Admin Report 16-23
Admin Report 16-23
Name Designation Task Area Md.Habibul Amin Junior Administrator Date from Feb 16 to Feb 23 , 2014 Department: Administration Follow-up date 23/2/2014
Task details Status Follow-up Solar repairing issue: we Engineer will fix are not getting the Solar Eng. will the problem on power from it. replace inverter 24 Wall and roof is completed wall, grill and glass cutting and door setup on process Tiles materials and technician will come together Need to make a sample first monitoring and follow up going on Side garss has been cut N/A
24/2/14
Building ramp beside tiffin room Installation of tiles in the bottom of the iron beams & pointing where needed Watering in the fields
26/2/14
Grounds
Grass cutting in cricket field side grass cutting in the mini fields, around tesnis court Monitoring the generator, diesel consumption
Checking the Monitoring report and daily every day follow up Checking the Monitoring & register and area follow up Monitoring & fixing upon problem arrised follow up
N/A
Generator
Monitoring the daily cleaning items of generator room Monitoring operators, under voltage issues
N/A N/A