You are on page 1of 38

The Project on

Building Administration and


Enforcement Capacity
Development
for Seismic Resilience

17 November 2009

KAMEMURA YUKIYASU
JICA Expert
 We focus on non-engineered houses built by
common people in our project.
 We want to improve the quality of non-

engineered houses in terms of seismic


resilience.

We use IMB system for the improvement of


non-engineered houses
Why does IMB system is useful to improve the quality
of non-engineered houses?

1.Through the IMB system, government can enforce


people to make correct/adequate drawing for the
construction of non-engineered houses.

2.If correct/adequate information for non-engineered


houses is input to the construction site, correct/adequate
construction method can be carried out/implemented by
worker.
How do we intend to improve existing IMB system?

1. To arrange the regulations from the view points below.


1) Submitting documents for non-engineered houses.
2) How to check those submitted documents in terms of technical matters.
2. To support the people who submit IMB application document by means of Prototype
drawing.
3. To enhance the building administration system by means of installing MIS system.

Regulation review MIS system Field survey for


introduction/installation construction method
1) PERDA review
2) Implementing regulations 1) IMB procedure review 1) Technical problem finding
for IMB system review 2) Facility survey for MIS from the result of survey
3) Probability to install system 2) To facilitate building
checking system 3) Manpower survey for the administration with key
4) Probability to install probability of requirement
prototype drawing implementation
5) Simulation training 4) Simulation training
6) To propose the improving
regulations.
Location of Priority Target Kota

MANA
DO
BITUNG
TOMOHON
Organization for project activities

PUCK JICA
Making Peraturan Menteri
Regulation regulated Regulation regulated by Regulation regulated Proposing
by other institute PU as authorised by PU as reference IMB system
PP36/2005 on institute IMB(PERMEN 24/2007)
PERMEN 25/2007(SLF) TABG(PERMEN 26/2007)
building
30/PRT/M/2006
president decree for the (TECHNICAL GUIDELINE) etc
Managing
ownership of building
Technical guideline for non-
Key Requirement
engineered house meeting

Dissemination by seminor and other method


Supporting Perda
drafting/reviewing
Local government (Kabupaten/Kota)
Perda making/revising Proposing IMB
implementation
The regulations making/revising for IMB system
implementation for non-engineered houses
safer

IMB Implementation 1. Checking system


2. Prototype drawing
Understanding of Building Law
IMB system was implemented based on Building law (UU28/2002)(PP36/2005)
1) Central government should give further provisions for requirements. And local
government should implement.
2) UU28/2002 and PP36/2005 should be followed by people.
3) We tried to prepare the model Perda.

The objectives of Building Law


- Safety (of each building by technical requirement)
- Orderly development (now and future) (To monitor in accordance with spatial plan)
Local government should decide implementation rule for building based on
UU28/2002 and PP36/2005.
Contents of PERDA proposal
1. To issue IMB by head of local government
1-1. Checking method is determined by other guideline, and submitting IMB application
document should be stipulated clearly
1-2. To determine the style of IMB
1-3. To stipulate the obligation that building owner should submit IMB application document
If the function of building was changed.
1-4. To stipulate data recording system.
1-5. To stipulate the obligation that spatial section should provide latest land use plan to
applicant.
1-6. To stipulate the usage of experts

2. Including the implementation of SLF system


 
3. To stipulate that IMB includes treatment/repair/replacement.
 
4. Including community role

5. Including the procedure to issue demolition letter .


 
6. To stipulate monitoring implementation procedure such as the authority of
staff at local government and so on
Data

Proposed IMB system management will


be done by Kab.
staff

Kabupaten
Providing information such as
land use plan

Providing information
such as land use plan
Computerized
instruction

data
To give information

management
directly from Kab.

Regarding the checking of system


non-engineered house,
4/19/22
Kecamatan staff do.
Kecamatan

Data input will be


To give information

done by Kec.
Endorsement letter

staff
instruction

Endorseme
nt letter

Supporting
Pemohon
13
For IMB checking system
New assignment /improved assignment
Kecamatan staff check application document by check list
Utilization
of
prototype
drawing
Checking items should be
on IMB application Training for Check list
document. checking should be
(Regulations should be established should be established
that enforce people to submit IMB
conducted based on “Key
application document which
include the information regarding (Simulation on site) requirement”
checking items)

Implementation with transparency


Scenes of MIS training
Kota Tomohon
Management Information System(MIS) Software
Building Permit Form
Basic Scheme for
IMB Application Procedure
 Applicant prepare the required
Kabupaten documents and submit them to
Kecamatan.
Reporting
 Kecamatan stores a copy of
required documents and IMB
certificate.
Kecamatan  Kecamatan issues IMB certificate
to the applicant with a set of copy
Submission Store
IMB of the submitted application.
Issuance
 Kecamatan is supposed to report
the status of IMB process to
Kabupaten.

Applicant
Test Operation of MIS Software

22
Video Presentation

23
Practices in West Sumatera
Earthquake Reconstruction
Collapsed building in Padang
Collapsed building in Padang
There are no column and beam
This brick house was collapsed
This brick house was collapsed
This house was totally collapsed
Wall brick were fallen
All houses were collapsed along this street
Reconstruction already started
Model House in Sematera Barat
Assistance from JICA in Kab. Padang Pariaman
JICA’s assistance
Institution of IMB Processing
1. Capacity enhancement for IMB processing in Kecamatan. To propose enhanced IMB system
Processing method using check list To train staff of IMB processing
2. Facilitator supporting applicants in terms of making IMB
application documents
3. To make database system for IMB as MIS system To train facilitator for making IMB
4. To release IMB certificate application document

To provide MIS system and train


staff
Data of applicants for subsidy and IMB should be hold commonly.
To develop the relation between two
database
Institution of subsidy
1. To make application form for subsidy applying
2. To utilize facilitators for helping to make subsidy To provide database system for
application document subsidy
3. To make database system for subsidy
4. To utilize facilitators to monitor /instruct work execution To train facilitator for construction
5. To release subsidy to applicants monitoring
6. To socialize people in terms of correct method of non-
engineered house’s work execution To provide training to people as
trial/pilot
TERIMA KASIH