You are on page 1of 10

MTN Afghanistan
QoS in Salang District of Parwan
19-Sep-2023

Summary

The drive test has been performed for Salang provincial office to identify the main issue

 Provincial office which is located right at the bottom of the mountain and the site location is on top of the mountain
which is totally not visible from the area

 Mechanical tilt adjuster clamp is not installed in GSM it requires to be install.

 Improvement observed in 2G RX level due to swap sectors between 1 & 2 now its cleared. snaps are for pre and
post

 Slightly improvement observed in RSCP as much as possibilities after electrical tilt modification (WPN0382) from 4
to 6 degrees

Recommendations:

 Mechanical tilt adjuster clamp is required. For trial if get any positive result for now



Views from site to provincial office

Provincial office located right behind this bellows which is not visible

This picture is taken from behind the GSM antenna over the tower

Provincial office

Site is located behind this peak of the mountain

Provincial office which is located right at the bottom of the mountain and the site location is on top of the mountain which is totally not visible from the area

Mechanical tilt adjuster clamp of GSM

Mechanical tilt adjuster clamp is not installed in GSM it requires to be install.


RX level pre & post

Pre Post

Improvement observed in 2G RX level due to swap sectors between 1 & 2 now its cleared. snaps are for pre and post

RSCP pre & post
Pre Post

Slightly improvement observed in RSCP as much as possibilities after electrical tilt modification (WPN0382) from 4 to 6 degrees

Google Map of the area

Distance between the site and provincial office

Provincial office is in deep bottom parallel to the mountain with 500m far from the site

Thank You