• OFF BLAST PROCESS – BP 0.5 CLOSE THE NETWORK BY DCIV OR DEMISTER GOOGLE
VALVE
• OPEN ALL THE BLEEDER
OXYGEN PLANT TRIP
• STOVE
•
Diesel Generator (MCR Ground floor) should start
• If DG does not start inform Electrical Shift In-charge immediately
• When DG starts RESET the stove hydraulic pumps and START anyone
• Open SNORT 100 % to atmosphere
• BOX-UP the ON-GAS Stoves
• Select OFF Blast from Emergency Desk and BOX-UP the ON-Blast Stove
• Close MASV
• DO NOT open BDSV
•
GCP
•
Ensure ICW supply to pre-scrubber through XV5228. If not open it manually.
• Open N2 in Dust Catcher. Open Steam and N2 in pre-scrubber.
• Close Semi-clean bleeder when the blast pressure reaches 0.8kg/cm2.
• Close DCIV or BGIV respectively.
• Open available furnace bleeders after DCIV or BGIV is closed.
• Open AGE to 65%
•
COOLING
•
Ensure 5 DG Pumps are running (1 HP, 1 LP, 1 Stave, 2 ICW)
• DG pump of LP circuit needs to be started first followed by DG pump of stave circuit and subsequently DG of HP circuit needs to be started.
•
Cast House
•
Continue tapping irrespective of SGP is running or not
• Open 2nd tap hole if lap casting is not going on
• If lap tapping is going on open 3rd tap hole
• SUDDEN FALL IN THE BLOWER VOLUME RESULTING IN THE BLAST PRESSURE DROP .
• WHEN THERE IS FALL OF MORE THAN 500 NM3 OF VOLUME FROM THE SET VALUE BYPASS ON
COMMAND IS ACTIVE RESULTING IN THE QUICK FALL OF TOP PRESSURE IN ORDER TO MAINTAIN
DIFFERENTIAL PRESSURE (DELTA P) BY LOCKING THE AG AT THE PARTICULAR RUNNING CONDITION
.
• THIS WILL ALLOW THE TOP PRESSURE TO RELEASE IN ORDER TO MAINTAIN DP.
• If oxygen was running shut off valve (OGSV ) will close as the blast drops down to 3500 so close
the control valve ( OGCV ) set value should be changed to 0 .
• CDI should be reduced to 12 TPH if 3000 NM3 blast is available.
• WHEN THE CONDITION IS NORMAL . INCREASE THE VOLUME TO 3700 OR WHATEVER MAXIMUM
CAN BE GIVEN BY THE SINGLE BLOWER
• RESUME THE NORMAL OPERATION BY EQUALIZING THE TOP
PRESSURE WITH THAT OF RUNNING PROCESS VALUE AND THE BLAST
VOLUME SET VALUE TO THAT OF EQUAL TO THE CURRENT BLOWER
END VOLUME .
• GO FOR BYPASS OFF AND UNLOCK THE AG FOR NORMAL CONDITION
THEREAFTER GO NORMAL INCREASE OF VOLUME WHEN EVER 2ND
BLOWER COMES IN LINE
b) Both Blower Tripped.
• Incase of both blower trip , blast pressure falls drastically and below 1.7
kg of it semi clean will be opened to release the top pressure .
• Isolate the furnace in that condition from the stove side
• Put the on gas stoves to box up close the CA fan and booster fan to off
mode .
• Put the on blast stove to box up .
• In furnace side start purging at the furnace top by steam and nitrogen
• Cast house side open the tap hole as soon as possible . One should be
running other should be opened immediately to avoid chances of slag
back . If 3 are available open all within no time . .
• Close the bleeder at line pressure 200 mm water column to maintain
positive pressure.
• Look into the peep holes of tuyere to see any slag back into the
tuyere if it so take into note how many and in which particular tuyeres
it is.