Wood Technology, TU Graz / Austria Case study no. 10
Leonardo da Vinci project
no. CZ/06/B/F/PP-168007
WP6 – Case Studies
PC 3 – A set of case studies General Information Type of building: Laboratory (hall) and office building Structural System: Suspended CLT-elements, ripped CLT-plates, walls with boxed cross sections Owner: Federal Building Agency (BIG), Vienna / Austria Location: Graz / Austria Erection date: 1999 (begin) - 2001 (1st erection step finished) Architectural design: Arch. Nussmüller / , Graz / Austria Arch. Kampits & Gamerith, Graz / Austria Structural & constructional design, Building physics: Institutes of the Faculty for Civil Engineering, Graz University of Technology Manufacturer of timber structure: Stingl GesmbH, Trofaiach / Austria Plans (Erection step 1) Plan (with Laboratory hall dimensions)
Offices Cross section
Laboratory hall
Office Walls
→ Boxed cross-section utilising cross-laminated
element (CLT) rigidly glued with glulam rips
Roof above laboratory hall
→ 5-layered CLT-plate (120 mm) suspended
by steel trestles (tubes) and steel rods; span: 19,48 m Roof above offices
→ 5-layered CLT-element screw-pressed glued
with glulam rips (GL32h, 140/280 mm, every 600 mm) → Width per element 2400 mm → Span: 14,0 m Simple connection of the prefabricated elements with steel angles at the bottom and the first floor on the reinforced concrete structure Detail: Walls
Special fastener system (steel ring and
glued-in rods) at the longitudinal edges of the prefabricated elements Detail: Roof above laboratory hall
Steel trestles (tubes) for the
Steel part for load introduction suspending system of the CLT- of steel rods into the CLT- plate elements
Detail of the steel trestles: drilled
Joint of the CLT- plate (necessary holes for the anchoring of the due to limited production length) suspension rods Detail: Roof above offices
Joint rips – wall: by means of
slotted- in steel plate with dowels
Bearing area of the
roof above offices: bearing on reinforced concrete Joint deck (CLT) – wall: walls by means of by means of bearing of on the slotted-in steel CLT-element of the wall and plates and special selftapping screws elastomeric layers Assembling / Erection Offices
→ High level of pre-
fabrication for wall and roof elements → Lifting by means of auto-cranes → Short erection time Assembling / Erection Lab Hall Impressions Impressions