SANT LONGOWAL INSTITUTE OF

ENGINEERING &TECHNOLOGY
A
REPORT
ON
INDUSTRIAL TRANING AT.

NNT DEVELOPER PVT.LTD.


PERIOD OF TRANING-03/07/2023
SUBMITTED TO-
PAVITAR SIR

SUBMITTED BY-

NAME-CHANCHAL KUMAR
REG NO-2110924
TRADE-CBM
ABOUT COMPANY

 NNT DEVELOPER PVT.LTD.IS COMMERCIAL CONSTRUCTION


MANAGEMENT COMPANY
LOCATION-SRI RAM TOWER ,KANKARBAGH,PATNA-20

 ABOUT PROJECT
PROJECT-THE CONSTRUCTION OF SADAR HOSPITAL
MADHUPURA
COST OF PROJECT-25000000
CONTENT
1) SAFTEY………………
2) COMPRESSIVE TEST OF CUBE………….
3) SLUMP TEST…………
1. SAFTEY
I. PROVIDE CLEAR INSTRUCTION
II. ORGANISE AND TOOL STORE PROPERLY
III. USE THE RIGHT EQUIPMENT FOR RIGHT
TASK
IV. SETUP SAFTEY GUARD
V. REPORT ISSUES IMMEDITELY
VI. KEEP PRESONAL POTECTIVE
EQUIPMENT(PPE)
VII. FOLLOW ENVIRONMENTAL GUIDELINE
COMPRESSIVE TEST OF CUBE

 REASON FOR  PROCEDURE……..


DOING…… o PREPARE CONCRETE MIX
o PLACE THE CONCRETE IN STEEL CUBE
-THE PURPOSE OF A MOULD (15*15*15)FOR CASTING
CONCRETE CUBE TEST IS
o FILLING IS DONE IN THREE LAYER AND 25
TO ENSURE THAT THE
TAMPING EACH LAYER
CONCRETE MEETS ITS
EXPECTED COMPRESSIVE
o AFTER 24 HOURS CONCRETE REMOVE
FROM CUBE MOULD
STENGTH
o THE SPECIMEN MUST BE KEEP IN WATER
OF 7 DAYSOR 28DAYS AND FOR EVERY 7
o WEIGHT OF SAMPLE IS NOTED
o PLACE THE SAMPLE ON
COMPRESSIVE TESTING MACHINE
o ENSURE THAT CONCRETE
SPECIMEN MUST BE WELL
DRIED BEFORE PLACING IN
COMPRESSIVE TESTING MACHINE
o LOAD IS APPLIED GRADUALLY
UNTIL SPECIMUM FAILUAR
o TO CALCULATE COMPRESSIVE
LOAD WE USE
COMPRESSIVE LOAD =TOTAL LOAD/TOTAL AREA
SLUMP TEST
 PROCEDURE……..
 WHY WE WILL DONE o CLEAN THE INTERNAL SURFACE OF MOULD AND APPLY OIL
o PLACE THE MOULD ON SMOOTH HORIZONAL AND NON- POROUS
SLUMP TEST……. BASE PLATE
o FILL THE MOULD WITH PREPARE CONCRETE MIX IN
-THIS TEST IS DONE TO CHECK APPROXIMATELY 4 LAYER
THE WORKABILITY ,SEGERATION o TAMP EACH LAYER OF 25 STROKES OF THE ROUND END OF
TAMPING ROD IN A UNIFORM MANNER
(SEPERATION OF CONCRETE
o REMOVE THE EXCESS CONCRETE AND THE SURFACE WITH
AGGREGATE)OF CONCRETE TROUBLE
o CLEAN ANY THE MORTAR AND WATER LEAK OUT BETWWEEN THE
MOULD AND BASE PLATE
o RAISE THE MOULD OF CONCRETE IMMIDATELY AND SLOWELY IN
VERTICAL DIRECTION
o MEASURE THE SLUMP AS A DIFFRANCE BETWEEN THE HEIGHT OF
THE MOULD AND THAT OF THE HEIGHT POINT OF THE SPECIMUM
WILL TESTED
RESULT……
o SLUMP TEST FOR THE
SAMPLE =____MM
o NOTE-ACCORDING TO IS
456:2000 THE SLUMP
VALUE(IN MM ) OF THE
CONCRETE USED IN
ORDINARY RCC WORK FOR
BEAM AND SLAB ETC. IS 50
TO 100 MM
THANK
YOU