National Highway
Ministry Authority
of Communications
National Highway Authority
Start
National Highway www.nha.gov.p
Islamabad – August, 2019
Mission Statement
Promote national integration through an efficient, reliable, safe and
environment friendly road network for sustainable economic growth
and improved life standards
NHA - An Overview
• Established in 1991 through an Act of Parliament (NHA Act-1991)
NHA
NHA Executive
Executive Board
Board
Chairman,
Chairman, NHA
NHA
Members
(12)
General Managers
(71)
Directors
(194)
Human Resource
Intermodal Split (Pakistan)
100% 95%
90%
90%
80%
Passenger Trafc
Freight Trafc
70%
60%
50%
40%
30%
20%
10% 5% 8%
2%
0%
Road Rail 0% Air
M2
Legend Yarik
Pindi
Bhatian
DI Khan
Highways M4
Motorways Zhob Lahore
Gojra
Chaman M3
Motorway UC. N50 Shorkot
Abdul Hakeem N5
N65
Multan
Quetta M4
Khanewal
Surab Shahdad M5
Kot Rato Shikarpur
Basima
Wanguhills
Khuzdar Dero Total Roads 264,000 Km
N30
M8 655
155
105
Sukkur NHA Network 12,743 Km (4.82%)
225
N85
N5
N25
M6 Road Type Existing Under Total
305 Construction
M8 Hoshab
Highway 10,300 389 10,689
N10 120
M10
M9 Hyderabad Motorway 1,580 474 2,054
Gwadar Karachi
110
Total: 11,880 863 12,743
For more details [Link]
Existing National Highways Network
Length in Kilometers
Sr. No. Route No. Road Description
Motorway Highway
1 N-5 Karachi-Lahore-Peshwar-Torkham - 1819
2 N-10 Makran-coastal; liari-Ormara-Gwadar-Jiwani - 653
3 N-15 Mansehra-Naran-Jalkhad - 240
4 N-25 Karachi-Kalat-Quetta-Chaman - 813
5 N-30 Basima – Khuzdar - 110
6 N-35 Hassanabdal-Thakot-Khunjrab - 806
7 N-40 Lakpass-Dalbandin-Taftan - 610
8 N-45 Nowsehra-Dir-Chitral - 309
9 N-50 Kuchlack-Zhob-D.I.Khan - 531
10 N-55 Kotri-Larkana-D.G.Khan-D.I.Khan-Peshawar - 1264
11 N-65 Sukkur-Sibi-Quetta - 385
12 N-70 Multan-D.G.Khan-Loralai-Qali Saifullah - 447
13 N-75 Islamabad-Satra Mile-Lower Topa-Kohala - 54
14 N-80 Tarnol-Fateh Jang-Jand-Khushal Garh-Kohat - 146
15 N-85 Hoshab-Panjgur-Nag-Baseema-Sorab - 449
16 N-90 Khwazakhela – Besham - 64
17 N-95 Chakdara – Kalam - 135
18 N-105 Larkana - Naudero – Lakhi - 61
19 N-110 Gharo - Keti Bunder - 90
20 N-120 Hyderabad - Mirpukhas - Khokhrapar - 220
21 N-125 Taxila - Khanpur – Hairpur - 44
Continue….
Existing National Highways Network
Length in Kilometers
Sr. No. Route No. Road Description
Motorway Highway
22 N-155 Larkana - Moenjo Daro Road - 28
23 N-255 Larkana - Nasirabad via RasheedWagan - 34
24 N-305 Sakrand - Shaheed Benazirabad - 35
25 N-455 Larkana - Kamber – Shahdadkot - 50
26 N-655 Ratodero - Naudero Road - 18
27 S-1 KKH-Skardu Road (Strategic Road) - 167
28 S-2 Kohala-Muzaffarabad - 40
29 S-3 Muzaffarabad – Chakothi - 55
30 M-1 Islamabad-Peshawar Motorway 155 -
31 M-2 Lahore-Islamabad Motorway incl. 32 Km 367 -
32 M-3 Abdul Hakeem – Lahore 230 -
33 M-4 Pindi Bhattian – Faisalabad – Multan (up to Abdul Hakeem) 204 -
- M-4 Ext. Khanewal – Multan Section 56 -
35 N-5A Khanewal – Lodhran - 98
36 M-5 Sukkur - Multan 392 -
37 M-8 Gwadar – Hoshab, Khuzdar – Ratodero - 444
38 M-9 Karachi - Hyderabad 136 -
39 M-10 Karachi Northern Bypass - 57
40 E-35 Burhan – Havelian (Burhan - Shah Maqsood) 40 -
41 - Layari Expressway - 16
42 Peshawar Northern Bypass (PNBP) 8
Sub Total 1,580 10,300
Total Existing National Highways Network 11,880
Under Construction New Motorways and Highways
Length in Kilometers
Sr. No. Route No. Road Description
Motorway Highway
- M-4 Pindi Bhattian – Faisalabad – Multan (Abdul Hakeem - Multan) 34 -
- E-35 Burhan – Havelian (Shah Maqsood - Havelian) 17 -
43 CPEC Havelian - Thakot 39 79
44 CPEC Islamabad – DI Khan 293 -
45 SLM Lahore - Sialkot 91 -
46 LEBP Lahore Eastern Bypass - 16
47 - Yakmach - Kharan - 198
48 - Kohat – Jand – Pindi Gheb 73
- Peshawar Northern Bypass (PNBP) 23
Sub Total 474 389
Grand Total (Existing + Additional) 2,054 10,689
Total Network 12,743
Khunjrab
MOTORWAY NETWORK Havelian
Havelian –– Thakot
Thakot
CPEC
Gilgit
86% 119.Km
119.Km(Motoryway:
(Motoryway:39km)
39km)
Completion:
Completion:Feb-20
Feb-20
Raikot
N35
S1
Burhan
Burhan –Havelian
–Havelian (E-35)
(E-35)
97%
N45 N95
Thakot ADB
ADB57
57kmkm
N15 Completion:
Completion:Mar-19
Mar-19
Peshawar
Peshawar -- Islamabad
Islamabad (M-1)
(M-1) Peshawar
155 Havelian S2 S3
155km
km M1
Burhan 125
Islamabad
N75 Hakla-DI
Hakla-DI Khan
59% 293 Khan
293km
km
N80 Completion:
Completion:May-19
May-19
N55
Lahore
Lahore -- Islamabad
Islamabad (M-2)
(M-2) Pindigheb
BOT
BOT367
367km
km Sialkot Lahore
Lahore –– Sialkot
Sialkot
Mianwali M2
64% BOT
BOT91
91km
Operational
km
Pindi Bhatian Completion:
Completion:Aug-19
Aug-19
Yarik
DI Khan Lahore
Pindi
Pindi Bhatian
Bhatian –– Faisalabad
Faisalabad (M-
(M- Zhob M4
4)
4) Gojra Lahore
Lahore –– Multan
Multan (M-3)
(M-3)
53
53km
km N50
Shorkot M3 99% 230
230km
km
Substantially
SubstantiallyCompleted
Completed
Abdul Hakeem
N65
N70 Multan
Quetta Khanewal
Faisalabad
Faisalabad –– Gojra
Gojra (M-4)
(M-4) Gojra
Gojra –– Shorkot
Shorkot (M-4)
(M-4)
ADB
ADB 58
58km
km 100% ADB
ADB62
62km
km
Completed
Completed
N40 N65
M5
Khanewal
Khanewal –– Multan
Multan (M-4
(M-4 Ext.)
Ext.)
Surab Wanguhills Shorkot
Shorkot –– KWL
KWL (M-4)
(M-4)
IDB
IDB56
56km
km Khuzdar
Rato Shikarpur
Shahdad Dero 78% ADB
ADB65
65km
km
Completion: Jun-19
Basima Kot Completion: Jun-19
N30
M8
655
105
Sukkur
Sukkur-Multan
Sukkur-Multan (M-5)
155
(M-5)
CPEC
225
Legend
N85
99% 392
392km
km
Completion:
Completion:Aug-19
Aug-19
Highways N25 M6
Motorways Hoshab 305
M8
Motorway UC.
Hyderabad Hyderabad–
Hyderabad– Sukkur
Sukkur (M-6)
(M-6)
N10 BOT
BOT 299
299km
km(Under
(UnderProcurement)
Procurement)
Karachi
120
M9
Gwadar
Sections Operational U.C. Total Completion in Karachi
Karachi –– HYD
HYD (M-9)
(M-9)
2018
110
98% BOT
BOT136
136km
km
15 689 km 1,365 km 2,054 km 2019 Substantially
SubstantiallyCompleted
Completed
Or After
Khunjrab
MAJOR ON-GOING HIGHWAY PROJECTS
Gilgit
Kohat
Kohat –– Jand
Jand –– Pindi
Pindi Gheb
Gheb Jaglot
Jaglot -- Skardu
Skardu (S-1)
(S-1)
(Dualization
(Dualizationand
and Improvement)
Improvement) N35
N35
Raikot S1
S1
164
164km
km
73 km,Completion:
73km, Completion: July-20
July-20 N45
N45 N95
N95
Completion:
Completion:July-20
July-20
Thakot
N15
N15
Kohat
Kohat –– Sarai
Sarai Gambila
Gambila Peshawar
(Dualization
(Dualizationand
and Improvement)
Improvement)
Havelian S
S2 S3
S3
Rehab
Rehab &
& Imp.
Imp. of
of Chakdara
Chakdara
128 km,Completion:
128km, Completion: May-20
May-20
M1
Burhan 125
125
2N75
N75 Islamabad Kalam
Kalam (N-95)
(N-95) SFD
SFD 82
82km
km
N80
N80
N55
N55
Kallur
Kallur Kot
Kot Bridge
Bridge Pindigheb
(4
(4Lane
LaneBridge
Bridgeover
overriver
riverIndus)
Indus) M2
Sialkot Peshawar
Peshawar Northern
Northern Bypass
Bypass
1.29 km, Completion: Nov-19
1.29 km, Completion: Nov-19 Mianwali
31
31km
km
Pindi Bhatian Completion:Dec-19
Yarik Completion:Dec-19
DI Khan Lahore
Old
Old Bannu
Bannu Road
Road Zhob
Gojra
M4
(Dualization
(Dualizationand
and Improvement) Metro
Improvement) Shorkot M3 Metro Bus
Bus Project
Project
83 km, Completion:
83km, Completion: Feb-20
Feb-20 N50
N50
25.6
25.6km
km
Abdul Hakeem Completion:
Completion:Apr-19
N70
N65 Multan
DG Khan
Apr-19
Quetta Khanewal
Zhob
Zhob –– Mughalkot
Mughalkot (N-50)
(N-50)
ADB
ADB 81
81km
km Lahore
Lahore Eastern
Eastern Bypass
Bypass
Completion:
Completion:Apr-19
Apr-19 16km
16km
N65
N65
Completion:
Completion:Mar-19
Mar-19
N40
N40 M5
Surab Wanguhills
Yakmuch
Yakmuch –– Kharan
Kharan Rato Shikarpur
Shahdad Dero
198
198km
km Khuzdar
Completion:
Completion:Jan-20
Jan-20
Basima Kot
Layyah
Layyah –– Taunsa
Taunsa Bridge
Bridge
N30
N30 M8
M8
655
655 105
105
Sukkur 1.2
1.2kmkmBridge
Bridge&&20
20km
kmApproach
Approach
225
225
155
155 Roads
Roads Completion:Feb-20
Completion:Feb-20
N85
N85
Petaro
Petaro –– Sehwan
Sehwan (N-55)
(N-55)
ADB
ADB 130 km
130 km N25
N25 M6 Q.Saifullah-Waigum
Q.Saifullah-Waigum Rud
Rud (N-70)
(N-70)
Completion:
Completion: Jun-19 Hoshab Legend
Jun-19 M8
M8
305
305
ADB
ADB 128
128km
km
Highways Completion:
Completion:Apr-19
Apr-19
N10
Hyderabad Motorways
N10
Motorway UC.
Karachi 120
120
Gwadar M9
Rakhi
Rakhi Gaaj
Gaaj –– Bewata
Bewata (N-70)
(N-70)
Mobilization Stage JICA
JICA 32.4
32.4km
km
110 Completion:
Completion:July-19
110
On-Going Projects Length (Km) Cost (Rs Billion) July-19
Sialkot – Lahore Construction of 4-lane motorway, Concessionaire: M/s LSMIM, signed on Feb
2 Motorway 91.4 43.84 connecting industrial city Sialkot with 28, 2017. Under Construction
Lahore.
3 Karachi-Hyderabad 136 44.25 Conversion of existing 4-lane Highway Concessionaire: M/s SCORE, Pakistan -
Motorway (M-9) into 6-lane Motorway - ON BOT BASIS Completed and opened for traffic.
* Concession Term 20 to 25 years ** Land to be provided by Government *** Expected Rate of Return = 15% to 20%
PPP Policy & Regulatory Framework
Public Private Partnerships (PPP) is being promoted by NHA to bring skills / efficiency and to augment limited
public resources through participation of private sector.
INSTITUTIONAL ARRANGEMENTS
For granting service to private sector NHA has adopted legal and institutional mechanisms to ensure that the
service is provided efficiently and the responsibilities assumed by the private sector are fulfilled.
NHA has established a fully functional and dedicated PPP Cell for:
1. Promotion of PPPs including providing information
2. Coordinating with relevant agencies
3. Preparing and negotiating Concession Agreements
4. Monitoring the Concessionaires performance in accordance with the respective Agreements
5. Generally safeguarding the public interest.
PPP Policy & Regulatory Framework
TOLL POLICY
Concessionaires will be given the right to collect tolls at appropriate locations approved by NHA, within their
specified Concession Area.
TOLL ESCALATION
Escalation of toll charge will be permitted, using the formula defined in the Concession Agreement, which is
generally based on CPI.
The maximum toll escalation factor that will be allowed in any year will be calculated as (1+(r/100))
where: r is the annual rate of growth (%) in the Consumer Price Index, over the most recent 12-month period for which statistics
are available.
INCENTIVES
NHA PPP projects incentives are available according to:
The guidelines of board of investment (BOI).
Securities and Exchange Commission of Pakistan providing easy modes and guides to start of business
companies in Pakistan. Like Promoters Guide, Standardization of Articles and Memorandum of Association.
TENDERING PROCEDURES
Tendering procedures are made open, fair & transparent consistent with PPP Policy.
Competitive bidding process, under single stage two envelop system, is adopted
Standard Pre-qualification documents, Request for Proposals including Model Concession Agreement have
already been developed.
PPP Project Cycle
Motorways
Links
Rupee Foreign Total
PSDPHavelian
(2019-20)
Allocation
– Thakot Section Thakot Thakot
(Million) (CPEC)23,000
1,000 Kaghan
Thakot
Tunnel 615m
N35
N35 N15
N15
PSDP No 108 Details
Length 119.7 km Structures
Battal
Tunnel 2,906m
Construction of 39.5 km
Scope 4 Lane Motorway, 80.2 Karmong
km Class-II Highway Tunnel 442m
Underpasses 12 No.
K73+260-K75+025 1765 629.90 877.50 1507.40 85.4% 493.50 720.00 1213.50 68.8%
Abbotabad 1 #
1 Tunnel
ZK73+316-ZK75+040 1724 512.90 854.00 1366.90 79.3% 394.10 789.00 1183.10 68.6%
3 Mansehra Tunnel K100+922-K103+450 2528 910.00 1136.00 2046.00 80.9% 790.00 916.00 1706.00 67.5%
4 Karmang Tunnel K136+227-K136+669 442 210.00 24.00 234.00 52.9% 116.00 0.00 116.00 26.2%
5 Battal Tunnel K144+874-K147+780 2906 1188.00 1291.00 2479.00 85.3% 990.00 1062.00 2052.00 70.6%
6 Thakot Tunnel K176+125-K176+640 615 615.00 615.00 100.0% 615.00 615.00 100.0%
Havelian – Thakot Section (CPEC)
Item Status
Mobilization 1,411 Chinese Staff Mobilized;
6,433 Pakistani Staff Mobilized;
3,232 Sets of Equipment Mobilized;
41 Construction Camps/Yards Completed and Occupied.
Havellian
Shah
Maqsood
Haripur
N35
N35
Contractor M/s CGGC-GRC (JV) M/s CGGC-AM (JV) M/s LIMAK-ZKB (JV)
Dhok Syedan
PACKAGE-V N80
N80 Hakla
Pindigheb - Hakla (M-1) N-80
63 km Karapa
Thatti Kalran M2
PACKAGE-IV N5
N5
Tarap-Pindi Gheb Pindigheb
50km
Tarap
PACKAGE-III
Mainwali-Tarap
52km Daud Khel
N50
N50
DI Khan
Project
Project Features
Features
Hakla – DI Khan Motorway (GOP)
PSDP No. 109 Rupee Foreign Total
Length 293 km PSDP (2019-20)
Allocation (Million)
Scope Construction of 4 Lane Access Controlled Motorway 13,000 0 13,000
PC-I Cost 110.2 Billion
Const. Cost 100 Billion
PACKAGE-I Aug-18
(Yarik (DIK) – Rehmani Khel) 55 12.90 80% Sep-16
M/s NLC Expected: Sep-19
Jun-19
P-2A 25.4 9.23 75% Jul-17 Expected: Dec-19
PACKAGE-IV Sep-19
(Tarap-Pindi Gheb) 51.2 21.39 50% Nov-16 Expected: Mar-20
M/s ZKB-Limak JV
PACKAGE-V Jan-19
(Pindigheb-Hakla (M-1)) 63 16.80 44% Jan-17 Expected: Mar-20
M/s ZKB-Limak JV
Lahore – Sialkot Motorway Sambrial Sialkot
(BOT) Wazirabad
Sambrial
Sambrial
PSDP (2019-20) Rupee Foreign Total
Allocation (Million)
281.54 0 281.54
Daska
Daska
PSDP No 125
Length 91.4 km Pasrur
Pasrur
Pasrur
Construction of 4-Lane Access Gujranwala
Controlled Motorway with 6-lane
Scope Structures, including ITS and Gujranwala
GujranwalaNarowal
Horticulture
Mode Build, Operate, Transfer (BOT) Narowal
Narowal
M/s Lahore Sialkot Motorway
Concessionaire infrastructure Management (LSMIM) N-5
N-5
(FWO) Muridke
Muridke
Concession 25 Years
Period Umer
Umer Kot
Kot
43.84 Billion
Project Cost Incl. 18 Billion Viability Gap Funding & 5 Billion GoP
Loan
LSM
LSM LEBP
LEBP
PC-I Cost
(Land & Utilities) 5.9 Billion Alignment
Alignment
Concession Feb-17 (Effective Date) KSK
KSK
Completion Dec-19 99 Interchanges
Interchanges
Chiniot Lahore
Dhamaka Lahore
Nankana Sahib
Faisalabad
Jhang M4
Jaranwala Mangtanwala N5
N5
Gojra
Samundri
PSDP No 122
TT Singh Length 230 km
Scope Construction of 6 Lane Motorway
Okara PC-I Cost
Pir Mahal 150.67 Billion
PC-I Cost 51 Billion
Abdul Hakeem Rajana (Land & Utilities) (PKM Global)
Sahiwal EPC Cost 148.65 Billion
Contractor China Railway 20 Group-ZKB JV Alignment
Alignment
Section 2-A
Gojra –Jamani Gojra
31 km
8.35 Billion
M/s Xinjiang Beixin
T T Singh
TT Singh
Section 3-A
Shorkot – Dina Pur M3
31 km
11.22 Billion
M/s China Gezhouba - GRC JV
Progress: 79%
Dina Pur
Abdul Hakeem
11
11 Interchanges
Interchanges
Jaccobabad N5
N5
66 Service
Service Areas
Areas
Ghotki
55 Rest
Rest Areas
Areas
M8
M8 Pano Aqil
Sukkur Project
Project Features
Features
N10
N10
55 Drone Video
Sukkur CPEC
Sukkur – Multan Motorway
Financial PSDP Allocations (Rs in Million) Expenditure (Rs in Million)
Year FC LC Total FC LC Total
Hyderabad
M9
Bholari
Hyderabad
Thano Bulla Khan
Industrial Valley
Dada Bhoy
Rupee Foreign Total
PSDP (2019-20)
Allocation (Million) 200 0 200
PSDP No 121
Length 136 km
M10
M10 Memon Goth Nooriabad Concession Period 25 Years
NHA’s Share Rs.143 Billion
Scope Conversion of existing 4-Lane
Highway to 6-Lane Motorway
Luckey Cement Cost 44.25 Billion
N5
N5 Alignment
Alignment
PC-I Cost 3.70 Billion
Malir (Land, Utilities etc.)
Contractor M/s SCORE (FWO) 88 Interchanges
Interchanges
Commencement Jul-15
Karachi Completion Substantially Completed Project
Project Features
Features
Progress 98%
Major Projects
Links
Rupee Foreign Total
PSDP (2019-20)
Allocation (Million) 3,500 0 Jaglot – Skardu (S-1) (EPC-F)
Gilgit
PSDP No 119
Length 164 km
Scope Rehabilitation & Improvement of
2-Lane Highway
PC-I Cost 32.32 Billion
EPC Cost 31 Billion
Jaglot Contractor M/s FWO
N35
Commencement Jun-17
S-1
S-1
Completion Jun-20
Progress 22% Bridges Details
Raikot
Astore
Skardu
Replacement of Temporary Bridges with Permanent Bridges
Replacement of Temporary Bridges with Permanent Bridges
Bridge Length Bridge Type / Configuration
Gilgit Sassi
Sassi Bridge
Bridge (m)
Km 25+525
Km 25+525 Spans Alam Bridge
Length
Location Bridge 101 Bridge Type/ Configuration
Steel Equipment (Modular Delta) 2 Lane (3 spans, 30 bays)
(Nos) Sassi Bridge
(m) 24 Pre-Stressed Concrete 2 Lane (Single Span)
Brumdoor
Brumdoor Bridge
Bridge Brumdoor Bridge 30 Pre-Stressed Concrete 2 Lane (Single Span)
Km 36+850
Km 36+850 Steel
45 Equipment (Modular Delta)
Km 1+650 Alam Bridge 3 101
Tungush Bridge Steel Equipment (Modular Delta) 2 Lane (Single Span, 12 bays)
2 Lane
Sapper Shaheed Bridge (3 Equipment
137 Steel spans,(Modular
30 Delta)
bays) 2 Lane (3 Spans, 31 bays)
Alam
Alam Bridge
Bridge
Km
Km 1+650
1+650 Jaglot
Km 25+525
N35 Sassi Bridge 1 24 Single Span Pre-Stressed Concrete
S-1
S-1
Km 36+850
RiakotBrumdoor Bridge 1 30 Single Span Pre-Stressed Concrete
Tungush
Tungush Bridge
Bridge
Km
Km 122
122 Steel Equipment (Modular Delta)
Km 122 Tungush Bridge 1 45 Shigar
2 Lane (1 span, 12 bays)
Sapper Shaheed
Astore Sapper
Sapper Shaheed Steel Equipment (Modular Delta)
Shaheed Bridge
Bridge
Km 145 3 137km 145 2 Lane (3 spans, 31 bays)Skardu
km 145
Bridge
Replacement of Temporary Bridges with Permanent Bridges
Number of bridges 5 No. (3 x Mabey Modular Delta & 2 x RCC bridges)
Source of funding Road Maintenance Account (RMA)
Contractor M/s FWO
Contract Cost PKR 730 Million
Lane / Load Capacity;
Existing: (Single lane) / 17-25 Tons
Design: (Two Lanes) / 70 Tons
Completion Date December, 2018
Physical Progress 100%
N-45 Khwazakhela
Besham
N-90
Timergara
Chakdara – Bahrain-Kalam (N-95) 22 Bridges, 1.68 B
Mangora Thakot
Chakdara- Bahrain-
Packages Comm. Compl. Progress
Bahrain Kalam
No. of Bridges 10 No’s 12 No’s 42%
Jan-18 Jul-19
Const. Cost 0.78 B 0.90 B -
Bridge Package Lot-II : Termination of Contract under process. Case is under
Chakdara litigation.
Peshawar Northern Bypass (GOP)
Package - 2
Pa
3-A Northern c
ge– Bypass 7. kag
6 e
acka km –
1
P Moza
Hargoni M1
3- B
e–
Takhta Baig
ag
(Khyber Agency)
N5
ck
PSDP No 131
Pa
Length 30.6 km
N5
Scope Construction of
4-Lane Expressway
PC-I Cost 21.34 Billion
N-5 -I
Golra
Golra Morr
Morr
Interchange
Interchange Pkg
m
M-1 8K
kg-II
P
N-5
N-5
Interchange
Interchange
.8 km
3
kg-III
P
N-5
M-1
M-1 // M-2
M-2 .3 km
Interchange
Interchange 8
Top
Top City
City
Interchange
Interchange
PSDP No 107
25.6 km
Pk
Length
g-
NIIA
km
Periphery
Periphery
Road
Road Cargo
Cargo Link
Link From
From
PC-I Cost 16.43 Billion
Thallian
Thallian to
to NIIA
NIIA Const. Cost 15.19 Billion
Construction of Infrastructure and Allied works for
Metro Bus Services Peshawar Morr - New International Airport
Rupee Foreign Total
Length 25.6 km PSDP (2019-20)
Allocation (Million) 1,250 0 1,250
Infrastructure and Allied works for Metro
Scope Rapid Transit Bus Services (Bus Station 7
No.)
PC-I Cost 16.43 Billion
Total Const. Cost 15.19 Billion
Section / Package Peshawar Morr to NUST NUST – Golra Morr – G.T Rd G.T Road – M-1 / M-2 Int Link Rd From M1/M2 to NIIA
Const. Cost 6.58 Billion 5.50 Billion 1.38 Billion 1.73 Billion
Contractor M/s NLC M/s CRFG-MATRACON-TTC JV M/s MORE / FWO M/s NLC
Package-I Package-II
Section / Package Lahore Ring Road to Kala Khatai Road Kala Khatai road to Lahore Sialkot
inc-Bridge on River Ravi Motorway
Length 11 km 5 km
Const. Cost 7.41 Billion 2.59 Billion
Contractor M/s ZKB-RELIABLE JV M/s KRC
Commencement Jun-17 Apr-17
Completion Aug-19 Aug-18
Progress 87% 100%
Layyah – Taunsa Bridge (GOP)
Layyah
Indus
works to be procured later on)
Benefit Deduction of 50 km in distance
River
between Layyah and Taunsa. Time
saving of 1 hour approx.
PSDP No 129
Length 128 km
Scope Rehab. & Improvement of 2-Lane Highway
PC-I Cost 49.95 Billion Global
Total Cost 8.29 Billion
Commencement Aug-16
Completion Aug-18
Expected: Sep-19
Overall 96%
Progress
Qila Saifullah Loralai - Waigum Rud Section (N-70) ADB
PSDP No 129
Rupee Foreign Total
Length 128 km PSDP (2019-20)
Allocation (Million) 150 650 800
Scope Rehabilitation and Improvement of 2 Lane
Highway
PC-I Cost 49.95 Billion Global
Const. Cost 8.29 Billion
Overall Progress 96%
Section / Package Lot-I Qilla Saifullah – Loralai Lot-II Loralai – Waigum Rud
Length 67 km 61 km
Const. Cost 5.1 Billion 3.19 Billion
Contractor M/s Umer Jan- Xuchang Guangli Highway M/s Maqbool –Zarghoon Enterprises JV
Engr. Const. Com JV
Commencement Aug-16
Completion Aug-18
Expected: Sep-19
Km 32+451
Fort Monroe
Rakhi Gajj – Bewata Section (N-70) (JICA)
Rupee Foreign Total
PSDP (2018-19)
Allocation (Million) 200 800 1,000
PSDP No 136
Length 32.4 km
Scope Widening and Strengthening of 2-Lane Highway including Pre-fabricated Steel Bridges, Pre-fabricated Steel
Widening and Mechanically Stabilized Walls
PC-I Cost 22.99 Billion including JICA Grant Rs.13.5 Billion
Pkg-1 (A) (18.079 Billion) 11.6 km JICA funded (Specialized bridges) / (GoP Component Rs.4.910 Billion, JICA Component 13.196 Billion)
Pkg-1 (B) 7.6 km GoP funded (JICA Funding offered. Scope and cost being finalized)
Pkg-2 13.2 km GoP funded (Not initiated yet)
Contractor M/s Taisei Corporation Ltd (Japan)
Pkg-1(A) Commencement Jul-16
Completion Oct-19
Progress 92%
Rakhi Gajj – Bewata Section (N-70) (JICA)
Present After Construction
Rakhi Gajj – Bewata Section (N-70) (JICA)
Kohat – Jand – Pindigheb (GOP)
PSDP No 115 Peshawar N-55
Length 73 km
Dualization &
Scope Improvement
PC-I Cost 18.7 Billion Khushal Garh Kohat
Const. Cost 10.89 Billion PKG-II (38 Km)
Commencement Apr-18
Kohat
Completion Jul-20
Overall Progress 9%
Khushal Garh
N-80
Jand
– ent
P EC lignm
C A
stern
We
Pindigheb – Khushal
N-55 Garh PKG-I (34.5 km)
Sarai
Ghambila Pindigheb
Rupee Foreig
PSDP (2019-20)
Allocation (Million) Kohat – Jand – Pindigheb (GOP)
n
PSDP No 115
Length 73 km
Scope Dualization and Improvement
PC-I Cost 18.7 Billion
Cost 1.62 Billion (incl. in PC-I)
(Land & Utilities)
Const. Cost 10.89 Billion
Const. Cost
PKG Length Contractor Commencement Completion Status
(Billion)
15%
MAP
I 34.5km 5.08 M/s NCC-ANHUI (ACEG) JV Apr-18 Apr-20
Bannu
Package-I
Sarai Ghambila – Karak
(61 km)
Sarai Ghambila
F
Kohat – Sarai Gambila Section (N-55) (GOP)
o
r
Rupee e Total
PSDP (2019-20)
Allocation i
PSDP No 116 g
Length 128 km n
Scope Dualization
4,000and Improvement
0
PC-I Cost 30.13 Billion
Cost 0.7 Billion (incl. in PC-I)
(Land & Utilities)
Const. Cost 22.45 Billion
Const. Cost
PKG Length Contractor Commencement Completion Status
(Billion)
I 61.0 km 10.50 M/s ACEG-MATRACON -JV May-18 May-20 4%
II 66.5 km 11.95 4%
Kallur Kot Bridge (GOP)
Chashma Barrage
Domail
Package
Package II
Already
Already Dualized
Dualized Domail
Domail –– Khurram
Khurram
(38
(38 Kms)
Kms) (40
(40 km)
km)
Package
Package III
III
Gandi
Gandi Chowk
Chowk –– Sarai
Sarai Naurang
Naurang
(8 kms)
(8 kms)
Rupee Foreign Total
PSDP (2019-20)
Allocation (Million)
1,500 Old Bannu Road (N-55) (GOP)
PSDP No 114
Length 83 km
Scope Dualization and Improvement
PC-I Cost 17.23 Billion
Cost 0.9 Billion (incl. in PC-I)
(Land & Utilities)
Const. Cost 13.85 Billion
Feb-20
M/s NCC-IKAN-
III 8 km 0.72 Jun-19 45%
HRPL (JV)
Zhob - Mughal Kot Section (N-50) ADB
Rupee Foreign Total DI Khan
PSDP (2019-20)
Allocation (Million) 150 650 800
PSDP No 129
Length 81.2 km
Scope Rehab. & Improvement of 2-
Lane Highway
PC-I Cost 49.95 Billion Global
Const. Cost 10.06 Billion
Lot-II Killi Khudae
Commencement Aug-16 Nazar –Mughalkot
Completion Aug-18, 32.2 km
Expected: Oct-19
Overall Progress 96%
Section / Package Lot-I Zhob – Killi Khudae Nazar Lot-II Killi Khudae Nazar –Mughalkot
Length 49 km 32.2 km
Construction Cost 5.45 Billion 4.61 Billion
Contractor M/s ZKB-Limak JV M/s Maqbool -Zarghoon Enterprises JV
Commencement Aug-16
Completion Aug-18
Expected: Oct-19
Length 198 km
Scope Construction of
2-Lane Highway
PC-I Cost 13.76 Billion
Cost (Land & Utilities) 200 Million (incl. in PC-
I)
Const. Cost 10.79
Commencement Jun-16
Completion Jan-20
Overall Progress 32%
Yakmach – Kharan Road (GOP)
Length 198 km Rupee Foreign Total
Scope Construction of PSDP (2019-20)
Allocation (Million) 1,000 0 1,000
2-Lane Highway
PC-I Cost 13.76 Billion
Const. Cost 10.79
Commencement Jun-16
Completion Jan-20
Overall Progress 32%
Const. Cost
Packages Length Contractor Commencement Completion Progress
(Billion)
I 50 km 3.13 M/s SMADB –RMS (JV) Jun-16 Dec-19 74%
II 50 km 2.42 M/S MHB-NIC (JV) Jul-17 Jan-20 30%
III 50 km 2.46 M/s SACHAL Engineering Jan-18 Jan-20 11%
IV 48 km 2.78 Jan-18 Jan-20 13%
Petaro – Sehwan Section N-55 (130 km)
Rupee Foreign Total
N-5
N-5 PSDP (2019-20)
Allocation (Million) 2,400 100 2,500
N-55
N-55 Section – I (GoS Funded)
Length 64 km
Scope Dualization
PC-I Cost 21.04 Billion (Global)
Commencement Jun-18
Sehwan
Completion Nov-19 (PKG-1A,1B)
N-305
N-305 Aug-20 (PKG -1C)
PKG Length Cost (B) Contractor Status
1A 20 km 1.76 M/s AM Const-
72%
Mishal Sania JV
66 km 1B 20 km 2.12 M/s Hasas-
Sarwar JV 73%
N-25
N-25 Manjhand 1C 24 km 1.79 M/s AMC-SGEC LOA Issued
JV
Section – II (ADB Funded)
Length 66 km
PC-I Cost 21.04 Billion (Global)
Scope Dualization 64 km
Est. Const. Cost 8.98 Billion
Bid Cost 7.16 Billion Petaro
Commencement Jan-19 N-120
N-120
Jamshoro
Completion Jan-21
Status 1% Hyderabad
M9
National Highway Council
Powers and functions of the Council:
PRESIDENT
1) The functions of the Council shall be:
• Minister for Communications
a. To approve five year plans and perspective plans,
MEMBERS prepared by the Board, in consultation with the P&D
Division, for the construction, development, repair
• Secretary Finance and maintenance of National Highways and strategic
roads specially entrusted to the Authority by the
• Secretary P&D Federal Government or by a Provincial Government
or other authority concerned;
• Secretary Communications
b. To lay down national policies and guidelines to be
• Two Professionals (Nominated by the followed by the Authority in the performance of its
President NHC) functions;
• Highway Construction & Management c. To review and reappraise projects;
• Finance & Accounts d. To approve the annual budget of the Authority;
2) The Council shall have power to control, direct and
SECRETARY regulate the affairs of the Authority.
• Chairman NHA
NHA Executive Board
Functions of Board:
CHAIRMAN
a. To consider and approve proposals, schemes
• Chairman, NHA and projects exceeding fifty million rupees but
not exceeding one hundred million rupees;
MEMBERS
b. To consider and recommend, through the
• Inspector General, NH&M Police Ministry, to CDWP or ECNEC proposals,
• Additional Secretary, Finance Division schemes and projects exceeding one hundred
million rupees;
• Member or Additional Secretary, P&D Division
c. To consider progress reports of the Authority;
• Joint Secretary, Ministry of Communications d. To perform such other functions as may be
• Chief, NTRC delegated to it by the Council;
• Vice President, NESPAK e. To recommend for approval the annual budget
of the Authority and
• Member (Finance), NHA
f. To approve projects to be funded through toll
• Member (Planning), NHA and other receipts from operation of highway.
Road Network Condition
80.00%
2014-15
Percentage (%)
69.8% 69.6%
2014-15 2015-16 2017 70.00%
2015-16
2017
60.00%
No. of No. of No. of
%age %age %age
Km. Km. Km. 49.91% 50.09%
50.00%
40.00%
Good to Fair 4,683 49.91% 7,195 69.76% 7,442 69.64%
30.2%30.4%
30.00%
0.00%
Good to Fair Poor to Very Poor
Maintenance Allocation under Annual Maintenance Plans Rs In Billion
Maintenance Activity 2015-16 2016-17 2017-18
Routine Maintenance 3.99 4.73 5.18
Periodic Maintenance 10.46 10.67 12.88
Rehabilitation 2.49 1.33 2.34
Highway Safety 1.27 0.95 1
Emergency Maintenance 0.3 0.5 0.5
Special Maintenance 1 1.5 1.5
Bridge/Culvert 0.5 0.6 0.6
Others 2.74 3.46 3.24
TOTAL 22.77 23.76 27.26
Human Resource
Sanctioned Strength 4,977
Ofcers Ofcials
Cadre Total
(BS-17 & Above) (Upto BS-16)
CSS / Ex-Cadre 25 07 32
3 Karachi – Hyderabad 136 44,251 280 Conversion of existing 4- Substantially complete 98%
Motorway (M-9) lane Highway into 6-lane Operational since June
Motorway 2018
4 Habibabad Bridge (N-5) 2 831 5.2 Construction of new 4- Operational since April
lane Railway Overhead 2015
Bridge on N-5