MODERN SEWAGE TREATMENT-
PLANT
Sewage pipe line
The sewage pipe line in Neyveli has a well planned
sewer line that runs through the perimeter of each
block along the whole township area as a result all the
waste from tubs,toilets,sinks etc. are all channeled
towards the lateral sewer line which then in-turn
chanels to the main sewer line that runs from north-
west to south-west by the action of gravity which has
natural slope also some sewer lines which are far from
main sewer line and can’t be drain by gravity are
concetrated by nearby sumps where pumphouse is
constructed to pump the waste to the main sewer line
and channeled to the modern sewage treatment plant.
Sewage pipe
line
=flush tank
(18 nos)
=man hole
(111 nos)
Sewage pipe line
Sewage pipe line
Components of sewer pipe line
Pipe line
diameter=8inches
made of vitrified clay pipe(vcp)
Slope recorded for 50 m a 25cm
down slope is given(1:4)
Lifespan=50 years
Approx depth =1 m
Chamber
Capacity =3000litres
Chamber intervals=40–50m
NLC manufactured concrete
blocks are used(39*19*19)cm and of
M20 grade
Sewage pipe line
Banyan
Cement mortar clay
rope
Modern sewage treatment plant
The main sewer pipe drains the waste to the modern
sewage treatment plant where the waste water is
treated by various means and gets discharged to the
free environment for irrigation and other purpose.
30 million litres per day treated
specifications
2 screens
3 pumps
Degriter chamber
Aeration tank
24 agitators(50hp)
Sedimentation tanks(2hrs)
Modern sewage
treatment plant
Control
room
Modern sewage
treatment plant
Main inlet
PUMPED FOR THE TREATMENT(1300m3 per hour)
Degritter chambers
slow down the flow
so that solids such as
sand, coffee grounds,
and eggshells will
settle out of the
water
Silt is extracted from the waste water then the water enters
aeration tank
• Aeration tank(surface aeration)
• Sedimentation tanks
• Treated with chlorine and discharged