EMBANKMENT SETTLEMENT
PROBLEMS
Lesson 6 - Topic 2
Site Exploration
Basic Soil
Properties
Laboratory Testing
Slope Stability
Embankment Soil
Settlement Profile
Settlement
Time – Rate
Spread Footing Surcharge
Design Vertical Drains
Pile Design
Construction
Aspects
Apple Freeway Design Problem
East Approach Embankment Settlement
Fill
2:1 = 130 pcf
= 40 0 30'
c=0
30
40
Po 2460
x x
3600
P F
x
5800
Apple Freeway Design Problem
East Approach Embankment Settlement
Total Settlement
12.66" (max. H)
15
Apple Freeway Design Problem
East Approach Embankment Surcharge
Assume:
10’ high compacted surcharge ( = 130 pcf)
P of emb. (PF) + surch. (Ps) = 5200 psf
Apple Freeway Design Problem
East Approach Embankment Surcharge
Time - Settlement Plot
180
Days
2:1
33' Fill
10' 7' Sand
25' 35' Clay
Dense
Gravel
30' Fill
10
12.66"
30' Fill w/Drains 30' Fill + 10' Surcharge
15
t
Treatment 90 (mo.) Extra Cost
Fill only 14 -
Fill w/10' surcharge 6 $120,000
fill w/ wick drain 2 $172,000
Apple Freeway Problem
East Approach Embankment Settlement
Lateral Squeeze of Clay
Remember: Fill
x H >Fill3 x Cohesion
3900 psf > 3300 psf
-> Can get lateral squeeze of clay
"Rule of Thumb"
Surcharge
Fill
Without
Settlement
Surcharge Clay
With Surcharge
Clay
Vertical Drains
Surcharge
Settlement Platform
Drainage Blanket
Permanent Fill
Soft Clay
Vertical
Drain
Firm Soil