The Decongestionenvironment Plan
Relocation of DIPOs outside Camp BGen Rafael T Crame
ORGANIZATIONAL GAPS AND
INTERVENTIONS DIPO-SL:
Location: Mayao Kanluran,
Lucena City
Lot Status: LGU owned
Area: 1 hectare
Proposed Acquisition:
Donation
Status: Conduct of survey &
42.30
BUILDING
execution of Land
ONE-WAY TRAFFIC
Donation
(Signing of Deed of
T W O -W A Y T R A F F IC
O N E -W A Y T R A F F IC
PED
PED ENTRY/EXIT ENTRY/
EXIT
50.00
TWO-WAY TRAFFIC
T W O -W A Y T R A F F IC
O N E -W A Y T R A F F IC
TWO-WAY TRAFFIC
PROVISION
FOR
GUARD
HOUSE
PED/ VEHICLE
EXIT/ ENTRANCE R O A D
5
Internal
The Decongestionenvironment Plan
Relocation of DIPOs outside Camp BGen Rafael T Crame
ORGANIZATIONAL GAPS AND DIPO-Visayas (1st Option)
Location: Negros Oriental.
INTERVENTIONS Area: _______
Lot Status: _______
Proposed Acquisition: ____
Status: Coordination with the Gov. Roel
R. Degamo, Province of Negros Oriental.
Gov. Degamo informed them that he will
request the DENR-Region 6 to look for a
lot suitable for APO-Visayas
42.30
BUILDING
ONE-WAY TRAFFIC
T W O -W A Y T R A F F IC
O N E -W A Y T R A F F IC
PED
PED ENTRY/EXIT ENTRY/
EXIT
50.00
TWO-WAY TRAFFIC
T W O -W A Y T R A F F IC
O N E -W A Y T R A F F IC
TWO-WAY TRAFFIC
PROVISION
FOR
GUARD
HOUSE
PED/ VEHICLE
EXIT/ ENTRANCE R O A D
6
Internal
The Decongestionenvironment Plan
Relocation of DIPOs outside Camp BGen Rafael T Crame
ORGANIZATIONAL GAPS AND
INTERVENTIONS DIPO-EM: (1st Option)
Location: Bago Osihiro, Davao City
Area: 1 hectare
Lot Status: Administered by the
Bureau of Plant Industry (BPI)
Proposed Acquisition: MOA
Status: A draft of Memorandum of
Agreement (MOA) was
42.30
BUILDING forwarded to the Bureau of
ONE-WAY TRAFFIC
Plant Industry (BPI) for their
comment on December 2019
T W O -W A Y T R A F F IC
O N E -W A Y T R A F F IC
PED
PED ENTRY/EXIT ENTRY/
EXIT
50.00
TWO-WAY TRAFFIC
T W O -W A Y T R A F F IC
O N E -W A Y T R A F F IC
TWO-WAY TRAFFIC
PROVISION
FOR
GUARD
HOUSE
PED/ VEHICLE
EXIT/ ENTRANCE R O A D
7
Internal
The Decongestionenvironment Plan
Relocation of DIPOs outside Camp BGen Rafael T Crame
ORGANIZATIONAL GAPS AND
INTERVENTIONS
DIPO-WM: (1st Option)
Location: Balintawak, Pagadian City
Area: 3 Hectares
Lot Status: Owned by the LGU of Balintawak,
Pagadian
Proposed Acquisition: Donation
Status: Ex-O, DIPOWM to meet with Mayor
42.30
BUILDING
Samuel Co, Pagadian City on the 3rd Week
ONE-WAY TRAFFIC
of February
T W O -W A Y T R A F F IC
O N E -W A Y T R A F F IC
PED
PED ENTRY/EXIT ENTRY/
EXIT
50.00
TWO-WAY TRAFFIC
T W O -W A Y T R A F F IC
O N E -W A Y T R A F F IC
TWO-WAY TRAFFIC
PROVISION
FOR
GUARD
HOUSE
PED/ VEHICLE
EXIT/ ENTRANCE R O A D
8
Internal
The Decongestion environment Plan
Relocation of NOSUs outside Camp BGen Rafael T Crame
ORGANIZATIONAL GAPS AND
INTERVENTIONS
9
Internal
The Decongestion environment Plan
Relocation of NOSUs outside Camp BGen Rafael T Crame
ORGANIZATIONAL GAPS AND
INTERVENTIONS
Maritime Group:
Location: Calatagan, Batangas
Area: 1 hectare
Lot Status: Owned by San Miguel
Corporation
Proposed Acquisition: Usufruct
Status: Deed of Usufruct was already
forwarded to Legal Service thru MG-SLO for
legal opinion. The owner will furnish the
PNP-MG a copy of the Deed of the Absolute
Sale since the Certificate of Title is still titled
in the name of Ana Margarita Rufina M.
Quiogue
10
Internal
The Decongestion environment Plan
Relocation of NOSUs outside Camp BGen Rafael T Crame
ORGANIZATIONAL GAPS AND
INTERVENTIONS
CIDG NCR:
Location: Camp Bagong Diwa, Taguig
City
Area: 800 sq.m.
Lot Status: On-going application of
Presidential Proclamation of
the PNP on whole area
occupied by CBD
Proposed Acquisition: not applicable
Status: Forwarded a memo for RD,
NCRPO for allocation of 800
sq.m. (minimum) within Camp
Bagong Diwa.
11
Internal
The Decongestion environment Plan
Relocation of NOSUs outside Camp BGen Rafael T Crame
ORGANIZATIONAL GAPS AND
INTERVENTIONS
LSS:
Location: Baras Rizal
Area: 1 hectare
Lot Status: On-going application of
Presidential Proclamation of the
PNP on whole area occupied by
CBD
Proposed Acquisition: not applicable
Status: Memo sent to NCRPO (Attn: R4,
NCRPO & Camp Commander) on
February 1, 2020 asking permission and
comment on the proposed relocation
site of LSS inside the Bicutan
Warehouse.
12
Internal
The Decongestion environment Plan
Relocation of NOSUs outside Camp BGen Rafael T Crame
ORGANIZATIONAL GAPS AND
EOD-K9: INTERVENTIONS
Location: Pinugay, Baras, Rizal
Area: 9.2 hectares
Lot Status: Under the
Administration of DILG as
stated in Presidential
Proclamation 1355
Proposed Acquisition: MOA with
DILG
Status: Forwarded a Memo to ES
dated February 4, 2020 for the
crafting of the Development Plan
since a 9.2 hectares lot was
already delineated on the lot.
13
Internal
The Decongestion environment Plan
Relocation of NOSUs outside Camp BGen Rafael T Crame
ORGANIZATIONAL GAPS AND
HPG INTERVENTIONS
Location: Global City, Clark
Airbase, Angeles City
Area: _______
Lot Status: Owned by BCDA
Proposed Acquisition: ________
Status: PBGEN ELISEO DC CRUZ,
HPG Director discussed the
necessary requirements
needed for the future HPG
Headquarters with PATROL
PARTYLIST Representative
Jorge Antonio Bustos last
January 30, 2020.
14
PNP SUSTAINABLE DEVELOPMENT PLAN
ISSUES AND
OBJECTIVES PROJECT/ACTIVITIES OPR
CONCERNS
1. Absence of Camp Development 1. To establish a master camp 2. FACILITIES DEVELOPMENT
Plan for Camp Crame, RHQs, and development plan for Camp
Provincial Camps Crame and other PNP Camps a. Camp Crame Master Development Plan HSS
a.1 Construction of new NHQ building (18 floor with roof PROs
2. Lack of essential camp facilities and 2. To provide a suitable and ideal deck and basement) DL
standardized workspaces including work space and environment for a.2 Construction of new buildings prioritizing on personnel LSS
personnel quartering inside NHQ PNP personnel and stakeholders quarters, commissary and wellness center)
a.3 Repair and refurbishment of infrastructure
ES
and PROs PNPA
a. 4 Road and sidewalk
3. To provide a standardized and NPTI
3. Weak or inadequate internet accessible PNP infrastructures b. PNPA Development Plan DICTM
connectivity including personnel quartering c. NPTI Development Plan ITMS
with strong internet connectivity d. PROs/PPOs Camp Development Plan
e. Demolition of old and beyond economical repair buildings
CPSM
4. Dilapidated/outmoded buildings
(Buildings constructed from 1963 to f. Lot titling and turn-over of properties to PNP
g. Establishment of PNP Commissary and concessionaires
2000)
h. IT Development
i. Upgrading of Offices/Units (renovations and
5. Weak or inadequate internet refurbishments)
connectivity j. Maintenance and repair program
2. FACILITIES DEVELOPMENT
a. Camp Crame Development Plan
A high rise building edifice to house the Command Group,
D-staff and administrative offices.
It is the vertical solution in decongesting the camp and an
icon of PNP modernization.
Floors: 18 with roofdeck and 3 basement levels
Aside from constructing a new NHQ building that is
capable of accommodating administrative offices vertically,
most operating units are set to be transferred outside
Camp BGen Rafael T Crame.
2. FACILITIES DEVELOPMENT
b. PNPA Development Plan
2. FACILITIES DEVELOPMENT
b. PNPA Development Plan
NON-ACADEMIC CADET ZONE
ZONE 1. 4-STOREY CADET DORMITORY BLDG. 1
1. OBSTACLE COURSE (72 Units, Capacity = 288 Cadets)
2. INDOOR SWIMMING POOL
2. 4-STOREY CADET DORMITORY BLDG. 2
3. 8-LANE RUBBERIZED TRACK & FIELD OVAL
(72 Units, Capacity = 288 Cadets)
GROUND W/ HELIPAD
4. GRANDSTAND 3. 4-STOREY CADET DORMITORY BLDG. 3
5. AUDIO VISUAL BLDG. (72 Units, Capacity = 288 Cadets)
6. MESS HALL (PPSC Funded)
7. MULTI-SPORT GYMNASIUM 4. 2-STOREY CADET DORMITORY BLDG. 4
8. RAPPELLING TOWER (36 Units, Capacity = 144 Cadets)
9. KILL HOUSE / CQB AREA
10. FIRING RANGE BLEACHER 5. BARBERSHOP, TAILORING & LAUNDRY
11. 2-STOREY FIRING RANGE OFFICE BLDG. BLDG.
12. 2-STOREY FIREARM PROFICIENCY
TRAINING BLDG. 6. 4-STOREY CADET DORMITORY BLDG. 5
13. 2-STOREY ENGINEERING BLDG. (130 Units, Capacity = 520 Cadets)
14. FIRING RANGE SHADE
15. INDOOR FIRING RANGE 7. 4-STOREY CADET DORMITORY BLDG. 6
16. MOTOR POOL (130 Units, Capacity = 520 Cadets)
17. MATERIAL RECOVERY FACILITY
18. 6.0m ROAD NETWORK W/ BRIDGE 8. 4-STOREY CADET DORMITORY BLDG. 7
(130 Units, Capacity = 520 Cadets)
GATE 2
PCADG
CONCESSIONAIRES
HERITAGE
FEO
MORTUARY
HERITAGE PARK
TERS
WORSHIP CEN
SALAAM VIC
PCO
OFFICERS ROW
CLUBHOUSE
AKG
CIDG
PNCO
CRIMELAB
CONDOMINIUMS
GEN P SANT
OS AVE.
The Proposed Master Development Plan
Quadrant 4
GATE 3
ES
HSS
WCPC
O ST.
VILLA DELGAD
TRAINING SCHOOLS
DORMITORIES
1LT
OL
MOTORPO
ALA
RMD
GAR
GEN CASTANEDA ST
E
WAREHOUS
PNCO CONDOS
IAS
IRE
BASE F N
STAT IO
IMEG
CONDO 9
S AVE
GEN P SANTO
PNP SUSTAINABLE DEVELOPMENT PLAN
ISSUES AND
OBJECTIVES PROJECT/ACTIVITIES OPR
CONCERNS
3. DELINEATION OF RESPONSIBILITIES
1. Undefined Span of Control of RD, 1. To generate additional
PROs positions and ranks a. Designation of focus Unit for Law DPL
Enforcement and Anti-Criminality- PROs, PROs
2. Redundancy and overlapping of 2. Streamline units and RMFB supported by SAF DIPOs
functions of Units resulting to lack functions to ensure focus b. Designation of focus Unit for Internal Security DI, IG
Operation including Search and Rescue - SAF
of focus to specific mandates and avoid duplication
DIPOs, APSB and SAF
3. Hard to pinpoint responsibilities 3. To establish a focused Unit c. Designation of focus Unit for Anti-Terrorism-
due to multitasking with specific mandate on IG, and SAF
law enforcement, ISO, d. Reorganization and Restructuring of
4. Specific concerns not properly SAR and Terrorism Units/Offices
addressed
PNP SUSTAINABLE DEVELOPMENT PLAN
ISSUES AND OBJECTIVE PROJECT/ACTIVITIES OPR
CONCERNS
RECRUITMENT AND SELECTION
Acceptance of below average To ensure recruitment of quality a. Continuous conduct of recruitment and selection
applicants applicants of applicants DPRM
PRS
b. Conduct of continuous CBI of applicants DI
HS
c. Involvement of stakeholders in the recruitment PROs
process NSUs