MEXICO, PAMPANGA

MUNICIPAL
ROADMAP
2022 June 30 VIOLINNA KAYE L. LAGMAN PLAN 423
STUDY AREA: LACK OF WASTE AWARENESS
AND DEVELOPMENT NECESSITY OF SOLID
WASTE MANAGEMENT SYSTEM

POPULATION: 173,403 (2021 CENSUS) (2.44 %


GROWTH RATE)
BARANGAYS: 43

• Mexico used to have an open dumpsite which was


rehabilitated and now is closed.
• availability of only one MRF in a municipality with
almost two hundred thousand residents
• only four (4) garbage trucks are present

PLAN 423
STUDY AREA: LACK OF WASTE AWARENESS AND DEVELOPMENT
NECESSITY OF SOLID WASTE MANAGEMENT SYSYTEM • The rampant and indiscriminate throwing
of municipal and domestic wastes in the
surroundings natural waters and drainage
systems has resulted to dire consequences
in the environment, health and even in
economy.

• This situation poses a threat to both


environment and human lives, since
garbage of this amount does not only
destroy the river ecosystem; it also blocks
the regular river pathways, augmenting
Figure 3.2.12. Upstream Wastes Blocking the Abacan River the possibility of flooding during heavy
rains.

PLAN 423
STUDY AREA: LACK OF WASTE AWARENESS AND DEVELOPMENT
NECESSITY OF SOLID WASTE MANAGEMENT SYSYTEM

• ROOT CAUSE:
• Lack of awareness of local people on proper
LACK OF LACK OF
wastes management and disposal. AWARENESS FACILITIES
• No available dumpsite nor landfill
• Only one (1) available MRF for the whole
municipality LACK OF
MATERIALS/MEANS
• limited no. of garbage trucks

PLAN 423
POSSIBLE
SOLUTIONS • Provide additional garbage • Established an intensive
truck for waste collection program regarding waste
awareness and proper disposal

• Conduct intensive and • Construction of Material


regular monitoring of waste Recovery Facilities (MRF) at
disposal for the cleanliness barangay levels, in order to strictly
and beautification of each control improper waste disposal.
barangays

PLAN 423
BUDGETARY
COSTINGATLEAST HALF OF THE TOTAL NOS. OF BRGYS.
MUST HAVE A MINI GARBAGE TRUCK = 21 brgys.
.PRESENT GARBAGE TRUCKS = 6

TOTAL NEEDS = 15 trucks x 330,000 NOTE: Isuzu Brand New Euro 5 Mini Dumptruck = 330,000.00
TOTAL COST (GARBAGE TRUCKS) = 4, 950, 000.00

• The construction of stationary MRF costs about P50,000 each while the price of the trailer-type has an estimated amount of more or less P85,000 each.

- based from the previous MRF project of Naga City

PRESENT NOS. OF BRGYS. W/ MRF = 1 BRGY.


TOTAL NOS. OF BRGYS FOR THE
PROPOSED BRGY. LEVEL MRF = 42 BRGYS.
TOTAL NEEDS = 42 brgys x 50,000 (based form previous mrf proj. of NAGA CITY)
TOTAL COST (BRGY. LEVEL MRF)= 2, 100, 000.00

TOTAL COST = 4, 950, 000.00 + 2, 100, 000.00


TOTAL COST = 7, 050, 000.00

https://naga.gov.ph/news/4-mobile-garbage-facilities-distributed-to-the-barangays-to-better-city-waste-
segregation/
PLAN 423
CONCLUSION

PLAN 423
Urban planning shapes our economy, stability
and quality of life. Proper planning must be
executed since environment is correlated with
people. People will suffer the most if not
properly designed. Our transportation system,
infrastructure, the layout, and prescribed
densities of our residential, commercial, and
industrial areas, and more are all influenced by
urban planning. If this is not properly designed
and considered, domino effect will follow thus
affecting everyone's lives.