Travelling blocks

pulled into crown


block
Threat
Crown-o-matic protection Drilling crew awareness of
Experience of driller
system potentially hazardous situation

Crown-o-matic
system inoperable
Escalation Factor
Daily functional test of
crown-o-matic system by
driller

Insufficient
experience for role
Escalation Factor
Competency of driller

Failure to
communicate to
driller
Escalation Factor
Formal safety induction for all
crew members Multiple rig area
fatalities from
H-06.03 Heavy dropped object
objects/equipment
overhead Consequence
Evacuation of rig floor area Emergency response plan
Dropped load from
crane
Threat
All lifting equipment certified
Regular visual inspection of Correct attachment of slings Safety margin between design
and marked prior to Qing22
cables and slings to load and actual use capacity Loc: Wellsite Failure to implement
operations
Event: Dropped plan correctly
Objects
Escalation Factor
Suitable and sufficient training
Slings incorrectly in emergency plan
attached
Escalation Factor
Spot checks by supervisors Inexperience of
personnel in
recognising failure
Escalation Factor
Driller will call for evacuation
Rating of equipment
not observed
Escalation Factor
Clear markings of lifting
capacity and load weight

Uncertified
equipment brought
on site
Escalation Factor
Use of marked lifting gear
only

Auxiliary equipment
falling from mast or
other structures
Threat
Inspection of mast and all Drill line and anchor
Hoisting equipment inspected
attachments inspection

Drilling line failure

Escalation Factor
Drilling line and anchor points
inspected as part of weekly
rig audit & ton mile program