Code: GI 7 BSR-PRO-000-020
SCAFFOLDING PROCEDURE
Code: GI 6 BSR-HSE-PRO-029
Note:
• This document only provide some major contents according to the Guideline on
WAH and the Scaffolding safety procedure
• For more detail, please refer to all contents in documents above
1 Definition
6 Good/Bad pictures
WORKING AT HEIGHT
DEFINITION
3
WORKING AT HEIGHT
HAZARDS OF WORKING AT HEIGHT
4
WORKING AT HEIGHT
HAZARDS OF WORKING AT HEIGHT
Falling objects
5
WORKING AT HEIGHT
HAZARDS OF WORKING AT HEIGHT
• Working on scaffold
6
WORKING AT HEIGHT
HAZARDS OF WORKING AT HEIGHT
• Bad Weather
7
WORKING AT HEIGHT
HAZARDS OF WORKING AT HEIGHT
• Slipping-Tripping
8
WORKING AT HEIGHT
HAZARDS OF WORKING AT HEIGHT
9
WORKING AT HEIGHT
GENERAL CONTROL MEASURES
10
WORKING AT HEIGHT
PROPER USE OF LADDER
11
WORKING AT HEIGHT
PROPER USE OF LADDER
12
WORKING AT HEIGHT
PROPER USE OF SAFETY HARNESS
It should be hooked full body harness to a overhead structure. Do not hook into electric cable
trays or pipelines
13
WORKING AT HEIGHT
PROPER USE OF SAFETY HARNESS
14
WORKING AT HEIGHT
HANDRAIL
15
WORKING AT HEIGHT
SAFETY NET FOR FALLING OBJECTS
16
WORKING AT HEIGHT
WARNING LINE
17
WORKING AT HEIGHT
THE SAFETY REQUIREMENT OF USE OF LIFTING BASKET
18
WORKING AT HEIGHT
THE SAFETY REQUIREMENT OF USE OF LIFTING BASKET
19
WORKING AT HEIGHT
TRAVEL RESTRAINT SYSTEM
20
WORKING AT HEIGHT
ROPE ACCESS
21
WORKING AT HEIGHT
ROPE ACCESS
22
WORKING AT HEIGHT
PERSONNEL FALL ARREST SYSTEM
Be a system with
landyard/lifeline , fullbody
harness and anchor);
23
WORKING AT HEIGHT
RESCUE PLAN
Emergency plan will be developed in JSA
meeting for critical works
Rescue team and equipment must be
mentioned in emergency plan before start of
work
After falling and held by harness, the victim
must be rescued ASAP. Emergency response
as follow:
+ Inform immediately to rescue team.
+ Clearance of area for rescue team
24
DEFINITION
Scaffolds: Be a temporary structure to perform work at
height such as: maintenance jobs, construction..., and can also
be used to make walkways and lifting/lower equipment from
height.
Purpose of this procedure is to ensure safety during
erection/dismantling and use of scaffolding in BSR
25
DEFINITION
RESPONSIBILITIES OF SCAFFOLDING ERECTING AREA
Ensure scaffold not obstruct to operation equipment, emergency
equipment
Pemitted to stop work in case of unsafe conditions
Assign responsible person to check and sign on scaffolding checklist
RESPONSIBILITIES OF SCAFFOLDING CONTRACTOR/SECTION OF BSR
Comply with the safety requirement for vehicles, scaffolding
material,…during carry out scaffolding works
Organize to inspect weekly scaffolding
Approved PTW before erection of scaffolding
26
HAZARDS OF SCAFFOLDING WORKS
Hazards:
Thợ giàn giáo chưa thành thạo/ Incompetent Scaffolder
27
HAZARDS OF SCAFFOLDING WORKS
Hazards:
Điện giật/Electric shock
Nền móng/Foundation
28
GENERAL SAFETY REQUIREMENT
Requirement
Personnel Fabricated frame
Steel pipe scaffold
scaffold
Primary scaffolding
Primary scaffolding
course
course
Scaffolder or
or
Certificate of Level
Certificate of Level 1
1
Designer, supervisor, inspector
Certificate of Level
of scaffolding contractor & Certificate of Level 2
2
scaffolding erecting dept.
29
GENERAL SAFETY REQUIREMENT
Note: All certificates are issued to participants and to follow scaffolding standards such
as BS 1139-5973-5974-5975, EN 12811, US OSHA: 3150, AS/NZS 4576 or equivalent.
30
GENERAL SAFETY REQUIREMENT
SCAFFOLDING MATERIAL:
Type of material Criteria
No specification of manufacturer
Thickness is less than 3,6 mm
Steel tube of scaffolding
Frame and cross brace are rusty, distortional, twist, warped or crack
Fabricated frame scaffold
Cross brace is not fix to the fabricated frame, no Pin to lock at the end
of cross brace
No specification of manufacturer
Clamp
Deformation or crack
31
GENERAL SAFETY REQUIREMENT
SCAFFOLDING MATERIAL:
Type of material Criteria
Deformation, twist, bent, or crack
Thread is lost or worn
Jack, Base plate, sole plate No crack
No specification of manufacturer
Tấm lót sàn Deformation, twist, bent, or crack
Heavy rust
32
GENERAL SAFETY REQUIREMENT
SCAFFOLDING MATERIAL:
Damaged materials which do not meet the scaffolding
standards, must be marked up and stored separately and
promptly moved out of storage and / or working area
33
GENERAL SAFETY REQUIREMENT
SCAFFOLDING MATERIAL:
Scaffolding materials must have a certificate of origin
by the manufacture, in good condition.
34
GENERAL SAFETY REQUIREMENT
SCAFFOLDING MATERIAL:
Base plates are manufactured and used according to the
manufacturer's instructions
+ For special duty scaffolds: The size of the sole plates must be
determined by the designer.
35
GENERAL SAFETY REQUIREMENT
SCAFFOLDING MATERIAL:
Planks
Strong and in good condition to withstand the
calculated load
36
GENERAL SAFETY REQUIREMENT
Scaffolding design:
All scaffolds in BSR must meet the requirements of design,
erection, use, dismantlement as stated in the technical
documents and/or certificate of origin by the manufacturer.
Do not erect, use or dismantle scaffolding without the above
documents.
37
GENERAL SAFETY REQUIREMENT
Scaffolding design:
Scaffolding design drawings must contain the following contents (but not limited to):
- Name of location
38
GENERAL SAFETY REQUIREMENT
Scaffolding design:
Scaffolding design drawings must contain the following contents (but not limited to):
- Height, width, braces, working platforms and access of scaffolding. Location, size of
bay expansion, location of horizontal bracing points for scaffold which have a height
exceed three (03) times the minimum base width.
39
GENERAL SAFETY REQUIREMENT
Erection/dismantling of caffolding :
Do not carry out scaffolding works in bad weather
such as thunderstorms, darkness, rain or strong
winds of level 5 or higher (equivalent to 8 m / s)
40
GENERAL SAFETY REQUIREMENT
Erection/dismantling of caffolding :
Install horizontal bracing or base extension for scaffold
which have a height exceed three (03) times
the minimum base width
41
GENERAL SAFETY REQUIREMENT
Erection/dismantling of caffolding :
Before erection of scaffolding, it is required to
install temporary planks (when there is no
working platform yet) at suitable locations of
each floor for scaffolder standing to work to next
floors
42
GENERAL SAFETY REQUIREMENT
Base plate and sole plate:
The base plate/sole plate is used to distribute load on
foundation. It must be install the base plates for
scaffolds placed on the fixed platform (Grating) and
the base plates should be placed immediately on the
support/structures of the floor.
43
GENERAL SAFETY REQUIREMENT
Base plate and sole plate:
44
GENERAL SAFETY REQUIREMENT
Working platform:
The width of the working platform is at least 0.5 m. The
load placed on the working platform should be evenly
distributed and planks must be clamped tightly to the
ledgers by specialized clamps (do not use zinc wire) ≥ 0,5 m
45
GENERAL SAFETY REQUIREMENT
Handrail and toe board:
Hnadrail must be installed on all open sides from 2 m above
the ground or work surfaces below
46
GENERAL SAFETY REQUIREMENT
Handrail and toe board:
47
GENERAL SAFETY REQUIREMENT
Handrail and toe board:
The two-way access from the ladder to the working platform must always be closed after every
access to ensure the prevention of falls, similar to the contiguous space between the working
platform and the internal ladder , it must also covered to protect against falls
48
GENERAL SAFETY REQUIREMENT
Ladder and access:
The maximum height of a ladder is 6 m. The distance between
the rungs is from 0.23 m to 0.36 m, the width of steps is not be
shorter than 0.3 m
0,9 m
The minimum distance from the top of the ladder to the working
platform is 0.9 m
It is not allowed to stand on the top three (03) steps of the ladder
49
GENERAL SAFETY REQUIREMENT
Ladder and access:
It is allowed to use scaffolding tubes connected to the structure of
scaffolding to set up the safe access between the floors of scaffold
but must comply with the distances of rung of ladder
50
GENERAL SAFETY REQUIREMENT
Ladder and access:
The slope of the ladder is recommended not to exceed
75 ° with the horizontal. For mobile steel tube
scaffolds, ladders must be installed inside of base of
scaffolding
51
GENERAL SAFETY REQUIREMENT
Safety net:
Prevent people/materials/tools from falling into the working areas below, normal
size of net is about 4 m x 3 m. The width of safety net is more than 2.5 m on all
sides from the edge of the working platform
The load of safety net ensures that it can withstand the maximum load as
required. The distance from the nearest working platform to the safety net must
not exceed 4.5 m
The installation of safety net will be considered, decided in JSA and ensure the
following requirements.
+ Do not shade the light and ventilation for the surrounding area.
52
GENERAL SAFETY REQUIREMENT
Lifting/Lowering by manual fixed pulley :
To ensure safety during lifting/lowering work, the following safety
requirements must be complied with:
Fixed Pulleys and related equipment must be inspected and sticked sticker
before entry BSR
T
The pulley must be firmly anchored to the fixed structure and in a suitable
T
location for the lifting man who must wear a safety harness when working.
The weight of load must not exceed 30kg/1time/person
53
GENERAL SAFETY REQUIREMENT
Lifting/Lowering by manual fixed pulley :
For ensuring in safety during lifting/lowering works, the following safety
requirements must be complied with:
Installation of pulley includes the main components such as: Main supporting
bar, reinforcing bar and slip-resistant device.
Put warning sign/tape at the lifting/lowering area and only carry out when this
area is safe.
54
GENERAL SAFETY REQUIREMENT
Lifting bag:
Lifting bags are made of durable, strong material. On the body
of the bag, the safe working load (SWL-kg) must be specified.
Do not store bulky materials and exceed the safe working load
of the bag. Before lifting/lowering, the bag must be tightened
to prevent the falling of material during transportation
55
GENERAL SAFETY REQUIREMENT
Material basket:
The specification of manufacturer on lifting bag must
clear and placed at easily identifiable location with
the following content: the name of manufacturer,
manufacturing year, serial number, lifting load in
kilograms (kg) and/or tons ( t)
56
GENERAL SAFETY REQUIREMENT
Material basket:
The lifting basket must be tested and certified by a
third party
57
SAFETY REQUIREMENTS FOR OTHER SCAFFOLDS
Steel tube scaffold:
Be Scaffolding consists of steel pipes and connectors such
as standards, ledgers and braces.
58
SAFETY REQUIREMENTS FOR OTHER SCAFFOLDS
Steel tube scaffold:
The standards are allowed to use connectors and to ensure the locations
of the connecting points must be placed askew on the same floor. Do not
use connectors on the ledgers
Scaffolding components on a scaffold must have the same specifications
59
SAFETY REQUIREMENTS FOR OTHER SCAFFOLDS
Mobile scaffold:
The height of mobile scaffold not exceed three
(03) times of the minimum base width.
60
SAFETY REQUIREMENTS FOR OTHER SCAFFOLDS
Mobile scaffold:
Wheel:
All wheels of the mobile scaffolding must ensure to
withstand four (04) the calculated loads. It is strictly
forbidden to use the wheels of unknown origin.
The wheels shall be caster wheels (not the air tire) with a
minimum diameter of 0,1 m, unless special design is
required by other material.
61
SAFETY REQUIREMENTS FOR OTHER SCAFFOLDS
Mobile scaffold:
- Only use mobile scaffolds on flat surfaces and enough
capable of withstanding the calculated loads;
62
SAFETY REQUIREMENTS FOR OTHER SCAFFOLDS
Hanging scaffold:
The hanging scaffolding is usually erected in places where it cannot be erected
or if erecting scaffold from the ground will be uneconomical.
The main supporting structure of hanging scaffolding systems must be
capable of withstanding at least 1.5 times the calculated load of the scaffold
Before erection, it must carefully survey the scene to select the appropriate
location (space, main anchor points, ...). After that, the designer will peform
detailed designs to ensure safety for later scaffolding works
63
SAFETY REQUIREMENTS FOR OTHER SCAFFOLDS
Fabricated frame scaffold:
The fabricated frame scaffolds are quickly assembled together by frame and cross
braces. It often used in construction such as construction scaffold, modular scaffold,
etc. or the type of scaffold is made of aluminum alloy which BSR equip to use
The installation of this scaffold must comply with the manufacturer's instructions
and meet the requirements of the dept./section of the use of scaffold. The working
platforms must be fully covered before working. It must be specified a safe working
load on the body of scaffold
The Frame and components must have equivalent specifications. To ensure safety,
it is allowed to reinforce this type of scaffolding by using the materials of steel tube
scaffolding (tube, toe board) to enhance the rigidity of the scaffold and preventing
falling objects. For this type of scaffolding, it is allowed to replace the toe boards by
safety net to prevent the falling object.
64
SAFETY REQUIREMENTS FOR OTHER SCAFFOLDS
Fabricated frame scaffold:
Phải kiểm tra định kỳ khung và phụ kiện của giàn giáo ống thép chế tạo sẵn.
Những bộ phận hư hỏng hay bị mòn, phải được thay thế. Công tác bảo trì
phải được tiến hành trước khi sử dụng.
Inspect the frame and components periodically and before use to replace
damaged materials .
65
INSPECTION AND SCAFFOLD’S TAG
Inspect before use:
After completing the erection of scaffolding, the relevant parties must inspect the whole scaffold
and hang tag before use (According to the form BSR-HSE-PRO-029 / F-002)
After insecting, The form (including periodic or unscheduled inspections) must be signed by
relevant parties and attached to PTW (allow to use a copy) before approval.
66
INSPECTION AND SCAFFOLD’S TAG
Periodic or unscheduled inspections
Weekly (no more than 7 days), scaffold must be inspected and signed on the
form BSR-HSE-PRO-029 / F-002 before attaching it to PTW to continue
scaffolding works at site
If it have any changes to the scaffolding structure, the scaffold must also be
inspected and re-tagged before use.
After inspecting, The green tag must be attached to scaffold with full
information such as load, inspection date, name and signature of inspectors.
67
INSPECTION AND SCAFFOLD’S TAG
SCAFFOLDING TAG:
Scaffold is in
inspection Scaffold is
Not safe for Do not allow to
use use
safe for use
68
The height of
scaffold exceed
three (03) times
the minimum
base width.
69
Lack of dimesion,
location.
Do not brace as
stipulated
70
Before
After
No base plate
and sole plate
71
Lack of
plugs
72
Lack of SWL.
Bag is
damage
(torn)
73
No specification
No lifting lugs
74
Certificate is
faded
75
Scaffold alredy
erected but lack
of ladders
76
Not meet the
distance of 0,9m
from top ladder to
the surface of the
working platform
77
Position of
scaffolder is not
safe
78
No temporary
platform
No safe
access
79
Gap >1 inch
Not fixed planks
tightly
No toe board
80
No Toe board
81
No handrail
No Toe board
82
No warning tape
and warning
sign
83