R.SARAVANAN, PGET, L&T UAE 2 R.SARAVANAN, PGET, L&T UAE 3 Power in UAE..?
Production capacity – 18.74 GW. (lack in peak seasonal times)
Lack of natural gas
Gulf Cooperation Council – UAE, Kuwait, Qatar, Bahrain, Saudi Arabia & Oman GCC began region-wide power grid – demand
UAE has no spare power capacity
Phase 3 of GCC grid to southern system of UAE
In Dec’2009 $20 billion contract to Korean Electric Power – 4 nuclear reactors
1st reactor may 2017 – each reactor 1400 MW
R.SARAVANAN, PGET, L&T UAE 4
Electric power transmission..? The bulk transfer of electrical energy, from generating power plants to substations Power is usually transmitted through overhead power lines Underground power transmission has a significantly higher cost and greater operational limitations - urban & sensitive areas
Overhead Power lines..?
An electric power transmission line suspended by towers It is the lowest-cost method of transmission for large quantities of electric energy (most of insulation by air) The bare wire conductors on the line are generally made of aluminum R.SARAVANAN, PGET, L&T UAE 5 Transmission tower..? • Tall structure usually a Steel lattice tower, used to support an overhead power line • Electricity pylon – UK & parts of Europe • Ironman – Australia • Hydro tower in parts of Canada
R.SARAVANAN, PGET, L&T UAE 6
OWER TOWER ELECTRICAL LOAD DESIGN ANALYSIS & FOUNDATIO STUB CALCULATIO MENTRY TYPES CLEARANCES PARAMETER DESIGN N SETTING N
R.SARAVANAN, PGET, L&T UAE 7
TOWER GEOMENTRY
EXTENSIONS
BRACINGS
ANATOMY
R.SARAVANAN, PGET, L&T UAE 8
Adopted in firm Hybrid design Augered footing with cohesive soils Large uplift force are more than one bulb is Undercut on the pads to be resisted used to increase the Experience shows that SBC is low uplift capacity this type of footing 35m long under develop resistance to reamed to 2.5 times uplift 2 to 3 times that dia of shaft given footing without Clayey black cotton undercut soils & medium dense sandy soils
R.SARAVANAN, PGET, L&T UAE 9
In usa ,canada Suitable in areas with Special circumstances Steel corroded, rock out crop River crossing towers periodic excavation & Based on uplift, the & towers on maintanence anchor be single bar embankments Medium dry sand, clay or group of bars The raft at bottom or sandy caly soils (no welded to tower leg makes the foundation special precautions Vertical bars below substantially rigid to necessary) stub angle form cage minimize differential The steel is treated for footing settlement with one coat of Grouted to a depth of bituminous paint & about 50 times dia top coat of asphalt into the rock R.SARAVANAN, PGET, L&T UAE 10 Pyramid chimney type foundation Raft foundation R.SARAVANAN, PGET, L&T UAE 11 Stub-setting Important steps in tower erection The stubs are set with the help of stub setting templates Excavated pits are lean concreted to correct level Stubs are placed on lean concrete pad Alignment is carried by four plumb bobs hung from centre of the horizontal bracing If any pit over excavated by mistake, the extra depth should be filled by concreting After the stub is set, the heel distance of four faces of the tower and two diagonals should be checked R.SARAVANAN, PGET, L&T UAE 12 R.SARAVANAN, PGET, L&T UAE 13