1-Project Introduction

The purpose of this presentation is to demonstrate ENERVO


Group’s capabilities by describing the project execution plan
and methodology for the main works package of FALCON
ISLAND FEVELOPMENT- iNFRA-STRUCTU, and to highlight
the capacity of Enervo Group of providing excellent and
reliable execution of works to meet the project goals within the
agreed time and budget.

This presentation thoroughly explains the stages of


mobilization and handover, from start to finish, using a
methodical and logically accurate approach, while maintaining
the highest possible quality and safety requirements.

The Technical Proposal is based on the drawings,


specifications and other information/details received during
the tender stage.

FALCON ISLAND VILLAS DEVELOPMENT – INFRASTRUCTURE


02- Project Stakeholders

Employer: Al Hamra Real-estate Devept. L.L.C

Consultant: JT + Partners

Main Contractor: TBA

FALCON ISLAND VILLAS DEVELOPMENT – INFRASTRUCTURE


03-Project Location, Condition and Existing Photos .
The project located in plots (north & south) on Falcon island at
Ras Al Khaimah Emirate with total plot area of 222,872 SQM.
within the context of communal areas in RAK City.
The field work completed on 22nd March 2022, one hundred
forty-four (144) boreholes have been drilled up to the depths
between 8m to 30m from the EGL, ground water was
encountered between 3.40m to 3.95m depth below the EGL.

FALCON ISLAND VILLAS DEVELOPMENT – INFRASTRUCTURE


AL YASMINA SCHOOL PHASE 2
04-Project Components Item Area/m2 No. of
Units
2 Bedroom 139 218
Townhouse (mid
TOTAL = 30,302 m2 By Others

To
unit)

il
et
&
3 Bedroom 184 128

Ch 1
Semidetached (end

om

an
0
TOTAL = 23,552 m2 By Others

g
unit)

02 ge Ro

eR
oo
an

m
Ch 2 Bedroom 132 14
Semidetached
TOTAL = 1,848 m2 By Others
&
let
Toi

3 Bedroom 184 52
Semidetached
TOTAL = 9,568 m2 By Others

4 Bedroom 238 8
Semidetached
TOTAL = 1,904 m2 By Others

4 Bedroom Villas 365 51


TOTAL = 18,615 m2 By Others

5 Bedroom Villas 505 27


TOTAL = 13,635 m2 By Others

Club House 367 1

E
US
TOTAL = 367 m2 By Others

HO
UB
Toilet & Change 104 6

CL
Room 1
TOTAL = 624 m2 By Others

Toilet & Change 55 1


Room 2
TOTAL = 55 m2 By Others

TOTAL AREA 100,470 m2 By Others

Soft & Hard Landscaping


EXTERNAL Contracto
Toilet & Change Room
WORKS Swimming Pools r Scope
01 Infrastructure Works Of Work
Ancillary Buildings
05-Scope of Works
The scope of work is consisting of Execution, Construction, Completion for Main Works of AL YASMINA BROOK SCHOOL EXPANSION -
PHASE 2 contains the following Buildings: (Innovation Cluster(G+1), Primary Cluster(G+1), secondary Cluster(G+1), Admin and Performance
Art Building (G+1), Sports Facility(G+1), Guard Houses (3 nos.) and Chiller plant, Landscape Work , Parking Areas , Outdoor Playgrounds and
swimming Pools .

At Phase 1 Scope of work will include: demolishing of the Existing Road , Swimming pool and Multipurpose Building .

Execution, Construction, Completion for the Main


Works

 Excavation Works
 Architectural Works
 Structural Works
 Interior Design Work
 MEP Services
 Roads & Infra Works
 External & Landscape Works
 Outdoor Playgrounds And Swimming Pools