An Overview
LNG
LMR
HMR
LMR bleed
NG Q
KT
C3 C2 C1 N2
HMR bleed
C3
T&I
Upstream T&I Assets Projects T&I
TRT Market Basic GHG
access Data mgt Share point
LNG Technology Platform LNG CoE Knowledge mtg
Market access
Projects
Upstream Assets CVP Modelling and SIGN
tools
platforms portal
SPOA
GLUG
Copyright of Shell International
IP Technical CI
Licensing CONFIDENTIAL
2
Fully Aligned with IG Business Priorities
Current Outlook: ~40 mpta, ~15 bln$ CFFO Current Outlook: ~50 mtpa by 2030 Current Outlook: 1-2 projects 2020-25
Goal: Close Gap-to-potential > 1 bln$/yr (SS) Goal: Lower REGAS cost & enable LNG4T Goal: Cost reduction to UTC5 (30-50%)
Areas of Opportunity: Areas of Opportunity:
Areas of Opportunity:
Eliminate threats to reliability & availability Improve acceptability of LNG as fuel.
Maximize Utilization, Secure upstream gas Proactively address methane emissions Lowering construction costs, time & footprint
Minimize turnaround duration and intervals Fast/affordable small-scale Regas & Shipping Radically simplify refrigeration schemes
Reduce exposure: Process control, automation Identify and close Process Safety gaps Reduce equipment count and complexity
Enable Top Quartile UOC & CO2 performance Reduce costs across LNG for Transport chain Reduce GHG emissions by 18%
Technology levers: Technology levers: Technology levers:
High capacity dehydration increasing TA Truck and shipping low cost LNG storage LNG 2020: 30% cost reduction through
intervals to 6 years ($40 Mln NPV) Jettyless LNG cutting civil works (~100 $Mln) compact build and run or maintain philosophy
Real Time Production Optimization1-2% more LNG engine performance, and oxidation 0.15 tCO2/tLNG designs
average production ($ 265 Mln)
catalyst development to eliminate methane slip Compact design using PFHE
Air Cooled Heat Exchanger performance, SuperCool LNG minimize BOG, stabilize LNG Expansion Based Liquefaction (no refrigerant)
1% increase ($265 Mln)
LNG Odorizer, HP Emergency Release System 3-D Printed Heat Exchanger
March 2017
Only develop items that Always consider in this Selectively kickstart/ Clear ways of working See it through to the end Success measured by
address order: develop
Gap to Potential 1. Fast de-risk existing Potential game Search wide Deployment path in Lower costs
(assets) options changers High grade fast place early Increased cash from
UTC-to-5 (projects) 2. Catalyze the differentiators for Deployment based Clear handover points assets
Gaps not covered industry, by showing Shell decisions Own until 1st Replication results
already the pathways Future needs of Truth seeking mindset deployment Selected as partner
LNG specific 3. Co-develop with projects and assets Continue to drive of choice
innovations industry (selectively) replication.
$400 mln
$2 mln Abadi Technology potential
T&T U/S capex reduction highlighted to
JAWS (Just Add Water) Lake Charles Rerating
Shipping optimization tool saves Productivity increase on platform Shell project team and
Technology review of power
fuel costs by optimizing speed legs and cost reduction thanks to Operator INPEX. Joint Cost
margins resulted in a yearly net
and draft using data analytics. HUMIDUR single layer coating.
production increase of 9%. Reduction Study on going.
$42 mln
OLNG & NLNG
HEPA filters enable capacity $26 mln -$2.0 bln capex
increase due to higher gas (being assessed – unrisked
NLNG
turbine availability. – 100% share)
Online Dynamic Flow Modelling
enables extra production during
Baltic LNG (development)
condensate spiking.
1 - 2% extra
Deploy LNG2020 Tactics
5
$275
deployments in IG
mln production (unconstrained)
Podium steps
Canada LNG T3/4 Use of a small ladder instead of Nigeria LNG
Production increase through use a scaffold for maintenance jobs
where it is possible.
RTPO Deployment Pilot
of LMS-100 gas turbine.
1
Shell Technology & Innovation Excellence Award runner-up 2017 Digitalisation Replication technology
RETURNS
Produce the limit
CASH &
Increase LNG NLNG Deploy +1% production +1% production
MODERATE
PFHE C3MR PFHE DMR
GROWTH
3D Printed HEX
improving reliability
projects; Autocooled LNG Cryocompressed LNG
Novel concepts LNG at -100C
Eliminating refrigerants
reduce capex Evaluation Z-LNG
Renewable LNG
to 4$/mmbtu GHG 0% tLCO2/tLNG
Organic rankin cycle
Air lubrication
costs by 1$ / Reduce shipping costs
5-10% less fuel
mmbtu
DEMAND
Integrated Regas/Powergen
GHG
More power, less CO2
Confidential
3. Development program
4. Technology examples
Governance: BTCs/ DRBs/Champion support meetings # 1/<18/<6 2/20/8 2/24/10 >2/24/>12 PTI
Projects
Technology explicit in opportunity register % < 70 70 80 90 IGPO
Number of deployments # 20 30 40 50 PE
Assets
Deployment Value realized from deployment $ mln 200 300 400 500 PE NPV; for $/yr, divide by 5
Projects Value realized from deployment $ mln 200 300 400 600 IGPO
Digitalization Digitalization roadmap in place % < 60 < 70 > 80 > 90 PE / TaCIT
Major items (SWW frontpage, Townhall presentation) # <3 3 4 >4 ER
Communication Minor items (LoB SWW, Yammer, Webcast) # 10 15 20 25 ER
Deployment Highlight Communication packs # 2 3 4 >4
“Technology Priority Assets” to be covered under the Technology Deployment FFF (as of Oct 2017):
ALNG, BLNG, ELNG, Gasnor, NLNG, NWS, OLNG, Pearl GTL, PLNG, Prelude, SEIC, SMDS, T&T Upstream, QGC
Not included: Regas (Dragon, Hazira), Gas Rings (Hangzhou, Comgas, Attiki) MLNG, QG4, Gorgon, SPD, WAPCo, Various Upstream (STOS, Bolivia, Arrow, SCEPCo, India, Karoo, Bangkot, Uruguay, Venezuela)
CONFIDENTIAL
NLNG endorsement:
117 tons/day => ~ 7.5 million $/year for train-5.
External Studies No No
No No
(Innovia, Future IG)
Third Party
input
CONFIDENTIAL
Drop or
Develop
Drop Drop
elsewhere in
LNG COE
Technology maturation
D1 D2 D3
Discover
1 Develop
2 Demonstrate
3 D4 Deploy
Development
Release process
Initialization Technical assurance Deployment
Opportunity Realization
(for operating assets & project prospects)
Develop
(e.g. small floater)
Programme
Programme
3. Development of new technology equipment
2. Project development improvement tools De-risking enabling of technologies
Office
4.
R&D
(incl. PDM): Not linked to Shell performance /
5. Developing of enabling technologies
Early contractor engagements guarantee / license
6. CTI: scanning and evaluation of technology
(systems / concepts) Project timeline often too short
solutions in the market
PRS to take concept on board
CONFIDENTIAL
‘Clubbing’ under R&D for
multiple applications & fiscal
efficiency
BRNC (mainly asset focused)
1. Knowledge management (including design manuals)
2. Tools that cannot be classified as R&D ((e.g. new process simulator)
3. Natworks
Copyright of Shell International 4. Asset improvement programmes CONFIDENTIAL
LNG TP: Maximize Cash from Assets, Affordable Growth & Market Access
RECENT HIGHLIGHTS
~$10 mln/yr (per train) Stronger focus on existing assets through deepdives, including
Real Time Production Optimization explicit digitalisation focus, and strengthened the LNG TP DRB.
(RTPO) Finished 2017 with 24 deployments into LNG assets (150 mln/yr).
Strong pull from Baltic and Abadi projects for LNG2020.
LNG Production
automation, targeting Completed demonstration of value from RTPO and JAWS.
$10
Need to watch the changes to P&T organization.
New 0.15 tCO2/tLNG design. fleet. Optimizing LNG Carriers draft and KEY DEPLOYMENTS COMING UP
Methane Abatement Catalyst. speed with data analytics.
Real Time Production Optimization deployment in NLNG, starting
replication for NLNG and setup similar effort for Oman LNG.
9%
TP budget ($MM)
Air Lubrication
Shipping LDN
Air Lubrication of LNG Carriers Motion Amplification
+6-8% fuel efficiency, on Gemmata in Software amplifies video of motion caused
July, 100+ ships potential in Shell, JV fleet. by vibrations, OLNG first deployment.
RTPO
Nigeria LNG
Smart Torque Wrench Motion Amplification Image
Nigeria LNG $1.00 mln Oman LNG
March 2018