After winning the Bid, the management will turn over the
project and the contract to Construction Department for 1. Bid Documents
Implementation. To fulfill the contract, construction 1.1 Invitation to Bid
group should study the Scope of Works and / or Terms of
1.2 Copy of Contract Documents
Reference, the required documents as instructed in the
Instruction to Bidders for proper turnover and handover 1.1 Special Provisions or Conditions
of the project to the OWNER/CLIENT. 1.2 General Conditions
1.3 Drawings
1.4 Specifications
1.5 Other Documents
Handover of Contract Documents by the Engineering to 2. All Applicable Bonds
The Construction Department for Implementation 2.1 Payment Bond
2.2 Performance Bond
2.3 Surety Bond
2.4 Guarantee Bond
2.5 Contractor All Risk (CARI) Bond
2.6 Warranty Bond
3. Letter of Proposal
4. Scope of Works
5. Detailed Construction Breakdown
6. Net Statement
7. Other Direct Cost (ODC)
8. Suppliers Quotation
9. Minutes of Meeting
LIST OF DOCUMENTS
1. Notice to Proceed (NTP)
2. Kick - off Meetings (Signed Documents)
2.1 Contract Documents
2.2 Bill of Quantities
2.3 Scope of Works (As Ammended)
2.4 Net Statement or Approved Working Budget
Other Direct Cost (As Planned by Construction
2.5 Manager)
Handover of Pre-Construction Documents by Construction
2.6 Take - off and Estimate Sheets (Base on Actual)
Department to Quantity Surveyor (QS) Department Complete Permit or " For Construction /
2.7 Implementation
Drawings with Elevation and
dimensions
2.8 Schedule of Loads (Updated and Latest)
2.9 Approved Material Vendor's list
2.10 Approved Material Specification
2.11 Costruction Schedule and Cash Flow
2.12 Planned Manpower Schedule
2.13 Planned Equipment Schedule and Listing
3. Schedule of PRS
4. Kick - off Meeting e-File Documents
LIST OF DOCUMENTS