Ash Handling Plant
Other applications include cellular concrete, roofing tiles, paints, metal castings,
filler in wood and plastic products.
COMPONENTS OF ASH
PLANT
BOTTOM ASH SYSTEM
BOTTOM ASH HOPPER
CLINKER GRINDER
HYDROEJECTOR
OVERFLOW TANK
BOTTOM ASH OVERFLOW PUMPS
BOTTOM ASH HOPPER
SEAL TROUGH
Economizer & APH HOPPER Ash Handling System
There are 4 nos. of Eco hopper & 8 nos of APH Hopper for each boiler
.
Coarse ash will be continuously evacuated through
Flushing apparatus system where it will be mixed with water & fed to
ASH SLURRY SUMP PIT through trench.
Eco booster water pump ( 85m3/hr, 6.5kg/cm2) will meet water requi
rement of flushing apparatus for all 4nos of Eco hoppers & seal box.
It is located at bottom Ash Hopper area. Water requirement of
APH hopper & associated trench of ECO & APH fulfill by FAHP pump
Bottom Ash Overflow System