AREA CALCULATION
SR.NO DESCRIPTION AREA ( SQ.M) AREA SR. NO. OF AREA PER TOTAL
SR.NO NO. OF FLOORS DESCRIPTION
( SQ.M) NO PARKING ( SQ.M) AREA
1 PLOT AREA 6731.4
1 GROUND FLOOR 839.46 1 BUS PARKING 35 28.12 984.2
2 PERMISIBLE FSI 0.66
2 FIRST FLOOR 707.51 2 TAXI PARKING 10 14 140
3 PERMISIBLE BUILT-UP AREA 4442.724
3 SECOND FLOOR 1423.02 3 CAR PARKING 9 13.75 123.75
4 PROPOSED BUILT-UP AREA 4393.01
4 THIRD FLOOR 1423.02 TOTAL PARKING AREA 1247.95
5 ROAD AREA 3178.31
6 LANDSCAPE AREA 752.29 TOTAL BUILT-UP AREA 4393.01
7 PARKING AREA 1247.95
Master & Associates Architects, Interior
1995 - Construction of Bus Terminal, Rao Colony, Lonavala Designer & Project
Management Consultants
6.0 Ground floor Plan 6