Training Programme
Dr. K. Ishikawa
Dr. Deming
Dr. Juran
Dr. walter Andrew Shewhart
1.Birth-1891, Place-New canton, USA
4.He was the first to have given Quality and Quality Control
He had the unique honour of developing Sampling Techniques that was the used for
The popular Deming prize established in 1951 in the honor of Dr. Deming was
originally designated to Japanese
Companies for major contribution in quality improvement under the guidance of JUSE
William Edward Deming
DEMING’S Contribution :-
1.Theory of optimization ,
2. Theory of variation,
3. Theory of Knowledge
4. Theory of Psychology
Dr. Deming was popularized the PDCA Cycle originated by the Dr.
Shewhart
Joseph Moses Juran ( J.M.Juran)
2.Dr. Juran is known as the foremost teachers and Consultants in the world
3.Dr. Juran is man of millennium, he spanned more than 80 years in the field of quality
4.In 1954 Dr. Juran altered global competition when he accepted the invitation of the JUSE
5.And KAI-DAN-REN to prepare and deliver a series of lectures for the leaders of Japanese
industries
6.Juran’s congressional testimonies in 1986 helped create “The Malcolm Bridge National
Quality Award
7.Juran Institute was founded in 1979 to create New tools , New techniques and New
principles to serve the emerging need of society
8.We all benefit from Dr. Juran’s accomplishment . He has created New Methods ,Tools and
concepts
Joseph Moses Juran ( J.M.Juran)
The Pareto Principle is used all over the world to help us focus on the “VITAL FEW”
Dr. Juran has given the Step by Step breakthrough process is the basis for the
Quality improvement processes and quality action used through out the world
including the “Six Sigma” approach
3.He was graduate in Applied Chemistry then He was employed by a company engaged in
Coal liquefaction -
4. He was commissioned as a Noval technical officer - On the request of JUSE
6.He has given the most popular tool “Cause and Effect Diagram,
mao sauQaar krko pura ikyaa .jaapana mao ]sa samaya dao sasqaayao jausao tqaa ko[
Dona rona jaao jaapana ko caIf ei@yaiTva ko esaaoisayaosana qaa nao imalakr
Da@Tr Doimaga ko
lao@car kI vyavasqaa ikyaa .[sa lao@car kao saunanao ko ilae @vaailaTI knT/aola
irsa-ca ga/up banaayaa AaOr t%kalaIna maojar janarla maOk Aaqar kao Da@Tr
Doimaga
kao baulaanao kha tba 1950 mao Da@Tr Doimaga jaapana Aae AaOr ]nhaonao
sToTIsaiTkla @vaailaTI knT,aola ko ]pr Apnaa BaaPaNa idyaa . sana 1954 mao
Da@Tr jaurana
Beginning of Quality Circle In India
sabasao phlao @vaailaTI saik-la baI eca [- ela hOdrabaad mao 1981 mao Aayaa . jao ko
jauT imala ko t%kalaIna p/osaIDonT Da@Tr Aar saI Aga/vaala nao jaba
[sako baaro mao saunaa tao ]nhaonao jausao sao baat kI tao jausao nao ]nakao baI eca
[- ela hOdrabaad sao samp-k krnao kao kha tba baI eca [- ela hOdrabaad sao dao
baar kanapur mao Apnao @vaailaTI saik-la TIma ko saaqa Aae . [sako baad jao ko jauT
imala nao @yau saI kao caalaU ikyaa AaOr 1982 @vaailaTI saik-la faorma Aaf
and improve the products, services , jobs and so on . These small group
operate autonomously
Utilize the quality control tools and techniques and others improvement
tools and promotes self & Mutual development .
Actualization , make the work place more pleasant ,vital and satisfying
improve customers Satisfaction and contribute to society
Quality Circle Concept
Definition
1. Quality Circle is small group activities
2. It is a team building philosophy.
3. It is for self and mutual development of members
4. It operate autonomously i.e. empowering gross root
level people to take work related decision
5. It is a knowledge and experience sharing platform
6. Its promote creativity and remove mind blocks
7. It is a learning platform especially statistical quality control
8. It contributes to customer satisfaction and thereby
organization and finally society
Quality Circle Concept
Definition
9. It is not an isolated concept but complementary and
supplementary to other quality concept
•Suggestion Scheme
•Individual Problems
•Money Gains
•Organization Only
STRUCTURE FOR QUALITY CIRCLE
AND ROLE OF ITS CONSITITUENTS
Structure for Quality Circle
TM
Corporate Coordinator
St.Comtt.
Facilitator &
Dy.Facilitator
Unit Level Coordinator
Leader /Dy. Leader
Members
Potential Members
ROLE OF TOP MANAGEMENT
Top management is a monitoring group Headed by the head of the organization.
To review and improve the functioning of Quality Circles through periodic and
regular meeting .
1.Listening (Caring)
It is to understand peoples problems in work and removing the hurdles and irritants
2. Teaching
While teaching his people ,it is not only transmitting knowledge and values, but also
reinforcing
3.Facilitating
Mere teaching and leaving people to fend for themselves will not help to bring result
Management people should be enablers.
COORDINATOR
As the name implies ,coordinator carries out coordination work , He is link with
Top management, Steering committee , Facilitators/ Dy. Facilitators , Leader/ Dy.leaders
Circle members and potential members.
ROLE OF COORDINATOR
1.Liais with facilitators for ensuring regularity of circle meeting and presentation
6.Organize management presentations and case stud presentation of QCs out side the
company and also to the Steering committee.
Quality of Leader
A QC leader should have broad knowledge and skills
1. Technical knowledge
2. Quality Control techniques
3. Improvement techniques
4. Human relation techniques
5. Social relation techniques
6. Leader should be a highly disciplined person
7. Ready to take responsibilities & delegates responsibility
8. Coordinates and lead by examples
9. Tolerant and enthusiastic
10. He should be accommodative
11. Friendly and a symbol of cognitive focus for group unity
Role of Leader
1. Leader should conduct meeting regularly
2. He is expected to be task oriented and the same time play a socio- emotional part
8. He does not take credit for him self but gives credit to his members when the
group wins
CONDUCTING EFFECTIVE MEETING
1)Before the meeting;
a) Plan who should attend ?
Apart from QC leader, Members and facilitator , potential members or senior
colleague or an expert to invited.
b) What is the purpose of discussion ?
Define the objective and purpose of discussion
Where and when the meeting is going to be
2) During the meeting
a) Start on time and end on time
b) Stick to agenda
c) Reach consensus on agenda
d) Ensure participation of all and encourage it
e) Assign role
f) Encourage listening and thinking
3)At the end of meeting
• Summaries discussion and end with the positive note
• Draw out an action plan
• Assign responsibilities to achieve goal / plan
4) After the meeting
a) QCs can record “ Minutes and action plan’ in a register and communicate
b) Evaluate meeting result
The characteristics of effective team work are
1. Clear objective and agreed goal
6. Leadership
8. Development of QC members
Faciltator/Dy.Facilitator HOD
PROBLEM SOLVING TECHNIQUES
• 1 MILE STONE/GANTT CHART
• 2 BRAIN STORMING
• 3 FLOW DIAGRAM
• 4 PRIORTY NUMBER
• 5 P-D-C-A
ELEMENTARY PROBLEM SOLVING TOOLS
• 1 CHECKSHEET(DATA COLLECTION)
• 2 STRATIFICATION
• 3 PARETO DIAGRAM
• 5 SCATTER DIAGRAM
• 6 HISTOGRAM
• 2 MULTIVARIATE ANALYSIS
ACT PLAN
kaya-vaahI yaaojanaa
Check Do
jaaca kaya-
PDCA cycle or Deming’s Wheel
Dr. K. Ishikawa made these four steps into six steps
When these six steps have been followed , a seventh step is needed to
ensure whether the corrective action has been worked out or not .
Decide on
ACT the objective PLAN
And
targets Decide
Take action Methods of
Achieving the
objective
Carryout education
and training
Check the
Check result
Do the
work DO
FLOW DIAGRAM
Flow Diagram is a graphical or a pictorial way to depict a process. With the help of a
flow diagram we can show process sequence . It can be used to dissect a process for
Better understanding and analyzing. It can also be used for replanning or making a
Change. The process may manufacturing process of a product , a service provided, to
Convey some information or a combination of any of them.
Quotation Material
obtained received
Material Material
ordered made
MATRIX FLOW DIAGRAM
Material
inspected
User
obtained
DETAILED FLOW DIGRAM
Raise Indent Mtrl. Made
Start
Indent received Mtrl. Received
Mtrl needed
N Inspection
Mtrl Is it OK ? Return for
database correction Return to
Supplier
Y Is it OK?
N
N Send Enqrs
Y
Y N
Qtn. OK ? Take as Stock
Send reqsn
Y
Mtrl. Obtained
Place order Put in
database
End
MATRIX FLOW DIAGRAM
Reach to Venueto
Is Y Participate in knowledge
Knowledge
test ? Test at right time
N
Stop
Reach to right Hall for
Case Study Presentation
Participate in other
Present the Case Study competitions
Do you want N
knowledge
test ? Y
Milestone Chart-Quality Circle Activity Planning
Quality Circle Name Department Facilitator Members’ Name
Project Reason for selection
5 Data Analysis
6 Developing solution
9 Regular Implementation
10 Follow up/Review
Brainstorming
Definition:
Brainstorming is a group technique for generating new and useful ideas. It uses a few simple rules
for discussion on a subject matter that contributes to Originality and innovation.
2.Flexbility : Ability of mind to move from one aspect to another quickly. When we listen to others ,it
opens up new avenues for our thinking .We call this Hitch – Hiking process. Thinking power of an
individual either lies in his memory ,perception about a situation , creativity or imagination. Flexibility is
measured by the number of categories of ideas generated.
3.Originality: Ability of mind one can think of innovative or new ideas. This is ability to identify
uncommon ones .Originality does not come in large numbers. But even one original idea can lead to a
lot of benefits. Thinking without any barrier and away from conventional method lead to originality.
4.Awareness : Ability of mind to look ahead into future i.e. beyond the immediate facts.
5.Drive : Willingness to participate and contribute without any hesitation and to achieve the end goal
without the fear of failure. Getting into the habit of brainstorming helps people to shed their fear
,inhabitations and make them to participate willingly .Such willingness and drive in people make them
to try unconventional way . Dr. Juran calls it as “ Cutting new windows”
Brainstorming
Some difficulties and pit falls connected with Brainstorming
First and foremost we should remember that brainstorming is not a replacement to data.
In a brainstorming some people may very close to the problem and some may not .Some
Times when an idea comes from an outsiders ,the insiders of the group may not give
importance to it. Some people are difficult to deal within a group , they get off the track
Which disrupts the group works.
Use of Brainstorming :
Brainstorming can be used at various stages of problem solving. It can be used for .
1.Identification of problems
2.Finding out possible causes to a problem.
3.Generating ideas for arriving at a solution
4.Predicting the possible resistance to the solution.
5.Finding out the process to overcome the resistance .
Four conceptual rules are:
1. No criticism or evaluation
2.Try not to be conventional
3.Aim for quantity
4.Hitch- Hike on other’s ideas
Four practical rules for structural approach:1.Contribute in turn
2.One Idea per turn 3.You may pass if no idea could be given in one round 4.Do not explain Ideas
Data Collection
Def: Data collection is nothing but collection of the required information in the form of
Figures for statistical analysis of a problem. This provides a sound basis for decision
Making and corrective action.
Purpose of Data Collection :Data are collected for a variety of purposes .In industry
,the following are more common.
Quality Evaluation Raw Materials, intermediate products and finished products.
Process Control : To assure that products turned out meet the specified requirements of
customers/ design
Improvement Trials: To improve product quality , to reduce costs and to increase
Productivity.
Problem Solving : For information throughout the problem solving process by Quality Circles
Compare Performance :From time to time measure improvement in production ,profit. quality
and competitiveness etc.
S PARAMETER
N Actual Observation
Spec 1 2 3 4 5
4 LESS GLOSSY IIII IIII IIII IIII IIII IIII IIII IIII IIII 40
5 PAINT PEEL IIII IIII IIII IIII IIII IIII IIII 34
:
:
:
12 OTHERS IIII IIII 9
d) Defective location checks: This kind of check sheet is meant to be placed in the
drawing or sketch of the product so that location of defects can be identified and investigated.
Such type of check sheets are helpful in controlling defects in casting, glassware plastic
components etc.
e) Defective cause checks: This type of check sheet is used to generate information on
causes and their correspondence to the observed defects.
Data may have to be later analyzed by stratification or scatter diagram to get the clues. This is a
rough analysis for cause and effect relationship
M/C Oper Monday Tuesday Wednesday Thursday Friday Saturday
ator
00 0xx x# # xxx 000 +++ 00x xx0 xxx 00x 00x 00x xxx 00x 00x # 00x
A 1 xx
+
+0 #00
0
000
#
### +
##
xx 0##
#
000
#
xx#
#
xx xx# 000
#
xx x+ #00
0
xx
++
# ## # 00x +++ 00x 00x xxx 00x # 00x 00x xxx +++ 00x # 00x xxx
2 #0
00
00 #0
00
xx# +
##
xx
#
xx#
#
000
#
xx#
#
#00
0
xx
#
xx#
#
000
#
+
##
xx
#
#00
0
x+ 000
#
00 ++ xxx 00x 00x 00x 00x 00x 00x 00x 00x 00x 00x 00x 00x 00x 00x 00x
3 xxx
#
xx0 00
0#
x+ xx xx# x+ xx#
#
x+ xx xx# x+ xx#
#
xx x+ xx# x+ xx#
#
00 x0 00 00x 00x 00x 00x # 00x 00x +++ 00x 00x 00x 00x +++ 00x 00x
B 1 xxx
#
+x
#
xx
+
xx
#
x+ xx xx
#
#00
0
xx#
#
xx
#
+
##
xx#
#
x+ xx xx
#
+
##
xx# xx
00 00 # 00x +++ 00x xxx 00x 00x 00x 00x 00x 00x 00x 00x 00x #
2 xxx xx
+
#0
00
xx# +
##
xx#
#
000
#
xx# x+ x+ xx#
#
xx x+ xx# xx x+ #00
0
00 00 ++ 00x 00x 00x # 00x +++ 00x xxx 00x # +++ 00x xxx 00x +++
3 xx
+
xxx
##
++
##
xx
#
x+ xx #00
0
xx
#
+
##
xx 000
#
xxx #00
0
+
##
xx
#
000
#
xx +
##
Component Check points Sun Mon Tue Wed Thu Fri Sat
•Use data sheet ,check sheet and check list as per the requirement
•Analyze the collected data for its credibility and relevance ( for whom, when, who
a) For explanation to others : We can explain the phenomena in the work shop and make people
understand better .It can be used to explain defect ratio, productivity, increase in turnover etc.
d) For process control : Plotting the data in the order of day or time will often reveal trends or
abnormality, when corrective action has to be taken . Even for production planning and control,
graphs are handy.
e) For Data Analysis : Graphs show what figures mean and clarify the facts that may be over
looked otherwise , if the data are seen as just figure.
How many types of graphs ?
There are eleven types of graphs, they can be divided into two main
groups,
1. Commonly used Graphs
2. Special purpose Graphs
Commonly used Graphs are ;
a) Line Graph
b) Bar Chart / Graph
c) Pie Chart or Circle Graph
d) Pictorial Graph
Special purpose Graphs
a) Belt Graph
b) Radar Graph
c) Compound Graphs
d) Strata Graph
e) Float Graph
f) Zee Graph
g) Pyramid Graph
Line Graph
How are line graph made ?
In these graphs , the abscissa ( X axis) shows Time and the ordinate (Y axis)
shows quantity.
Such graphs are commonly used for watching production , sales, inventory ,
30 31
29
28
25 26
23
22
MT
20 20
15 15
14
13
12
10 10
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Off Spec Linear (Off Spec)
Line Graph
CB Off spec Trend from 01 Mar, to 08 Mar.2012
1.5
1.4
1.3
1.2
Quantity in MT
1.1
1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
1 2 3 4 5 6 7 8
Month
This is used for observing off spec quantity changing over time or trend
BAR Graph
Bar graph is used for comparison . It can be vertical . Or it can be horizontal
70
75 60
60 50
40
45
30
15
0
1 2 3DATE 4 5 6 7 8 9 10
4rth qtr South
North
3rd qtr
West
2nd qtr
East
1st qtr
0 20 40 60
Pie Graph or Circle Graph
This is used for showing relative proportion of various components..To convey approximate
relative values
5%
5%
OBC
9% Muslim
48% Upper caste
14% S.Caste
Sikh
19% Others
BELT GRAPH
It is like Pie Graph but using bars and is suitable for showing comparative levels.
It can be made on percentage basis as well as on quantitative basis. It can be made as
Vertical bars or can be made as horizontal bars.
How to make it ?
Collect the data and make the graph like Bar graph , procedure is something similar to
making a bar graph . Only difference is each bar represents multiple information.
Production Grade w ise and m onth w ise Prodn. of CB Gr.Wise & Month w ise
2500 100%
90%
2000 80%
May
70% May
% production
Quantity
C.Ch
78 Stra.
84
76
S.D.
FLOAT GRAPH
This is an ideal graph for comparison of two distinct aspects.
This helps to find out the total problem in relation to the entire aspect.
It shows the whole process at one glance , and this is a simple graph to
draw . 88%
68% 78%
25% 34% 30%
Poor
Mature wise Pro Hindu
Pro muslim Strong
No No No No Rich
Weak
12%
32% 22%
75% 66% 70%
STRATA/ AREA GRAPH
This is used to show the trend in the total and components of the total
22
20
18
7
16
14
12 Preventive %
10
6 3 Appraisal %
2 1
Failure %
8
3
6 1 3 4 1
2
4
8 2
6 5
2 4 4 3
0
2008 2009 2010 2011 2012 2013
ZEE Graph
1250 1220 1240 1208 1198 1240 1224 1138 1248
1200 1215 1199
1150 1235 1208
1232
1100
1050
1030
1000
950
928
900
850
824
800
750
700 716
650
600 616
550
521
500
450
400 417
350
300 315
250
200 210
150
100 100 110 105 102 104 95 100 108 104 102 108 110
50
0
J F M A M J J A S O N D
MALE FEMALE
HP
PUNJAB
ORRISA
RAJASTHAN
TAMIL NADU
WEST BENGAL
U.P.
50
40
30
20
10
0 Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
absenteeism
45
40
35
30
25
20
15
10
5
0
A B C
Dec Jan
50
40
30
20
10
0
A B C
May Jun
80
70
60
50
40
30
20
10
0
Colony City
CAUSE AND EFFECT DIAGRAM
Any defect in a component, product or service could be one or more
causes to find out the relationship between the cause and effect , a
diagram drawn systematically by Mapping out all the probable
causes influencing the effect . This diagram is called Cause and Effect
diagram.
Defeat in
Bating
Selection Balling Fielding Cricket
Match
HABIT TRAFFIC WEATHER
LATE
COMING
IN DAY
Problem
Method Material
FINDING OUT THE ROOT CAUSES
VALIDATION OF CAUSES
1 A 76 16 Valid
2 B 76 25 Valid
3 C 76 20 Valid
4 D 76 1 Valid
5 E 76 5 Valid
6 F 76 0 Not Valid
7 G 76 7 Valid
8 H 76 2 Valid
9 I 76 0 Not valid
PARETO DIAGRAM
Pareto Diagram is a technique of arranging data according to priority importance and
using it into a problem solving frame work . This helps to find out the “VITAL FEW”
from the “USEFUL MANY” for problem selection .
Pareto Diagram is compound graph . To draw the diagram , collect data and arrange it
In descending order. If “others” is there which consist of several small defects but not
more than the specified defects ,then others will be always come at the end as this
will be cumulative of more than one of defect. Some times specific defect may be
equal or less than others, even others will be at the end.
Data of 500 defective Biscuit packets out of 1000 packets inspected on 10.05 2015
350 70
Nos. Defect
250 50
200 40
150
32.2
Useful Many 30
100 20
50 10
0 0
E B D C F A O
CAUSES
DATA OF THE ROOT CAUSES
SN Symbol Causes No. of observation Findings
1 A Cause-1 76 16
2 B Cause-2 76 25
3 C Cause-3 76 20
4 D Cause-4 76 1
5 E Cause-5 76 5
7 F Cause-6 76 7
8 G Cause-7 76 2
Arranging in descending order
SN Symbol Causes No. of observation Findings
1 B Cause-2 76 25
2 C Cause-3 76 20
3 A Cause-1 76 16
4 F Cause-5 76 7
5 E Cause-6 76 5
7 G Cause-5 76 2
8 D Cause-4 76 1
PARETO CHART
32 Useful Many 40
28 32.89
24 30
20
16 20
12
8 10
4
0 0
B C A G E H D
Causes
SCATTER DIAGRAM
Definition :-
Scatter diagram is a graphical representation of relationship
between two variables .
10 20 30 40 50 60 70 80
LEVEL OF OIL
10 20 30 40 50 60 70 80 90
10 20 30 40 50 60 70 80 90
ANGLE BEFORE LAPPING
10 20 30 40 50 60 70 80 90
ANGLE BEFORE LAPPING
10 20 30 40 50 60 70 80 90
ANGLE BEFORE LAPPING
10 20 30 40 50 60 70 80 90
ANGLE BEFORE LAPPING
10 20 30 40 50 60 70 80 90
ANGLE BEFORE LAPPING
r = 483
639.15
r = 0.7557
Step 5
2
Find out 100 r.
2
100r = 57.1
Step 5
Therefore correlation between these
two variables is useful.
2
r = 0.5710
2
100 r =57.10
Calculation of coefficient of correlation and
contribution of X to Y
Step 1
Obtain pairs of observation for the two variables .
Data on height Vs Weight study for newly born children
Observation Height Weight
(No.) of child of child
(inches) (Kg)
2 25 8
3 30 7
4 35 11
5 40 9
X Y
20 5 100 400 25
25 8 200 625 64
30 7 210 900 49
40 9 360 1600 81
Step 3
Note down the values of N observation, Y2 and XY for the observation value calculation
Step 4
∑XY - ∑x. ∑Y
n
r=
√{∑X2- (∑X )2}{∑Y2- (∑Y )2 }
n n
Calculation of coefficient of correlation and contribution of X to Y
Step 5
1255 - (150).(40)
5
r=
√{4750- (150 ) }{340- (40 ) }
2 2
5 5
Find out the value of r, if the value of r is more than 0.7 then the correlation is useful
55
r=
250X20
55
r= = 0.78
70.71
Step 6
To calculate contribution of X to Y find out 100 r2 .
% Contribution of X y = 100r2
= 100x0.78x0.78
= 61%
35 30 26 32 31 28 30 34
31 29 30 33 34 31 27 33
32 31 25 30 32 29 30 29
28 33 30 28 31 37 30 32
30 35 31 32 33 30 28 31
29 31 29 30 24 30 31 28
31 34 31 33 31 33 30 33
29 32 30 26 30 28 31 27
X max = 37 highest Value
35 30 26 32 31 28 30 34 Xmin = 24 lowest value
31 29 30 33 34 31 27 33 Range R= 37-24 =13
32 31 25 30 32 29 30 29
28 33 30 28 31 37 30 32
30 35 31 32 33 30 28 31
29 31 29 30 24 30 31 28
31 34 31 33 31 33 30 33
29 32 30 26 30 28 31 27
35 34 32 37 35 31 34 32
26 27 25 28 28 24 30 26
Table for recommenced number of class intervals
Up to 50 6
51 – 100 7
101- 200 8
201 – 500 9
501 – 1000 10
23.5 – 25.5 II 2
25.5 – 27.5 IIII 4
27.5 – 29.5 IIII IIII II 12
30
25
20
Frequency
15
10
0
23.5 25.5 27.5 29.5 31.5 33.5 35.5 37.5
Class interval
Some of the
Shapes of
Histogram
Double Peaked
This pattern arises from a mixture of two
conditions , two suppliers of same parts, two
machines, two operators. Separate histogram
for each condition has to be made.
Comb Type
Frequency
20
16
12
8
4
0
1.54 1.67 1.80 1.93 2.06 2.19 2.32 2.45 2.58 2.71
Power Consumption
Uses of Histogram:
Lower Upper
spec. spec.
28 Limit Limit
24
Frequency
20
16
12
8
4
0
1.54 1.67 1.80 1.93 2.06 2.19 2.32 2.45 2.58 2.71
Power Consumption
45
10-15
40
15-20
35
No of crimes
20-25
30
25-30
25
30-35
20
35-40
15
40-45
10
45-50
5
50-55
0
AGE OF CRIMINAL
To assess process
capability
Uses of Histogram:
We may have to adjust the process to
reduce weight.. The weight of the
soap is continuously on the higher
side
80
70 144
146
Weight of soap
60
148
50 150
40 152
154
30
156
20 158
10 160
Central line
LCL
We know that variation is always present due to inherent variation in the input for a given
out put .Such variation can be due to a variety of causes .They can be broadly classified
Into two categories .
1.Chance Causes
2.Assignable Causes
Based on the requirement and conditions prevalent , we accept certain variations as
inevitable .Depending upon the working conditions such inherent variations are accepted
as due to CHANCE CAUSES.. We know ,however sophisticated the systems, production
condition etc. chance causes are bound to be there.
ASSIGNABLE causes are not present under normal working conditions. They suddenly
creep in due to various reasons causing changes in the control parameters .
Statistical Control Process : When no Assignable causes of variation are present in a
process and it operates only under a constant system of chance causes , process is said
to be in a state of Statistical Control .
Occasionally ,assignable causes may enter the process resulting in a change to out of
control state when process out put shows large variation and hence fails to meet required
quality products.
A major objective of statistical quality control is to quickly detect process shifts due to
assignable causes so that corrective action can be taken to prevent nonconforming
Products being turned out. This facilitated by a CONTROL Chart.
X-R Control Chart
25
Assignable Cause 25
UCL 22.5 22.5
UCL 20 20
17.5 17.5
Values
CL 15 15
Central Line 12.5 12.5
LCL 10 10
7.5 Assignable 7.5
5 5
LCL
1 2 3 4 5 6 7 8 9
Data Time
Control Chart
How to set control Limits ?
Control limits are the permissible limits under chance causes variation or under state of
statistical control .For a measurable quality characteristic , chance causes variation will result
in a pattern of variation called normal distribution which is a symmetrical frequency
distribution. This distribution is described completely by the mean and standard deviation
.One feature of this distribution is that with a span of + _ 3standard deviation (+_3 sigma)
from the mean form the limits for variation due to chance causes .
TYPES OF CONTROL CHARTS :
Control charts classified into two categories .
a) Variables Control Chart
b) Attributes Control Charts
Variables Control Chart : If the quality characteristic can be measured with the help of an
instrument or measuring process , it is called a measurable characteristic .For example,
diameter, electrical resistance, iodine no., yield, carbon content and tensile strength etc.
In such cases , it is convenient to describe the quality characteristic by average and measure
of variability by rang or standrd deviation.
There are three types of variable control charts.
1.Average and Range Chart ( X-R Chart)
2.Individual and Range Chart( X- R Chart)
3.Meadian and Range Chart
VARIABLE CONTROL CHART
(X-R Average and Range)
Operator- Packing M/c no.03 Meas. Instrument- W.Bridge Unit of Measure- kg R= 4.44
sub
Group Time 7 8 9 10 11 12 13 14 15
SUM 4511 4506 4513 4504 4513 4506 4504 4512 4504
Average 902.2 901.2 902.6 900.8 902.6 901.2 900.8 902.4 900.8
Range 5 5 6 5 5 3 2 5 4
Factors for Control Limit
Size of sub
group (n)
A2 D3 D4 d2* 3/d2
2 1.880 0 3.267 1.128 2.659
3 1.023 0 2.575 1.693 1.772
4 0.729 0 2.282 2.059 1.457
5 0.577 0 2.115 2.326 1.290
6 0.483 0 2.004 2.534 1.184
Control Limits for X as
Control Chart
UCL = X+A2R =901.62+(0.577x4.44)= 904.18
CL = X = 901.62
904.8
904.4
904 UCL
903.6
903.2
902.8
902.4 902.6 902.6 902.4
902 902.2
901.6 CL
901.2 901.2 901.2
900.8 900.8 900.8 900.8
900.4
900
899.6
899.2 LCL
898.8
898.4
898
1 2 3 4 5 6 7 8 9
Control Limits for R as
UCLR =D4 R =2.115x4.44=9.4
UCLR =D3 R =0x4.44=0.00
CLR = R =4.44
10
9.5 UCLR
9
8.5
8
7.5
7
6.5
6
5.5
6
5
4.5 CLR
5 5 5 5 5
4 4
3.5
3
2.5
3
2 2
1.5
1
0.5
0 LCLR
1 2 3 4 5 6 7 8 9
2. INDIVIDUAL and RANGE CHART(X-R)
This is applicable when subgroup is not practicable and control is to be exercised based
On single values.
This can also be used on special occasion and where process is under control in normal
Condition. This chart does not detect the changes in the process level quickly.
Here individual value is taken rather than group value.
For Example:
We are interested in controlling the power consumption in home
X =30.4
CL
UCL
LCL
6/2/2009
32.5
6/3/2009
29.5
6/4/2009
6/5/2009 31.5
29.7
6/6/2009
6/7/2009
30.430.4
6/8/2009
29.4
6/9/2009
31.6
31
6/10/2009
34
6/11/2009
6/12/2009
28.6
6/13/2009
29.4
6/14/2009
30.4
6/15/2009
31.7
Individual Range Chart (X-R chart)
6/16/2009
27.7
6/17/2009
28.9
31
6/18/2009
6/19/2009
32.5
6/20/2009
30.6
32
6/21/2009
6/22/2009
26.7
6/23/2009
29.7
6/24/2009
30.631
6/25/2009
29
Range- Chart
6.8
6.4
6 UCL
5.6
5.2 5.4 5.3
4.8
4.4
4 4
3.6
3.2
2.8 3 3 3
2.4
2 2 2.2 2.1 2
CL 1.8 1.9
1.6 1.5
1.2 1.3 1.2 1.4
0.8 1 0.8 1 0.9
0.7 0.6
0.4 0.4
0 0
LCL9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
00 2 00 2 00 2 00 2 00 2 00 2 00 2 00 2 00 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
9 9 9 9
/2 / / / / / / / / / / / / / / / / / / / / / / /
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4
6/ 6/ 6/ 6/ 6/ 6/ 6/ 6/ 6/ 6/1 6/1 6/1 6/1 6/1 6/1 6/1 6/1 6/1 6/1 6/2 6/2 6/2 6/2 6/2
Date 1/6 2/6 3/6 4/6 5/6 6/6 7/6 8/6 9/6 10/6
No. defectives 4 5 8 6 7 12 9 4 3 2 60
Sample No. 11 12 13 14 15 16 17 18 19 20
Date 11/6 12/6 13/6 14/6 15/6 16/6 17/6 18/6 19/6 20/6
No. defectives 1 5 10 4 6 7 4 9 8 6 60
Control limits for “ np” chart : Limits
= nP ±3 nP (1-P)
Total nos. of defectives in sample checked =120 = P
Total nos. inspected =20x50 =1000
P= P/ Total nos. inspected =120/1000 = 0.12
nP =50x0.12 =6.0
UCLnp= 6+3 5.28 =6+6.89 = 12.89
LCLnp = 6-6.89 = -0.89
np control chart : n=50
14 UCL
12 12
10 9
10
9
8 8 8
7 7
6 5
6
5
6 6
4 4 4 4 4
3
2 2
1
0 LCL
6/1/2009
6/2/2009
6/3/2009
6/4/2009
6/5/2009
6/6/2009
6/7/2009
6/8/2009
6/9/2009
6/10/2009
6/11/2009
6/12/2009
6/13/2009
6/14/2009
6/15/2009
6/16/2009
6/17/2009
6/18/2009
6/19/2009
6/20/2009
Interpretation: all point are within control limit i.e. process is under control
b) Percentage Defective “p” Chart
As the name indicates , this chart uses percentage .This is useful when the sample size
Varies. Let us see an example for this.
In a paper bag manufacturing co. bags are checked for defectives. Date wise number of
bags inspected. Data are collected in following check sheet
No. No. No. %of ( n) 3 UCL%= LCL%
inspected (n) defectives defective 3σp
n (P+3σp) (P-3σp)
(p) s x100 x100
(p%)
P =190/1862 =0.102
Control limits for percentage p Chart
= P ± 3 p(1-p)/n
20
UCLp
15
CLp 12.15 12.32
10 10.48 9.78 10.23 10.53
10.23
9.19 8.79
8.16
5 LCLp
0
1 2 3 4 5 6 7 8 9 10
Interpretation : All points are within the upper controll limit and therefore process is under
Control .
C) Number of Defects “C” Chart.
This control chart is used when quality assessment is in terms of number of defects in
single items. The number of defects on the product is noted and “C” chart help to know
whether the defect level is under the control.
For example a carpet manufacturing company wants to monitor defects in carpet. For
this purpose the number of defects per square meter is collected.
Time No. of defects Time No. of defects Total no. of defects = 28 +24 = 52
08:00 4 13:00 1 No. of sample taken =20
08:30 3 13:30 4
C =52/20 =2.60
09:00 2 14:00 3 Control limits = C ± 3σ
09:30 0 14:30 2 =C±3 C
10:00 1 15:00 0 UCLc = 2.6+3 2.6 =7.44
10:30 5 15:30 0
11:00 6 16:00 3 LCLc =2.6- 3 2.6 = -2.24
11:30 4 16:30 2 Take this as zero
12:00 0 17:00 5 CLc = 2.6
12:30 3 17:30 4
Total 28 24
Number of Defects “ C” Chart
8
UCL
7
6 6
5 5 5
4 4 4 4 4
3 3 3 3 3
CL
2 2 2 2
1 1 1
0 LCL 0 0 0 0
8:00
8:30
9:00
9:30
10:00
10:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
16:00
16:30
17:00
17:30
Interpretation: it is seen from the chart that all the points are below the upper
control Limit and there are no runs and trends. It is therefore the defect level is
under statistical Control.
d) Number of defects per unit “U” Chart
This is used when inspection unit value changes .For example the carpet was earlier
checked for defects in one square meter ,after few checks instead of one sqm. 1.5 sqm
are checked and after some time it was increased to 1.8 square meter. In such cases
control limits will change accordingly.
Time Inspection No.of Time Inspection No.of No.of defects =69
unit(Sqm) defects unit(Sqm) defects Total Sq.m checked =27.60
No.of defects/Sq.M=69/27.60
08:00 1.00 3 13:00 1.50 5 =2.50
08:30 1.00 4 13:30 1.50 6
UCLu = U+ 3 U/n
09:00 1.00 6 14:00 1.80 7
09:30 1.00 1 14:30 1.80 4 UCLu = U - 3 U/n
For inspection unit 1Sqm
10:00 1.00 4 15:00 1.80 3 UCL = 2.5+3 2.5/1
10:30 1.00 3 15:30 1.80 2 =2.5+4.74 = 7.24
11:00 1.50 7 16:00 1.80 3 LCL=2.5-4.74 = -2.24
For insp.unit 1.5 Sq.M
11:30 1.50 4 16:30 1.80 4 UCL=2.5+3 2.5/1.5
12:00 1.50 2 17:00 1.80 1 =2.5+3.9 =6.4
12:30 1.50 0 Total 27.60 69 LCL=2.5-3.9= -1.4
For insp.unit 1.8Sq.m
UCL=2.5+3 2.5/1.8
=2.5+3.6=6.1
LCL=2.5-3.6=-1.10
Number of defects per unit “U” Chart
8
UCL
7
6 6
5 4.7
4 4 4 4 3.9
3 3 3 3.3
2.7
CL 2.2 2.2
2 1.7 1.7
1 1 1.3 1.1
LCL 0.6
0 0
: 00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00
8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17
Continuous plotting help in finding out whether process is under control or not . Lack
Of control is indicated by points falling on or out side control limits. But even when the
values are within the control limits, process can be consider out of control if it is reflecting
Any one of the following pattern.
Run : It is a state when points occur continuously on one side of the central line and then
the number of points is called the length of Run.
As said earlier, control charts are
graphical aids in process control.
Continuous plotting help in finding
out whether process is under
control or not. Lack of control is
indicated by points falling on or
outside control limits.
But even when the values are
within the control limit, process can
be considered out of control if it is
reflecting any one of the following
patterns.
Run
10 out of 11 consecutive points
Seven-point length of run
occuring on one side is abnormal
Upper is abnormal
control
Limit
Central
Line
Lower
control
Limit
Central
Line
Lower
control
Limit
Central
Line
1.5 Sigma line
3 Sigma line
When most of the points are within 1.5 sigma line it is due to
inappropriate way of sub grouping.
Approach to Control Limit
Approach to the control limit ( 2 out of 3 points )
3 Sigma line
2 Sigma line
Central
Line
2 Sigma line
3 Sigma line
When two out of three points occur outside the 2 sigma line the case is considered abnormal.
PROBLEM SOLVING STEPS
• IDENTIFICATION OF PROBLEM
• SELECTION OF PROBLEM
• DATA ANALYSIS
• DEVELOPMENT OF SOLUTION
• REGULAR IMPLEMENTATION .