Professional Documents
Culture Documents
School
SCHOOL MONITORING,
ADJUSTMENT AND EVALUATION
(SMEA)
2ND QUARTER
Access Quality • No of Learners with
• Enrollment • OVERAGE Failing Grades
• No. of Non-Readers
• Dropouts • SCHOOL AGE • No. of Non-Numerates
SCHOOL DASHBOARD
• PARDO • NO. OF
GRADUATES
Governance
• Liquidation of MOOE
• SBM Level of Practice
M F T M F T M F T LIQUIDATION OF MOOE WITH
SBM Level
CASH SIP,AI
5 0 5 26 18 44 0 0 0 ALLOCATIO UTILIZATIO LIQUIDATI of
Q
N
ADVANCE %
N
%
ON
% P
GRANTED Practice
&WFP
57,336.0 91.9 95.5
1 62,336.00
0 8%
54,780.00
4%
54,780.00 95.54%
Level
YES
2 68,630.00 O
0.00
%
0
0%
0
0% 1
e s s
c c ______________________
A TOTAL NUMBER
NO. OF TOTAL NUMBER OF TOTALOFNUMBER OF 49
GRADE ENROLLMENT OF DROPOUTS NO. OF PARDO NUMBER ENROLLMENT
ENROLLMENT
______________________ ENROLLMENT GRADUATES AND
LEVEL
GL MALE FEMALE TOTAL
(OVERAGE) (SCHOOL AGE) COMPLETERS
M F T M F T M F T
FEMAL
MALE TOTAL MALE FEMALE TOTAL MALE FEMALE TOTAL
E 31
K 4 4 8 0 0 0 0 0 0
K 0 0 0 4 4 8 0 0 0
1 2 0 2 0 0 0 0 0 0
1 0 0 0 2 0 2 0 0 0
2 5 8 13 0 0 0 0 0 0 18
2 3 0 3 2 8 10 0 0 0
13
33 7 11 80 0 1 0 60 0 1 0 70 0 0 0
8 8 7 8 7
44 4 11 50 0 1 0 30 0 1 0 40 44
0 5 0 4 5 33
6 6 0
5
5 3
03 6
0 0
0 0
30 0
3 0
60 0 202 10 1 10
6 0 0 0 6 1 7 K0 1 2 30 4 5 60TOTAL
6 6 1 7 0 0 0 0 0 0
TOTAL
T 31 5 18 0
49 0 5 0 26
0 0 18 0 44
0 0 0 0
e nt
s l i sh m
e s om p
c c c c
______________________
A
A i c a l
y s
______________________
Q u ______________________
FAILURES NON-READERS NON-READERS
STRUGGLING
NON-NUMERATES
LEARNERS
Grade 1-6 (ENGLISH) 4-6 (FILIPINO)4-6 3-6
4-6
Level
M F T M F T M F T M F T M F T
K 0 0 0
1 0 0 0
2 0 0 0
3 0 0 0 0 0 0
4 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0
5 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0
6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 0 0 0 0 0 0 0 0 0 2 0 2 0 0 0
e n t
l i sh m
l i ty o m p
ua c c
______________________
A
i c a l
Q • The school completed
Ph y s
Tranches Amount Received Funds Utilized
______________________
from SDO
Percent
Utilization
AMOUNT
LIQUIDATED
the implementation of the School Based Feeding
PERCENT
LIQUIDATION
1 62,336.00 57,336.00
• The school has SIP,
91.98% 54,780.00 95.54% 54,780.00 95.54%
Level 1
e e nt
a nc
i sh m
______________________pl
e rn
Go v
c c o m
a l A A
cHand Washing Facility was constructed through MOOE
s i
•yNew
______________________
Ph Fund
• Teachers was provided Schools/Office Supplies and
• ThePrinting
damaged Comfortforroom
Materials roofing was
the production repaired through the
of SLMs/LAS
helpthrough
of the stakeholders
MOOE 1st quarter Fund
• The DamagedGrass
• Procured School Signage
Cutter for thewas Repairedofthrough
Maintenance the help of
the School
Grounds
stakeholders through MOOE 1 st
quarter Fund
• The school Continue the improvement of Gulayan sa Paaralan
that serves as another source of the school
FINDINGS/ISSUES/CHALLENGES
FINDINGS/ISSUES/CHALLENGES &&PROPOSED
PROPOSED
INTERVENTIONS
______________________
INTERVENTIONS
• Incomplete/ unavailability of some SLMs/LAS provided
______________________
by the SDO
Teachers Printed SLMs and LAS provided with the printing
materials through MOOE Fund to compete the distribution of LAS
and meet the needs of the Learners along distance learning.
______________________
• Construction of New Comfort Room
To be implemented on the 3rd quarter (POW approved)
• Repair of the Temporary Learning Space TLS to be utilized by
the Grade 2 Learners
To be implemented on the 3rd Quarter
• Minor Repair of the damaged ceiling of Grade 1 Classroom
To be implemented on the 3rd Quarter (POW approved)
______________________
______________________
______________________
______________________
______________________
______________________