RSEC/OM 1
Integrated DE Controls (Sensorless) vs Wall-Mounted Drives
Wall Mounted Drives Integrated Controls
Cost of Sensor, Installation, wiring costs can go upto $2,000! Sensorless Capability requires no special installation or wiring
saving on First Installed Costs
Remote
Sensor
Usually, generic drives are used for wall mounting Pump Specific controls & Functions are provided on the Design
Envelope Controls
Additional power wiring from VFD to motor is required. No Additional power wiring is required as the controls are integrated
with the pumping unit.
Wall Mount
VFD Additional AC line reactors are required on the power line Built-In DC line reactors removes requirement of AC line reactors.
Wall-mounted drives often do not include RFI filters and must In built RFI filters in compliance to low emission and immunity
be provided as an extra requirements EN6800-3 to the 1st Environment Class C1
When distance between VFD & Motor is lengthy, long No risk due to long standing wave since controls are mounted on the
standing wave can form which increases voltage at motor motor.
terminals causing motor pre-mature failure.
It is often not possible to mount wall drives in the optimum Minimized risk of reflected wave voltage since controls are mounted
location and wiring costs and reflected wave voltage are on the motor.
increased due to longer distances.
Do not have Energy metering capabilities Design Envelope pumps incorporate the ability to record and
cumulate pumping unit energy consumption.
Requires wall space Using Design Envelope pumps with integrated controls means
valuable wall real estate is not used. Equipment can be positioned
closer to the mechanical room perimeter because the walls are kept
clear.
RSEC/OM 2
DE advantages (Sensorless)
Flow meter
Energy meter
RSEC/OM 3
An integrated approach to reducing system cost
Parallel Sensorless Pump Control – staging methodology
1P EFFY 2P EFFY 3P EFFY 100%
80%
EFFICIENCY
POWER
HEAD
60%
40%
Armstrong
Best Efficiency 20%
Up to 30% energy
Staging
0%
savings
FLOW
1P EFFY 2P EFFY 3P EFFY 100%
80%
EFFICIENCY
POWER
HEAD
60%
40%
RSEC/OM FLOW
Design Envelope 4200H vs Conventional Maintenance (Seal replacement)
Frame assembly
VS
Seal Change 3-4 Hours
Seal Change < 1/2 Hour.
1. Remove coupling guards 1. Remove coupling guards
2. Separate the couplings 2. Remove split coupling
3. Unbolt motor 3. Replace seal (outside balanced)
4. Back pull-out motor 4. Re-install coupling & guards
5. Access seal
6. Align motor on base plate and re bolt.
7. Assemble the coupling The outside balance Mechanical seal similar to the
8. Re-align before tightening. Vertical Inline pumps reduces the maintenance time
9. Use Shins (metal plates) if required for aligning. & thus labour costs.
RSEC/OM 5
Ease of Maintenance; End-Suction vs Armstrong 4200H
Armstrong VIL pumps reduce seal change time of over 3-4 hours typical to under half an hour.
Conventional End-Suction pumps require piping disconnection, lifting equipment and extra labor.
Armstrong 4200H End Suction pump’s mechanical seal can be accessed without disturbing the piping or the motor.
1. Remove the Coupling Guard 2. Unbolt & remove Rigid coupling 3. Remove Seal plate 4. Access Seal
RSEC/OM 6
Conventional End Suction vs Design Envelope 4200H
Components Eliminated Using 4200H pumps with Suction Guide & Flo-trex Valves:-
1. Y Strainer 4. Discharge check valve
2. Suction long radius elbow 5. Discharge globe valve
6. Suction spool piece
RSEC/OM 7
Active Performance Management
RSEC/OM 8
Smart Start-up
Inclusions
• 1-year Pump Manager subscription
• 1-year extended warranty
• Multipoint Check of overall pump operation
• Activation of performance bundles
• Firmware updates
• 7-day comprehensive start-up report
RSEC/OM 9
Smart Commissioning
Features
OEM – CERTIFIED
• Factory approved procedure performed by Armstrong SMART Commissioning
certified technicians.
• Leverages the analytics from SMART Start-up
• Ensures system optimization
• Strategies and BAS integration.
• Emphasizes on building readiness pre-handover
• Eliminate the risks of the pump drift
Inclusions
• Access to pump operation analytics to assist in further
commissioning.
• Multi-point check of overall pump operation
• 7-day comprehensive commissioning report
• Operator handover training, including Pump Manager
refresher 10
RSEC/OM
Site Pictures of Installations
RSEC/OM 11
Site Pictures of Installations
RSEC/OM 12
Site Pictures of Installations
RSEC/OM 13