You are on page 1of 24

PRESENTATION ON STUDENT INDUSTRIAL WORK

EXPERIENCE SCHEME
(SIWES)
AT
TRANSMISSION COMPANY OF NIGERIA
BY
KOLAWOLE JOSHUA AYOMIDE
168540043
DEPARTMENT OF ELECTRICAL AND ELECTRONIC
ENGINEERING.
CONTENTS

 About TCN

 SKILLS ACQUIRED

 PROJECT EXECUTED

 CHALLENGES

 CONCLUSION
About TCN

TCN

It was incorporated in 1963 by late chaim weiss

TCN has accomplish a large number of project of all rang

TCN area of expertise are designing, electrical, mechanical,


maintenance,
SKILLS ACQUIRED

Designing using of autocard

Scaling of drawing

formation of doing job on site


ASSIGNMENT/PROJECT AND CONTRIBUTION

 Installation of distribution board


 Installation of cable
 Installation of cable tray
 Installation of switch
 Installation of intermediate switch
 Socket
 Installation of grid switch
 Installation of PIR sensor
DIAGRAM\SCHEMATIC DIAGRAM
DISTRIBUTION BOARD

Click icon to add picture


GALVANIZED
WIRE MECH CABLE TRAY
ONE GANG SWITCH

Click icon to add picture


TWO GANG SWITCH

Click icon to add picture


THREE GANG SWITCH

Click icon to add picture


DIAGRAM AND SCHEMATIC
DIAGRAM
DIAGRAM AND SCHEMATIC
DIAGRAM
DIAGRAM AND SCHEMATIC
DIAGRAM
SCHEMATIC DAIGRAM OF
INTERMIDIATE SWITCH OF ONE
WAY ONE GANG
SCHEMATIC DAIGRAM OF
INTERMIDIAT SWITCH OF THREE
WAY THREE GANG
DIAGRAM\SCHEMATIC DIAGRAM OF
INTERMIDIATE SWITCH OF THREE WAY
THREE GANG
DAIGRAM OF INFRARED SENSOR.

INFRARED SENSOR
DAIGRAM OF INFRARED SENSOR.
SCHEMATC DAIGRAM OF INFRARED
DAIGRAM OF INFRARED SENSOR
ASSIGNMENT AND PROJECT EXECUTED

Designing using of
autocard
Scaling of drawing on site
Administration skill
CHALLENGES

 The challenges I had is transportation


from my place of work to where I stay

 Administration changes from the


main contractor and client
THANK YOU ALL...

You might also like