Professional Documents
Culture Documents
P RO P O R T I O NS
WORKSHEET
LEVEL-1
Q1. FILL IN THE BLANKS:
(i) When one quantity increases and other decreases then the two quantities are said to
be in __________ proportion.
(ii) If two quantities x and y are in direct proportion, then _________ remains constant.
(iii) If 7 toys cost rs.35, then cost of 9 toys is ___________.
(iv) If 14 pipes are required to fill a tank in 40 minutes, then it will take__________
minutes if only 7 pipes are used.
(v) If 45 students consume the given food in 60 days, then the same food will last for
_______ days for 36 students.
LEVEL-1
Q1. FILL IN THE BLANKS:
(i) When one quantity increases and other decreases then the two quantities are
said to be in inverse proportion.
(ii) If two quantities x and y are in direct proportion, then ratio remains constant.
(iii) If 7 toys cost Rs 35, then cost of 9 toys is Rs 45.
(iv) If 14 pipes are required to fill a tank in 40 minutes, then it will take 80 minutes
if only 7 pipes are used.
(v) If 45 students consume the given food in 60 days, then the same food will last
for 75 days for 36 students.
Q2. ANSWER THE FOLLOWING QUESTIONS:
(i) The cost of two dozen of oranges is Rs 48. What is the cost of 110 oranges?
Rs 220
(ii) Rajni drives at 56km/hr and completes a journey in four hours. If she drives at
64km/hr, then, the same journey will be completed in how many hours?
3.5 hours
(iii) 10 computer operators can compose120 pages in two hours. How many
operators should work, if the job is to be completed in 30 minutes?
40 operators
LEVEL-2
Q3. A car can cover a distance of 210 km in 5 hours. Calculate the time taken for covering the distance of 546
km with the same speed. Distance covered 210 546
Time Taken 5
Q6. Swaraj runs at a speed of 35km/hr. And completes a race in 16 minutes. If Rajan’s speed is 32km/hr. In
how much time will he complete SPEED
the race? 35 32
TIME TAKEN 16
Q8. A messenger takes letters on foot from village A to village B at a speed of 4 km/hr. If he walks at a speed
of 5 km/hr, then he reaches the destination 7 minutes faster. Find the distance between two villages.
Q9. Twenty-four people can construct a temporary auditorium in 15 days. But the contractor would like to
finish the work in 12 days. How many more workers should he employ?
TO BE DONE AS ASSIGNMENT
QUESTION BANK
Q1. If 14 workers can build a wall in 45 hours, how many workers will be required to do the same work
in 35 hours?
No. of workers 14
Time taken 45 35
No of students 75 75-15 = 60
No of days 24
Cloth
(in metres) 2 4 5 10 13
Cost
(in Rs) --- --- 210 --- ---