ENTER WELL NAME IN CELL A5 Current mud weight = 12.5 Depth last casing set = 4,000' Running String Land Out Above RKB = 21.33' Type mud system = Low pH Desco Length of Running String and Tools = 1,527.33' MD drilled for this job = 9,850 RKB ID of Running String = 4.276 JOINTS LEFT OUT OF STRING #1, 2, 3, 4, and 5
CASING CHECK WELLHEAD RKB to Subsea Wellhead = 1,506.00'
Total pipe left out of string, ft 220.06 Total pipe tallied, ft 8,516.48 CALCULATED ANN VEL FOR JOB Total Pipe Run, ft 8,296.42 RATE, bpm 10 15 Casing Check Status Good News AV, fpm 134 202 Casing check: (pipe run + plus pipe out) = to the amount tallied. PUMP, spm 85 128 Enter the bpm to calculate an AV & PUMP spm to circulate and cement this casing string. ESTIMATED PSI WHEN PLUG DOWN SUGGESTED RATES ... Column Length of Mud, ft 6,659 CIRCULATION RATE: SAME AS MAX AV WHEN DRILLING THIS SECTION OF HOLE. Total Hydrostatic PSI Annulus 6,735 DISPLACEMENT RATE: @ 1-1/2 TIMES THE Total Hydrostatic PSI Casing 6,407 CIRCULATION RATE. BUMP PLUG: @ 1/2 CIRCULATION RATE. * Final Surface Pressure 328
SPACER LEAD CEMENT
Type Dual Type cement 50/50 Posmix RUNNING SEQUENCE Length, ft 672 Length, ft 2,000 (ENTER RUN ORDER AND OTHER INSTRUCTIONS FOR STRING)
Volume,bbl 50 Sacks To Mix 917 1. Davis Lynch Float shoe
Density, ppg 15.0 Additive 1 3% D20 2. 2-Joints #193, #192. TAIL CEMENT Additive 2 .045 gps D81 3. Davis Lynch Float collar. Type cement Class H Additive 3 .2% D-46 4. Run Joints #191 through #6, joints. Length, ft 500 Additive 4 5. Wellhead Assembly with X/O joint. Sacks To Mix 455 Density, ppg 14.0 6. Running string with tools, and land out. Additive 1 .045 gps D81 Yield, ft³/sx 1.29 7 Additive 2 .2% D46 Mix Water, gps 5.95 8 Additive 3 Thick Time, hrs 5.0 9 Additive 4 Thread Lock FS, FC and connections in between. *Final pressure neglects Density, ppg 16.4 friction pressure, assumes Check FS and FC for circulation. Yield, ft³/sx 1.07 a gauge hole and full mud Mix Water, gps 4.36 returns during the EST. TOC = 7350' Thick Time, hrs 3.0 job. STRING MAKE-UP
CENTRALIZERS or EQUIVALENT Wellhead Ass'y = 6.69'
Used Per Jt. Starting Jt. # Ending Jt. # Quantity Used X/O Joint To Wellhead Ass'y = 18.88' 2 193 191 6 Amount of Casing = 8210.90' 1 190 190 1 Float Collar = 1.47' 0 Shoe Joint(s) = 85.52' Float Shoe = 1.97' Total Footage Run = 8,325.43' 0 0 0 TOTAL USED 7 FC Depth Float Collar = 9,742.47' DISPLACEMENT Pump output, bbl/stk 0.117 To Latch DP Plug, bbls 27.1 To Land Casing Plug, bbls 918 FS Depth Float Shoe = 9,829.46' To Land Casing Plug, stks 7,846 Depth Casing Set = 9,831.43' Casing plug kicked out with mud, and no water ahead. Displaced with rig Amount of Rathole = 18.57' pumps. ID Last Casing = 14.822 TYPE WELLHEAD & TEST PRESSURE This Casing OD = 11.875 Mfg & Size = Dril-Quip 13-5/8" x 11-7/8" Nominal ID This Casing = 10.711 Test PSI = 3600 Hole Size For Casing = 14.75 Date Run: ###