Job Safety Analysis (JSA)
Activity Hazard Preventive Measure
Scaffold Erection Bad foundation, TBM before work, Inspection of materials before work
Drainage, material falling, Compacted ground before erection, Work area to be barricaded
unknown purpose for Material used for work on height should be tie off to prevent from falling
erection of scaffold Purpose of erecting scaffold should be known, Kind of work to be done on
scaffold erection, Complete PPE must be worn e.g. hand gloves, safety glass,
safety shoes, hardhat, Body harness

Lifting of Scaffold Injury to personnel, TBM before work regarding handling of materials
material from height Use of gin wheel to hoist material or mechanical equipment
Barricading of lifting area

Dismantling of Falling of scaffold material, TBM regarding responsibility during dismantling,


collapsing of scaffold. Only experience, trained and authorized person can dismantle scaffold
Scaffold
Fall of personnel, Material shall be lowered using rope and bucket or by passing manually
Damage to scaffold Area must be barricaded to keep away all unauthorized persons from the area
material

Erection of Fall of personnel from TBM before start of the job, 100% tie off, using harness with 2 lanyards,
height, Secure all materials for all work at height when there is a rain or wet surface,
suspended
falling of material, Experience scaffolders shall be utilized to erect and dismantle suspended
scaffold Slippery surface, scaffold. Other fall protection equipment shall be utilized e.g. Retractable
Inexperience scaffolder lanyard, Lifeline.
3
Risk Assessment Matrix

21
Risk Assessment - Sample
Risk
Risk After Person
Before
By Control affected
Activities Hazards Control Precautions
whom (to be
S L R S L R informed)
F F F F
Competence Only trained and competent personnel to Foreman
Scaffolder /
Level 3 C C3 utilized for the task. All scaffolds to be 1 B B1
Foreman
certified prior to use
Manual Sufficient personnel, “No Bombing” Foreman
1 C C1 1 B B1 Scaffolders
Handling

Scaffold Fall from Scaffolders working above 1.8m must be Foreman/


3 D D3 3 B B3 Scaffolders
Erection / Height 100% tie off. Hand rails to be fitted Scaffolders
Dismantling Collapse of Check ground condition. Use base plate Foreman
4 B B4 2 B B2 Scaffolders
Scaffold & sole plate. Use proper materials
Falls of Barricade area during erection & Foreman Scaffolders /
3 E E3 1 B B1
Materials Dismantling All
Adverse Check scaffolds after adverse weather Foreman
2 C C2 2 B B2 All
weather condition