START OF ANY PROJECT FOR BUILDING
CONSTRUCTION
▪ Land Acquisition
▪ Land Clearance
▪ Excavation & Compaction
▪ Leveling
▪ Demarcation Plan
▪ Layout , Shuttering And Footing
▪ Onward Construction Of Substructure & Super
Structure
ABOUT THE THE PROJECT
Project: Assotech Blith
Group Housing
Contract : Civil Work For
Assotech Blith ,Sector
99,gurgaon (Haryana)
Clint : Assotech Limited.
Contractor: Skyline
Engineering Contracts
(India)pvt.Ltd.
ABOUT THE PROJECT
▪ Seven Towers
(A,B,C,D,E&F)
▪ Tower A- G+25
▪ Tower B&b’ &C- G+22
▪ Tower D&d’ –G+18
▪ Tower E,F,G –G+22
▪ 12 Acres
AESTHETIC APPEARANCE
FRONT VIEW
MATERIALS USED
Gemzen Machine
Batching Plant
Electric Crane
Jcb
Mechanical Pump ETC.
ACTIVITIES I HAVE BEEM TRAINED
ABOUT
COLOUMS &
SHEAR-WALL
SLAB&
BEAMS
BRICKWORK STAIRCASE
Layout Leveling Layout Shuttering of stair
Starter Formwork Starter Reinforcement bar
Reinforceme Reinforceme Brick wall placing
nt nt Masonry Shuttering of treads
Formwork Concreting Finishing and risers
Concreting Finishing Curing Casting of stair
Curing Curing Plastering Curing of stair
Curing
Painting&
distempering
FOR EVERY
PART
• PLANNING
• DESIGN
• CONSTRUCTION
• CHECKING
• FINISHING
COLUMN & SHEAR-WALL
(LAYOUT)
With The Help Of Layout Plan ,We Do The Layout.
For This Face Of Any Column Is Considered as Reference
Distance Of Other Column Faces Is Measured
To Fix Layout Marking --Thread Is Used
COLUMN & SHEAR-WALL
(STARTER)
• L –angles
• 5-7.5cms height
• High grade mortar
STARTER MAKING
Reinforcement
with the help of
drawing given
Reinforcement Placements of Column
23
SHUTTERING OF BEAM AND SLAB
(CONTINUED)
Centering
26
REINFORCEMENT PLACEMENT OF BEAM
(CONTINUED)
I Checked stirrup spacing and lapping distance of beam-2, In
figure , it is showed by green marking.
28
REINFORCEMENT PLACEMENT OF SLAB
Placing Slab Reinforcement in long and Placing Crank, extra top & bottom
short direction Reinforcement in slab
29
REINFORCEMENT PLACEMENT OF SLAB Where I checked slab bar
spacing, lapping length
(CONTINUED) and clear distances, which
I have showed in figure by
red marking line.
30
REINFORCEMENT PLACEMENT OF SLAB
(CONTINUED)
32
CASTING OF BEAM AND SLAB (CONTINUED)
Fig 36: Making border for pond Fig 37: Curing of slab by ponding of water
34
CONSTRUCTION OF STAIR
Shuttering of stair
Reinforcement bar placing
Shuttering of treads and risers
Casting of stair
Curing of stair
35
Shuttering of Stair
shuttering of Stair
36
SHUTTERING OF TREADS AND RISERS
After placing all reinforcements, they placed wooden planks
for making treads and risers.
37
CASTING & CURING OF STAIR
Using vibrator during stair casting Curing of stair by moist jute fabric 23-
Dec-
15
38
BRICK WORK
Layout
BRICK WORK
Brick work Masonry
Finishing
BRICK WORK
Curing
Plastering
Curing
Painting& distempering
SAFETY REQUIREMENTS
▪ Need to wear helmet all the time
▪ Proper fencing is done
▪ First aid kit is available along with
safety engineer as well as doctor
▪ At height safety belts are also required
CONCLUSION
▪ Gained basic knowledge in the field of construction.
▪ Learned an importance of proper communication
between office and work site.
▪ Learned wise use of available resources.
▪ The training has revamped my confidence.
▪ Learn about safety requirments at site.
▪ I m happy that I choose civil engineering.
BIBLIOGRAPHY
▪ http://www.slideshare.net/sh.robin27/superstructural-construction-wo
rk-of-a-six-storied-residential-building-65669135?qid=3e2ebd50-ffe6-41
f8-bcdb-73c103e3af25&v=&b=&
from_search=2
▪ http://www.slideshare.net/AbhishekSingh892/an-internship-report-on-
residential-building-construction?qid=ad32e196-5a77-4394-8500-
7a2bb466e499&v=&b=&from_search=3
▪ Mentor’s notes.