, Jun-2013

Rs. 49 Cr.

Oct-2012 , Dec2012 / (4 years after availability of land)

for 660 MW

for 600 MW

TCE appointed Unit-1: Dec-2012 Rs. 320 Cr. as Owner's Unit-2: Mar-2013 BPTA initiated. consultant, BTG RTC from Min. of package Railway, NoC ordered on for Chimney BHEL with from Airport AI, advance Constn. Power payment of from CESU Rs.135.36 Cr. Unit-1, Dec-2013 PFC appointed Lahmeyer Rs.192 Cr. as Financial International Unit-2,Mar-2014 BPTA signed. Consultant. FC appointed as RTC from Min. of achieved on Owner's Railway, Dec-09. consultant, EPC Chimney Height ordered to from Airport AI LITL, BTG package placed with Dongfang, China. BoP IDFC appointed DCPL appointed Jul-2012, Rs.410 Cr. as Financial as Owner's Oct-2012 BPTA signed. Consultant. FC consultant EPC RTC from Min. of achieved. order issued on Railway, NoC for 04.03.10. BTG Chimney from ordered on Airport AI, BTG BHEL. & BOP ordered ESP/Boiler material received at site. BOP package Consent of SBI Caps DCPL appointed U#1: Jul-10 Rs. 4823 Cr. OPCB received appointed as as Owner's U#2: Sep-10 on 21.09.06. Financial consultant. EPC U#3: Dec-10 MoEF Advosor. awared to U#4: Mar-11 clearance Expenses met SEPCO, China, obtained on from own Construction Dec07 funding activities in final stage.

Consent for project issued by OPCB. Presentation made before MoEF for final EC. ToR approved by MoEF. EIA/EMP submitted to OPCB. Public hearing conducted on Feb'09

EPC/ BTG package finalised & will be issued after physical possession of land SBI Caps DCPL appointed appointed as as Owner's Financial Advisor. consultant. EPC FC pending due consultant is to non all'tion of being finalised
land & coal linkage.

Oct- 2013 (36 months after land acquired)

Rs.55.19 Cr.

Mar-2012 (42 months from coal linkage allottment)

Rs. 6.75 Cr.

2-1379 MW), State share = 12-14% of power generated from the plant at variable cost depending on the availability of co applied to GoI with recommen dation of GoO applied to GoI with recommen dation of GoO applied to GoI with recommen dation of GoO for 700 MoEF MW clearance obtained on 30.11.09 FC achieved with Axis bank for 1st Unit ToR obtained. Agreement with EIA submitted. SBI patiala for For 50 MW term loan MoEF clearance obtained, applied to Energy Infratech Pvt Ltd appointed as consultant TCE appointed as Owner's consultant, Commissioned 50 MW in Mar2010, balance in 12th Plan Period 12 Plan Period

12 Plan Period (48 months from FC)

EPC placed with Cethar Vessels Ltd. BOP order placed with Punj Lloid

Unit -1: Dec, 2011, Unit-2: Mar,2012

BPTA signed. Chimney Height from Airport AI

applied to GoI with recommen dation of GoO

Applied for TOR to MoEF, EMRTC appointed as consultant

12 Plan Period

Applied for TOR to MoEF,

12 Plan Period

applied to GoI with recommen dation of GoO applied to GoI with recommen dation of GoO

TOR obtained from MoEF, EIA under process TOR obtained from MoEF, EIA under process

e-Gateway Pvt Ltd appointed as Owner's Consultant

U# 1-June -2014 U# 2-Dec-2014

U# 1-Mar -2014 U# 2-Sep-2014

bove 80% PLF at variable cost

above 80% PLF at variable cost

ing on the availability of coal block

Information regarding MoU signed IPPs proposed to be set up in Orissa.


Sl. No 1 2 3 4 5 6 7 8 9 10 11 12 13 Company Name Bhushan Energy Ltd CESC Ltd. Essar Power Ltd. GMR Kamalaga Energy Ltd. MoU on
26.09.2006 26.09.2006 26.09.2006 09.06.2006 Location Ghantigadia, Angul Neulapoi, Dhenkanal Paranga, Talcher, Angul Kamalanga, Dhenkanal

Capacity (MW) 2000 1320 1000 1400 1800 1050 1320 1320 1050 1050 2400 1000 1320 17030

State Share (MW) 500 330 250 350 450 262.5 330 330 262.5 262.5 600 250 330 4257.5 60 316.8 158.4 163.2 158.4 158.4 158.4 126 1299.6

Likely Commissioning Schedule Dec-14 Mar-2014, Sep-2014 MoU period not extended, IPP file closed Sep-2011, Nov-2011, Feb-2012 Dec-2012, Mar-2013 March/2012 Dec-2013, Mar-2014 Jun-2014, Dec -2014 Jul-2012 , Oct-2012 Mar-2012 ( balance in interval of 3 months) 600 MW in Aug-2010 (balance in interval of 3 months) Oct- 2013 (36 months after land acquired) Jun-2014 (42 months from coal linkage allottment) 50MW commissioned in Mar-2010, balance in 12th Plan Period 2015-2016 2016-2017 Dec-2011, Mar-2012 2015-2016 2015-2016 June -2014, Dec-2014 2015-2016

20102011

20112012

2012- 20132013 2014

20142015 250

2015- 20162016 2017 500 330 500 330

20172018 500 330

20182019 500 330

165

330

350

350 150

350 300 262 165

350 450 262 330 165

350 450 262 330 330 262 262 600 250 330 4256 60 158

350 450 262 330 330 262 262 600 250 330 4256 60 316 79

350 450 262 330 330 262 262 600 250 330 4256 60 316 158 163 158 158 158 126 1297

350 450 262 330 330 262 262 600 250 330 4256 60 316 158 163 158 158 158 126 1297

26.09.2006 Deranga,Talcher, Angul Jindal India Thermal Power Ltd K.V.K Nilachal Power (P) Ltd, 26.09.2006 Kandarei,Athgarh, 26.09.2006 Lanco Babandh Power Projects Ltd. 09.06.2006 Tehranpur,Talcher, Mahanadi Aban Power Co Angul Ltd. Monnet Power Company Ltd. 26.09.2006 Malibrahmani,Nisha, Cuttack Kurunti, Dhenkanal

131

262

262

262 262

262 262 600 250 165

Nava Bharat Power (P) Ltd. Sterlite Energy Ltd Tata Power Company Ltd. Visa Power Ltd. Sub Total

09.06.2006 26.09.2006 26.09.2006 26.09.2006

Angul Khadagprasad, Dhenkanal Burkhamunda, Jharsuguda Naraj Marthapur, Cuttack Brahamanabasta, Cuttack Ghantikhal, Cuttack Astaranga, Puri Siaria, Dhenkanal Sahajbahal, Jharsuguda Boinda, Angul Sodamal, Kuchinda, Jharsuguda Titlagarh, Bolangir Deopara, Bhadrak

300

600

600

600 125

300 6

1081 6

1624 60

2491 60

3676 60

14 15 16 17 18 19 20 21

Aarti Steel Ltd. Astaranga Power Co. Ltd. Chambal Infrastructure & Ventures Ltd. Ind Barath Energy (Utkal) Ltd. Jindal Steel & Power Ltd. Kalinga Energy & Power Ltd. Sahara India Power Corporation Ltd. Visaka Thermal Power Pvt. Ltd. Sub Total

07.02.2009 07.02.2009 07.02.2009 07.02.2009 07.02.2009 07.02.2009 07.02.2009 07.02.2009

500 2640 1320 1360 1320 1320 1320 1050 10830

84

163

163

163 158 158

163 158 158 158 126 1218

158

158 126

90

60

223

381

981

22 23 24 25 26 27

BGR Energy System Ltd JR Powergen Private Ltd Adhunic Power & Natural Resources Ltd Maadurga Thermal Power Company Ltd Vijaya Ferro & Power Private Ltd Jindal Stainless Ltd Sub Total Total

09.04.2010 09.04.2010 09.04.2010 09.04.2010 09.04.2010 06.05.2010

Bhapur, Nayagarh Baija, KishoreNagar, Angul Birmaharajpur, Sonepur Tangi, Cuttack Turlakhamar,Kesinga,K alahandi Luni, Dhenkanal

1320 1980 1320 60 120 1320 6120 33980 85% PLF

158.4 237.6 158.4 7.2 14.4 158.4 734.4 6291.5

2015-2016 2015-2016 2016-2017 June/2011 2016-2017 2016-2017


7 307 260.95 7 1178 1001 7 1691 1437 7 2721 2313 7 4064 3454 7 7 7 7

158 237

158 237 158

158 237 158 7 14 158 732 6285 5342

158 237 158 7 14 158 732 6285 5342

7 14 158

402 5639 4793

732 6206 5275

OTHER COMPANIES PROGRESSED TO SET UP THERMAL POWER PROJECTS IN ORISSA Company Name 1 2 3 4 5 6 7 Ultra Mega Power Plant 02 nos. Shell Company (UMPP Pattern) NTPC NTPC TTPS-NTPC -Expansion OPGC Unit-3 & 4- Expansion OTPCL (Joint Venture of OHPC & OMC) Develope rs MoP/PFC MoP/ PFC CPSU CPSU CPSU State PSU State PSU
Location Bedabahal, Sundergarh not Finalised Dalipali, Sundergarh Gajamara, Dhenkanal TTPS, Talcher IB Thermal, Jharsuguda Kamakyanagar, Dhenkanal

Capacity (MW) 4000 8000 3200 3200 1320 1320 2000

State Share 1300 4000 1600 1600 660 660 2000

Likely Commissioning Schedule 2014-15 2016-17 2015-16 2015-16 2014-15 2014-15 2015-16
1000 2000
7820

650

1300

1300

1300

1300

800

1600

1600

1600

800

1600

1600

1600

660 660

660 660

660 660

660 660

660 660

2000
7820

2000
7820

15040 85% PLF Total Power(100% availability from IPPs) Present availability(80% of installed capacity 4100 MW) Total Available Power(100% availability from IPPs) CEA 17th EPS OPTCL Proposed forecast(2009-10 to 2018-19)

7820

1970

5220

0 260.95 3280

1674.5

4437

6647

6647 11989 3280 15269

6647 11989 3280 15269

1001.3 1437.4 2312.9 5128.9 9230.2 11922 3280 3280 3280 3280 3280 12510 3280 15202

3540.95 4281.3 4717.4 5592.9 8408.9 4020 3706 -479.05 -165.05 4459 4300 -177.7 -18.7 4958 5270 5417 5694 5812 5927

6135

6362

6614

7196

Suplus/Deficit of Power(100% availability from IPPs) as per CEA Suplus/Deficit of Power(100% availability from IPPs) as per OPTCL

-240.7 175.85 2596.9 -552.7 -101.2 2481.9 6375.2 8840.1 8655.3 8073.3

Peak Demand (MW) Forecast by CEA & OPTCL & Availability


Power Demand CEA(17th EPS) OPTCL Forecast Peak Power Available 2010-11 4020 3706 3941 2011-12 4459 4300 4281 2012-13 4958 5270 4717 2013-14 5417 5694 5593 2014-15 5812 5927 8409 2015-16 2016-17

6135 12510

6362 15202

Peak Demand (MW) Forecast by CEA & OPTCL & Availability


18000
16000

14000
12000

Axis Title

10000 8000 6000 4000 2000 0


CEA(17th EPS) 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

4020 3706 3941

4459 4300 4281

4958 5270 4717

5417 5694 5593

5812 5927 8409 6135 12510 6362 15202 6614 15269

OPTCL Forecast Peak Power Available

Peak Demand (MW) Forecast by CEA & OPTCL & Availability


18000 16000 14000 12000 Peak Power in MW 10000 8000 6000
4000 2000

0 CEA(17th EPS)

2010-11 4020

2011-12 4459

2012-13 4958

2013-14 5417

2014-15 5812

2015-16

2016-17

2017-18

2010-11 CEA(17th EPS)


OPTCL Forecast

2011-12 4459 4300 4281

2012-13 4958 5270 4717

2013-14 5417 5694 5593

2014-15 5812 5927 8409

2015-16 6135 12510

2016-17 6362 15202

2017-18

4020 3706 3941

Peak Power Available

15269

ailability
2017-18 2018-19

6614 15269

7196 15269

L & Availability

2017-18

2018-19

6614 15269

7196 15269

CL & Availability

2017-18

2018-19

You might also like