Professional Documents
Culture Documents
P/Name : Part List Attached P/No : Model Name : Model List Attached
1) Man Change
□ Major/special process worker Change □ Quality Head change
2) Machine Change
□ Old to new production Line installation □ Another production facility installation (Same model)
□ Facility moving (in house/out of company) □ Duplicate Mold/Tool/Jigs/Fixture of existing model
3) Method Change
□ Production place change □ Sheet Metal/Molding condition change, □ Major work condition change
□ Inspection Method change (SQA / In-Process / PDI) □ Sub - Supplier change,
□ Process outsourcing at sub supplier or moving from sub supplier to in-house
□ Packing method change □ Working method change
4)Material
□ Parts material, grade change, □ Hazardous material change
□ Use of Old raw material □ Change in material properties □ Change in sub material like oil, solvent (Flux),Protection Vinyl,
□ Brazing Gas change
5) Other
□ Organization Name Change
3.Explanation of Change
FM/ML/000