Professional Documents
Culture Documents
1. Concept
2. Organization
3. Urgent Reporting Procedure
4. Recovery Procedure
5. Safety Management Procedure
6. Precautions
2
1. Concept KSGM
Zero Accident
&
Urgent Report
3
1. Concept KSGM
MPT and KSGM will bring in some part of Health & Safety Procedure to
Myanmar which are conducted in Japan.
4
2. Organization KSGM
5
2. Organization KSGM
7
3. Urgent Reporting Procedure KSGM
8
3. Urgent Reporting Procedure KSGM
Authority
Abbreviation
SSV HSM = Health & Safety Manager
SSV = Subcon Super Visor
9
3. Urgent Reporting Procedure (2) Reporting Rule KSGM
1st priority is taking care of injured person or recover the existing service. 1 st action carried out
properly then report immediately with following rules. Followings are included “Incident”
a. Any accidents or “close calls” .
b. Someone gets sick and need urgent medical treatment.
c. Damage to any Equipment for construction and existing.
d. Damage for MPT’s property, 3rd party’s property and public property.
e. Contaminant to environment such as river water, soil and so on.
f. Injury to Human.
Firstly, contact to the KSGM and/or MPT by the phone.(see Appendix 2)
Secondly, Send e-mail with follow information.( template Appendix 3)
g. Date and Time of the Incident.
h. Place of the Incident
i. Situation of the Incident
j. Cause of the Incident
k. When injured or sick, please also include the following items;
(1) person name and age
(2) company name
(3) part of body that was injured, degree of injury.
First report is important, even if all of the information is not available.
10
4. Recovery Procedure KSGM
(1) Reporting
(2) Stop the Project until preventive actions carried out
properly.
(3) Action Meeting by prime constructor and KSGM
(4) Confirmation & Approval of preventive Action by
KSGM
(5) Restart Project by KSGM
11
4. Recovery Procedure KSGM
(1) Reporting
a. Reporting Incident
Reporting of incident is done according the Urgent Reporting Procedure.
KSGM HSM will determine to stop the project with following Criteria.
Restart Project
13
4. Recovery Procedure KSGM
14
5. Safety Management Procedure KSGM
15
5. Safety Management Procedure KSGM
(6) ID Card All people working at site must wear ID -card with info, company
name, full name of the person, photo of the person, blood type, contact number of
Vendor.
(7) Others Other issues relating to Safety Management Procedure is stated on the
Health and Safety Specifications which is on Appendix1. Vendor must follow this
Health and Safety Specification at all the construction relating to KSGM.
16
6. Precautions KSGM
(1) MPT & KSGM forbid the labor of;
a. Child Labor (ages under 18 years old)
b. Slavery or Forced Labor.
(2) Caution Signs The caution signs has to be displayed for every site before
starting any construction.
a. Signs have to have text in Myanmar and English Language.
b. Minimum List of sign to be used;
High voltage warning, First Aid box, No entry, PPE and site security, Think
safety slogan, Fire extinguisher, Drink Water sign, Deep excavation, Danger
Construction site no entry, Low Headroom, Site code and Location, Emergency
numbers.
17
6. Appendix KSGM
18
KSGM
Zero Accident
&
Urgent Report
19