The biggest challenge was to design an efficient structural
system and easy to construct as the site was at remote location Efficient and economical steel structural system was decided After construction Tauktae cyclone appeared and structure remained intact. All detailed drawings were provided with all minute details
Indicative image only.
Underground circular water tank 2.5 lac liters capacity underground water tank was designed The design was done using limit state method along with all necessary checks. The design was also checked using 3D analysis in STAAD.
Indicative image only.
G+3 commercial building
G+3 commercial building was designed.
RCC frame building was designed using ETABS. Due to architectural requirement adopted footings were raft, eccentric and isolated. As the plan of building was not regular so earthquake from both direction was considered. Consultancy service for rehabilitation of hostel building We were appointed as the consultancy service for 20 year old hostel building. The building was designed before earthquake and the client initially wanted to demolish the whole building. However, after site visit and careful consideration it was decided not to demolish the building and go with repair options. Hence, we were able to save the huge sum of money.