Course Description
CENG 6101- Project Management [3]
Duties and responsibilities of main parties in Civil engineering;
Initial project planning: pre-feasibility and feasibility studies;
Selection and contractual agreement with consultant; Selection
and contractual agreement with contractor; Construction
contract types; Contract document; Sub-contracting; Bidding
process; Variation; Claims; Arbitration; Insurance in construction
industry; Health and safety at work; Professional ethics in Civil
engineering; Case studies on selected topics. Preparation and
CENG 6101- Project Management
Course Outline
1.Introduction to Project Management
2.Definitions of Key Terms
a. Projects
b. Management
c. Project Management
3.The Project Life Cycle
a.Initial project planning: pre-feasibility and feasibility
studies;
4.Parties in a Construction Contract
CENG 6101- Project Management
Course Outline
5.Contracts: Basic Concept
a. Formation of Contracts
b. Variation of Contracts
c. Termination of Contracts
d. Risk as a basis for Construction Contract Formation in Construction
e. Risk and Construction Contracts
CENG 6101- Project Management
Course Outline
6. Construction Contract Documents
a. Legal Section
i. General Conditions
ii. Particular (Special) Conditions
iii. Forms
b. Technical Section
i. Drawings
ii. Specifications
iii. Bills of Quantities (BoQ)
iv. Addenda
CENG 6101- Project Management
Course Outline
7. Construction Contract types
a.Design, Bid, Build (DBB) Traditional Form of Contract
b.Design Build
c.Design Build Operate
d.Public Private Partnership (PPP) form of Contract
e.Construction Management (CM)
a. CM at Risk
CENG 6101- Project Management
Course Outline
8. Standard Forms of Contract
– The PPA Form of Contract
– The FIDIC Suite of Contracts
– The NEC form of Contract
– The AIA Form of Contract
• Subcontract and Consultancy Contracts
9. Duties and responsibilities of Contracting Parties
– In the PPA Form of Contract
– In the FIDIC Form of Contract
CENG 6101- Project Management
Course Outline
10. Procurement in Construction
CENG 6101- Project Management
Course Outline (Contd.. )
• 11. Contract Administration of Construction Projects
– a. Contract Administration General Principles
– b. Site Procedures Manual
» Progress Meetings
– c. Office Engineering
» Submittals
– d. Contract and Quality Assurance and Control
– e. Handling variations and Claims
CENG 6101- Project Management
Course Outline (Contd.. )
– F. Disputes and Their resolution in Construction Contracts
– g. Insurance in construction industry;
– h. Health and safety at work;
– i. Professional Ethics in Civil engineering;