Professional Documents
Culture Documents
R0
Revisions
Project Title:-
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Deepak Kumar
Checked by
Approved by
Feb.-2015
Date
Initial Drawings
Description
Revisions
DRAWING No:-
FILE NAME:-
Checked by
PROPOSED RIGHT-OF-WAY
30000
PROPOSED
RIGHT OF WAY
1500
7250
PROPOSED CARRIAGEWAY
DRAIN CUM
FOOT PATH
2000
7250
MEDIAN
PROPOSED CARRIAGEWAY
PAVED
SHOULDER
PAVED
SHOULDER
1500
PROPOSED
RIGHT OF WAY
2000
1500
DRAIN CUM
FOOT PATH
2.5%
DL 4C 0011
BC
DBM
WMM
GSB
Sub Grade
2.5%
DL 4C 0011
EXISTING ROAD
5500 (AV)
TCS-1
TYPICAL CROSS SECTION - 4 LANE DIVIDED CARRIAGEWAY (WIDENING URBAN)
IMPHAL TAMENGLONG ROAD - URBAN SECTION
1500
Distributors
115
50
CEMENT CONCRETE (M-20)
1200
225
Varies
250
R=
2
50
CARRIAGEWAY
BC
50
DBM
M20
1
WMM TOP LAYER
A
F
DETAIL AT 'B'
DETAIL D
PCC M15
Distributors
Project Title:-
Scale:-
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Deepak Kumar
Checked by
Approved by
Initial Drawings
Description
Checked by
Revisions
DRAWING No:-
FILE NAME:-
1500
3.5%
7000
PROPOSED CARRIAGEWAY
DL 4C 0011
2.5%
1500
1000
EARTHEN
SHOULDER
UNLINED
DRAIN
1000
PAVED
SHOULDER
VARIES
PAVED
SHOULDER
2850
EARTHEN
SHOULDER
PROPOSED RIGHT-OF-WAY
30000
2.5%
UNLINED
DRAIN
3.5%
2:1
750
:1
BC
DBM
WMM
GSB
Sub Grade
600
1.5
750
2:1
1.5
2850
VARIES
EXISTING ROAD
:1
5500 (Av)
600
TCS-2
TYPICAL CROSS SECTION - 2 LANE CARRIAGEWAY WITH PAVED SHOULDER (WIDENING)
IMPHAL TAMENGLONG ROAD - RURAL SECTION
Project Title:-
Scale:-
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Deepak Kumar
Checked by
Approved by
Initial Drawings
Description
Checked by
Revisions
DRAWING No:-
FILE NAME:-
1:2
1:2
1000
EARTHEN
SHOULDER
HILL
SIDE
HILL
SIDE
1:2
1: 2
4.0m.
900
7000
CARRIAGEWAY
EARTHEN
SHOULDER
900
2.5 %
3.5%
1:
100
2.5 %
3.5%
1
1:
.5
1:2
1500
600
DRAIN
DRAIN
BC
DBM
WMM
GSB
Sub Grade
600
600
TCS-3
TYPICAL CROSS SECTION - 2 LANE CARRIAGEWAY (BOX CUT)
IMPHAL TAMENGLONG ROAD - HILL SECTION
Note :
1. All Dimensions are in mm
2. The applicable Stretch shall be as per design
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Deepak Kumar
Checked by
Approved by
Initial Drawings
Description
Checked by
Revisions
DRAWING No:-
FILE NAME:-
EARTHEN
SHOULDER
900
450
PARAPET
WALL
7000
CARRIAGEWAY
EARTHEN
SHOULDER
1:2
900
1000
HILL
SIDE
STONE MASONARY
1:2
4.0m.
2.5 %
2.5 %
3.5%
600
2:1
VALLEY
SIDE
100
3.5%
.
1:2
1500
600
DRAIN
BC
DBM
WMM
GSB
Sub Grade
600
RETAINING WALL
TCS-4
TYPICAL CROSS SECTION - 2 LANE CARRIAGEWAY (HALF CUT / FILL)
IMPHAL TAMENGLONG ROAD - HILL SECTION
Note :
1. All Dimensions are in mm
2. The applicable Stretch shall be as per design
3. The parapet wall shall be 2m continuous with 1m gap
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Deepak Kumar
Checked by
Approved by
Initial Drawings
Description
Checked by
Revisions
DRAWING No:-
FILE NAME:-
900
450
PARAPET
WALL
EARTHEN
SHOULDER
7000
CARRIAGEWAY
EARTHEN
SHOULDER
900
STONE
MASONARY
3.5%
2.5 %
2.5 %
3.5%
600
2:1
VALLEY
SIDE
1:2
HILL
SIDE
BC
DBM
WMM
GSB
Sub Grade
DRAIN
RETAINING WALL
600
TCS-5
TYPICAL CROSS SECTION - 2 LANE CARRIAGEWAY (FILL IN HILL SECTION)
IMPHAL TAMENGLONG ROAD - HILL SECTION
Note :
1. All Dimensions are in mm
2. The applicable Stretch shall be as per design
3. The parapet wall shall be 2m continuous with 1m gap
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Deepak Kumar
Checked by
Approved by
Initial Drawings
Description
Checked by
Revisions
DRAWING No:-
FILE NAME:-
900
5500
EARTHEN
SHOULDER
CARRIAGEWAY
EARTHEN
SHOULDER
900
1000
HILL
SIDE
1:2
4.0m.
3.5%
DRAIN
2.5 %
2.5 %
3.5%
2:1
1
1:
VALLEY
SIDE
600
BC
DBM
WMM
GSB
Subgrade
TCS-6
TYPICAL CROSS SECTION - INTERMEDIATE LANE (FILL)
(SPURS - HILL SECTION)
Note :
1. All Dimensions are in mm
2. The applicable Stretch shall be as per design
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Deepak Kumar
Checked by
Approved by
Initial Drawings
Description
Checked by
Revisions
DRAWING No:-
FILE NAME:-
HILL
SIDE
3.5%
1:2
4.0m.
2.5 %
2.5 %
1:2
1000
HILL
SIDE
3.5%
1
1:
1:
CARRIAGEWAY
1:2
EARTHEN
SHOULDER
1:2
1000
900
5500
EARTHEN
SHOULDER
900
4.0m.
Drain
Drain
BC
DBM
WMM
GSB
Subgrade
600
600
TCS-7
TYPICAL CROSS SECTION - INTERMEDIATE LANE (BOX CUT)
(SPURS - HILL SECTION)
Note :
1. All Dimensions are in mm
2. The applicable Stretch shall be as per design
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Deepak Kumar
Checked by
Approved by
Initial Drawings
Description
Checked by
Revisions
DRAWING No:-
FILE NAME:-
900
1:2
3.5%
2.5 %
EARTHEN
SHOULDER
EARTHEN
SHOULDER
HILL
SIDE
900
5500
CARRIAGEWAY
2.5 %
3.5%
2:1
1
1:
VALLEY
SIDE
DRAIN
PC
DBM
WMM
GSB
Subgrade
600
TCS-8
TYPICAL CROSS SECTION - INTERMEDIATE LANE (HALF CUT - HALF FILL)
(SPURS - HILL SECTION)
Note :
1. All Dimensions are in mm
2. The applicable Stretch shall be as per design
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Deepak Kumar
Checked by
Approved by
Initial Drawings
Description
Checked by
Revisions
DRAWING No:-
FILE NAME:-
IMPHAL
TAMENGLONG
DECK LEVEL
RL. 788.700m
H.F.L
RL. 785.59m
B
PROPOSED BRIDGE
AT CH: 3+178
SPAN: 3X20M(C/C OF EXP. JOINT)
KEY PLAN
NOTES:BH-1 FOR A1
BH-2 FOR P2
P1
A1
P2
A2
SECTIONAL ELEVATION
D/S
P1
P2
1
U/S
REFERENCE:A2
A1
HALF PLAN AT BOTTOM
PLAN
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-3+178/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
DECK LEVEL
RL. 788.700m
DECK LEVEL
RL. 788.700m
DECK LEVEL
RL. 788.700m
DECK LEVEL
RL. 788.700m
SECTION 2-2
REFERENCE:SECTION 1-1
SECTION OF PRECAST
GIRDER AT MID
SECTION OF PRECAST
GIRDER AT SUPPORT
DETAIL-A
DETAIL-B
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-3+178/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
IMPHAL
TAMENGLONG
D/S
A1
P1
A2
DECK LEVEL
RL. 790.100m
H.F.L
RL. 786.980m
EXISTING BRIDGE
PROPOSED BRIDGE
U/S
AT CH: 5+411
SPAN: 2X20M(C/C OF EXP. JOINT)
KEY PLAN
A1
BH-1 FOR A1
A2
BH-2 FOR P1
SECTIONAL ELEVATION
NOTES:-
GROUND LEVEL
(m.)
CHAINNAGE
(Km.)
D/S
1
A1
P1
U/S
A2
REFERENCE:-
PLAN
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-5+411/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
DECK LEVEL
RL. 790.100m
DECK LEVEL
RL. 790.100m
DECK LEVEL
RL. 790.100m
DECK LEVEL
RL. 790.100m
SECTION 1-1
DIMENSIONS SHOWN IN BRACKET
ARE ALONG SKEW DIRECTION
SECTION 2-2
REFERENCE:-
SECTION OF PRECAST
GIRDER AT SUPPORT
SECTION OF PRECAST
GIRDER AT MID
DETAIL-B
DETAIL-A
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-5+411/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
IMPHAL
TAMENGLONG
TOP OF BOX
RL. 1136.000m
TOP OF SLAB
RL. 1136.000m
TOP SLAB
TOP SLAB
U/S
LBL
RL 1131.648m
D/S
H.F.L
RL. 1132.820m
FDN LEVEL
RL. 1131.000m
BOTTOM OF BOX
RL. 1130.600m
BOTTOM SLAB
BOTTOM SLAB
SECTIONAL ELEVATION
FOUNDATION LEVEL
RL. 1129.400m
BH-1
SECTION 1-1
FORMATION
LEVEL (m)
GROUND LEVEL
(m)
CHAINAGE
(Km)
NOTES:
1
D/S
U/S
HALF PLAN
AT BOTTOM
HALF PLAN
AT TOP
PLAN
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-28+000/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
DETAIL-A
FOUNDATION LVL.
880.500m
SECTION 1-1
DETAIL-B
TOP OF WALL
OUTER FACE
EARTH FACE
GROUND LEVEL
REFERENCE:SECTION 2-2
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-32+197/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
IMPHAL
NOTES:-
TAMENGLONG
FORMATION LEVEL
FR
FX
FR
FR
FX
FX
BH-1
BH-2
BH-3
H.F.L
RL. 896.210m
3
BH-4
L.B.L
A1
A2
P2
FORMATION
LEVEL (m)
914.111
GROUND LEVEL
(m)
893.328
CHAINAGE
(Km)
32+207
SECTIONAL ELEVATION
D/S
2
1
A1
P1
U/S
P2
3
HALF PLAN AT BOTTOM
A2
KEY PLAN
PLAN
REFERENCE:Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-32+197/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
TO IMPHAL
NOTES:
TO TAMENGLONG
TOP OF BOX
RL. 844.466m
TOP SLAB
H.F.L
RL. 841.160m
FOUNDATION LEVEL
RL. 838.300m
FOUNDATION LEVEL
RL. 836.300m
SECTIONAL ELEVATION
BH-1
FORMATION
LEVEL (m)
GROUND LEVEL
(m)
CHAINAGE
(Km)
TOP OF SLAB
RL. 844.466m
TOP SLAB
D/S
FDN LEVEL
RL. 836.300m
BOTTOM SLAB
D/S
SECTION 1-1
R=75M
U/S
1
HALF PLAN AT BOTTOM
PLAN
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-34+410/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
IMPHAL
TAMENGLONG
FOUNDATION LEVEL
RL. 852.300m
PILE CAP TOP
RL. 849.700m
FOUNDATION LEVEL
RL. 846.500m
FOUNDATION LEVEL
RL. 827.900m
FOUNDATION LEVEL
RL. 822.200m
A1
H.F.L
RL. 831.240m
PILE CAP TOP
RL. 828.000m
BH-1
(AT A1)
A2
BH-2
(AT P1)
FOUNDATION LEVEL
RL. 806.200m
FOUNDATION LEVEL
RL. 806.200m
P1
P2
SECTIONAL ELEVATION
FORMATION
LEVEL (m)
BH-3
(AT P2)
BH-4
(AT A2)
P3
L.B.L
GROUND LEVEL
(m)
828.018
CHAINAGE
(Km)
34+910
1
3
2
BH-1
BH-2
BH-4
BH-3
1
A1
P1
P2
A2
3
P3
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Checked By
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-34+926/GAD-01
Prepared by
Designed by
Checked by
Approved by
REV.
R1
A1
P1
P2
PLAN AT DECK LEVEL
A2
P3
NOTES:-
ROAD LEVEL
OUTER FACE
EARTH FACE
GROUND LEVEL
FOUNDATION LEVEL
RL. 852.300m
ROAD LEVEL
KEY PLAN
OUTER FACE
EARTH FACE
GROUND LEVEL
REFERENCE:-
FOUNDATION LEVEL
RL. 846.500m
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Checked By
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-34+926/GAD-01
Prepared by
Designed by
Checked by
Approved by
REV.
R1
FOUNDATION LEVEL
RL. 827.900m
SECTION 1-1
(AT ABUTMENT A1)
FOUNDING LEVEL
RL. 822.200m
SECTION 3-3
(AT ABUTMENT A2)
PILE CAP TOP
RL. 828.000m
DETAIL-A
FOUNDATION LEVEL
RL. 806.200m
SECTION 2-2
DETAIL-D
REFERENCE:DETAIL-C
DETAIL-B
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-34+926/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
TO IMPHAL
TO TAMENGLONG
DECK LEVEL
RL. 510.000m
FOUNDATION LEVEL
RL. 499.900m
H.F.L
RL. 491.230m
KEY PLAN
PROPOSED BRIDGE
AT CH: 59+412
SPAN: 15M+30M+15M
NOTES:-
A2
A1
FOUNDATION LEVEL
RL. 468.500m
P1
P2
BH-2
BH-1
BH-3
GROUND LEVEL
(m)
488.256
CHAINAGE
(Km)
50+243
BH-4
SECTIONAL ELEVATION
D/S
U/S
P1
P2
3
A1
A2
REFERENCE:-
PLAN
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-50+240/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
DETAIL-A
FOUNDATION LVL.
476.000m
SECTION 1-1
TOP OF WALL
DETAIL-B
DETAILS OF TOE WALL
PILE CAP TOP
RL. 490.300m
OUTER FACE
EARTH FACE
GROUND LEVEL
PILE CAP BOTTOM
RL. 488.500m
FOUNDATION LEVEL
RL. 468.500m
SECTION 3-3
SECTION 2-2
DETAIL OF LONGITUDINAL GIRDER
(FOR 30M SPAN)
REFERENCE:-
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-50+240/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
FORMATION LEVEL
RL. 457.000m
FORMATION LEVEL
RL. 457.000m
DETAIL-B
DETAIL-A
FOUNDATION LVL.
430.900m
FORMATION LEVEL
RL. 457.000m
RCC PIER PILE CAP
DETAIL-D
DETAIL-C
TOP OF WALL
FOUNDATION LEVEL
RL. 756.747m
SECTION 3-3
(AT PIER P1 AND P2)
OUTER FACE
EARTH FACE
GROUND LEVEL
FOUNDATION LEVEL
RL. 447.300m
SECTION 3-3
REFERENCE:FOUNDATION LVL.
425.900m
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-51+916/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
TO IMPHAL
TO TAMENGLONG
FORMATION LEVEL
RL. 457.000m
D
B
FOUNDATION LEVEL
RL. 430.900m
FOUNDATION LEVEL
RL. 447.300m
PROPOSED BRIDGE
AT CH: 51+916
SPAN: 2X30M+15M
FOUNDATION LEVEL
RL. 425.900m
A1
KEY PLAN
NOTES:-
A2
FOUNDATION LEVEL
RL. 420.300m
P2
P1
BH-1
BH-2
BH-4
SECTIONAL ELEVATION
BH-3
GROUND LEVEL
(m)
442.893 (L.B.L)
CHAINAGE
(Km)
51+87.5
D/S
1
4
U/S
1
A1
P1
HALF PLAN AT BOTTOM
P2
2
A2
PLAN
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-51+916/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
IMPHAL
TAMENGLONG
H.F.L
RL. 279.370m
L.B.L
RL. 278.312m
DETAIL-A
FOUNDATION LEVEL
RL. 275.000m
FOUNDING LEVEL
RL. 275.000m
A1 SECTIONAL ELEVATION A2
SECTION 1-1
BH-1
NOTES:-
FORMATION
LEVEL (m)
GROUND LEVEL
(m)
CHAINAGE
(Km)
U/S
BH-1
A1
D/S
KEY PLAN
A2
PLAN
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-72+179/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
IMPHAL
TAMENGLONG
TOP OF BOX
RL. 301.800m
TOP OF SLAB
RL. 301.800m
TOP SLAB
H.F.L
RL. 298.560m
FOUNDATION LEVEL
RL. 297.700m
0.00m
RCC ABUTMENT SHAFT
FOUNDATION LEVEL
RL. 294.500m
SECTIONAL ELEVATION
2.00m
FORMATION
LEVEL (m)
GROUND LEVEL
AT CENTRE (m)
CHAINAGE
(Km)
FOUNDATION LEVEL
RL. 294.500m
BOTTOM SLAB
SECTION 1-1
NOTES:
8.00m
BH-1
D/S
BH-1
2
R=20M
TOP OF WALL
1
U/S
FOUNDATION
LEVEL
RL. 297.700m
PLAN
DETAILS OF TOE WALL
SECTION 2-2
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-76+154/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
TOP OF WALL
RL. 277.262m
FORMATION LEVEL
RL. 277.400m
TOP OF WALL
RL. 277.262m
FORMATION LEVEL
RL. 277.400m
OUTER FACE
OUTER FACE
EARTH FACE
EARTH FACE
GROUND LEVEL
GROUND LEVEL
FOUNDING LEVEL
RL. 266.000m
FOUNDING
LEVEL
RL. 262.000m
SECTION 4-4
(NEAR ABUTMENT A1)
NOTES:FOUNDING LEVEL
RL. 266.000m
SECTION 1-1
FORMATION LEVEL
RL. 277.400m
FOUNDING LEVEL
RL. 257.200m
SECTION 2-2
RCC ABUTMENT SHAFT
REFERENCE:-
FOUNDING LEVEL
RL. 262.000m
SECTION 3-3
DETAIL-B
DETAIL-A
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-76+972/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
NOTES:IMPHAL
TAMENGLONG
B
H.F.L
RL. 266.470m
FOUNDATION LEVEL
RL. 266.000m
L.B.L
RL. 260.968m
FOUNDATION LEVEL
RL. 262.000m
FOUNDATION LEVEL
RL. 257.200m
A1
P1
P2
A2
P3
SECTIONAL ELEVATION
FORMATION
LEVEL (m)
GROUND
LEVEL (m)
CHAINAGE
(Km)
D/S
BH-4
(ABUTMENT A2)
BH-1
BH-2
BH-3
BH-4
1
U/S
4
A1
P1
P2
P3
A2
PLAN
KEY PLAN
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-76+972/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
TAMENGLONG
IMPHAL
FRL
RL. 347.500m
TOP OF BOX
RL. 345.500m
TOP OF SLAB
RL. 345.500m
TOP SLAB
FOUNDATION
RL. 340.600m
RCC BOX
FORMATION
LEVEL (m)
FOUNDATION LEVEL
RL. 340.600m
BOTTOM SLAB
GROUND LEVEL
(m)
BH-1
SECTION 1-1
NOTES :
CHAINAGE
(Km)
SECTIONAL ELEVATION
U/S
BH-1
TOP OF WALL
D/S
PLAN
GROUND
FOUNDATION
RL. 341.860m
SECTION 2-2
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-78+852/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
IMPHAL
TAMENGLONG
A
RCC ABUTMENT SHAFT
H.F.L
RL. 385.900m
L.B.L
RL. 383.423m
FOUNDING LEVEL
RL. 381.000m
FOUNDATION LEVEL
RL. 381.000m
A1
BH-1
SECTION 1-1
NOTES:-
SECTIONAL ELEVATION A2
FORMATION
LEVEL (m)
GROUND LEVEL
(m)
CHAINAGE (Km)
U/S
D/S
BH-1
A1
A2
PLAN
DETAIL-A
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Checked By
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-81+610/GAD-01
Prepared by
Designed by
Checked by
Approved by
REV.
R1
TAMENGLONG
IMPHAL
FRL
RL. 349.164m
TOP OF BOX
RL. 347.180m
HFL. RL.
345.180m
TOP OF SLAB
RL. 347.180m
TOP SLAB
FOUNDATION
RL. 341.400m
RCC BOX
U/S
GROUND
LEVEL
(m)
D/S
CHAINAGE
(Km)
SECTION 1-1
SECTIONAL ELEVATION
BH-1
1
U/S
NOTES:
R=55m
BH-1
FRL
RL. 349.164m
GROUND
FOUNDATION
RL. 342.945m
D/S
1
HALF PLAN AT BOTTOM HALF PLAN AT TOP
SECTION 2-2
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR-80+151/GAD-01
Prepared by
Designed by
Checked by
Approved by
Checked By
REV.
R1
IMPHAL
TAMENGLONG
FORMATION
LEVEL
FX
FR
FX
FR
0.00m
FOUNDATION LVL.
RL. 387.800m
1.00m
H.F.L
RL. 384.300m
FOUNDATION LEVEL
RL. 385.200m
FOUNDATION LEVEL
RL. 381.700m
3.00m
FOUNDATION
LEVEL
RL. 381.700m
4.00m
0.00m
FOUNDATION LVL.
RL. 378.500m
1.00m
7.00m
A1
BH-1(ABUTMENT A1)
A2
P1
FORMATION
LEVEL(m)
GROUND
LEVEL(m)
CHAINAGE
(Km)
0.00m
3.00m
6.00m
SECTIONAL ELEVATION
9.00m
BH-3(ABUTMENT A2)
2.10m
3.10m
6.00m
U/S
2
10.00m
BH-2
(PIER P1)
BH-1
BH-3
BH-2
A1
FOUNDING LVL.
RL. 381.700m
D/S
SECTION 1-1
FOUNDING LVL.
RL. 378.500m
A2
SECTION 2-2
PLAN
TOP OF WALL
DETAILS OF
TOE WALL
TOP OF WALL
EARTH FACE
OUTER FACE
SECTION AT SUPPORT
EARTH FACE
GROUND LEVEL
OUTER FACE
FOUNDING LVL.
RL. 387.800m
FOUNDING LVL.
RL. 385.200m
A2
A1
GROUND LEVEL
KEY PLAN
SECTION AT MID
RETAINING WALL AT
CROSS SECTION OF L-GIRDER
ABUTMENT A2
DETAIL-A
DETAIL-B
Rev. No.
SCALE
PUBLIC WORKS
DEPARTMENT
MANIPUR
PROJECT:
TITLE:
Date
Description
Checked By
Revisions
DRAWING No.
PWD/MANI/PKG-II/BR- 82+505/GAD-01
Prepared by
Designed by
Checked by
Approved by
REV.
R1
Feb.-2015
R0
Date
Revisions
Project Title:-
Scale:-
1:100
Prepared by
Designed by
Checked by
Approved by
Initial Drawings
Description
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/SC/1/4/R0
FILE NAME:-
Checked by
EXISTING PORTION
EXISTING PORTION
Feb.-2015
R0
Date
Revisions
Project Title:-
Scale:-
1:100
(IMPHAL-KANGCHUP-TAMENGLONG ROAD)
Prepared by
Designed by
Checked by
Approved by
Initial Drawings
Description
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/SC/2/4/R0
FILE NAME:-
Checked by
R0
Revisions
Project Title:-
Scale:-
1:100
(IMPHAL-KANGCHUP-TAMENGLONG ROAD)
Prepared by
Designed by
Checked by
Approved by
Feb.-2015
Date
Initial Drawings
Description
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/SC/3/4/R0
FILE NAME:-
Checked by
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
1:100
Prepared by
Designed by
Checked by
Approved by
Initial Drawings
Description
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/SC/4/4/R0
FILE NAME:-
Checked by
R0
Revisions
Project Title:-
Scale:-
NOT TO SCALE
(IMPHAL-KANGCHUP-TAMENGLONG ROAD)
Prepared by
Designed by
Checked by
Approved by
Feb.-2015
Date
Initial Drawings
Description
Checked by
Revisions
DRAWING No:-
FILE NAME:-
600
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
Prepared by
Designed by
Checked by
Approved by
Checked by
Revisions
DRAWING No:-
1:100
(IMPHAL-KANGCHUP-TAMENGLONG ROAD)
Initial Drawings
Description
FILE NAME:-
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
NOT TO SCALE
Prepared by
Designed by
Checked by
Approved by
Checked by
Revisions
DRAWING No:-
Initial Drawings
Description
FILE NAME:-
PWD/IMPHAL TAMENGLONG/BC/NC/Notes/R0
1/1.0x1.0/0
1/1.2x1.2/0
1/1.5x1.0/0
1/1.5x1.5/0
1/2.0x1.5/0
1/2.0x2.0/0
1/2.5x2.0/0
1/3.0x2.0/0
1/4.0x2.0/0
1/6.0x4.0/0
a
(mm)
b
(mm)
c
(mm)
d
(mm)
e
(mm)
f
(mm)
1000
1200
1500
1500
2000
2000
2500
3000
4000
6000
1000
1200
1000
1500
1500
2000
2000
2000
2000
4000
000
000
000
000
000
000
000
000
000
000
200
250
250
250
325
325
400
400
520
700
225
270
270
270
350
350
450
450
550
700
200
250
250
250
300
300
400
400
500
600
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
1:100
(IMPHAL-KANGCHUP-TAMENGLONG ROAD)
Prepared by
Designed by
Checked by
Approved by
Initial Drawings
Description
REQUIRED
DESIGN
BEARING
BASE
CAPACITY
PRESSURE
CATEGORY
(T/m2)
B
B
B
B
C
C
C
C
C
C
9.445
9.579
9.230
9.335
10.000
10.196
10.50
10.50
12.660
12.0
Checked by
Revisions
DRAWING No:-PWD/IMPHAL TAMENGLONG/BC/NC/1/CELL/GAD/ 01 /R0
300
2300
600
750
1/1.0x1.0/0
1/1.2x1.2/0
1/1.5x1.0/0
1/1.5x1.5/0
1/2.0x1.5/0
1/2.0x2.0/0
1/2.5x2.0/0
1/3.0x2.0/0
1/4.0x2.0/0
1/6.0x4.0/0
a
(mm)
b
(mm)
c
(mm)
d
(mm)
e
(mm)
f
(mm)
1000
1200
1500
1500
2000
2000
2500
3000
4000
6000
1000
1200
1000
1500
1500
2000
2000
2000
2000
4000
000
000
000
000
000
000
000
000
000
000
200
250
250
250
325
325
400
400
520
700
225
270
270
270
350
350
450
450
550
700
200
250
250
250
300
300
400
400
500
600
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
1:100
(IMPHAL-KANGCHUP-TAMENGLONG ROAD)
Prepared by
Designed by
Checked by
Approved by
Initial Drawings
Description
REQUIRED
DESIGN
BEARING
BASE
CAPACITY
PRESSURE
CATEGORY
(T/m2)
B
B
B
B
C
C
C
C
C
C
9.445
9.579
9.230
9.335
10.000
10.196
10.50
10.50
12.660
12.0
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/BC/NC/1/CELL/GAD/ 01a/R0
1.
2.
3.
4.
THIS DRAWING IS WITHOUT ANY BASE PROJECTION MARKED AS C=0, & REINFORCEMENT AS NIL.
Project Title:-
Scale:-
NOT TO SCALE
(IMPHAL-KANGCHUP-TAMENGLONG ROAD)
Prepared by
Designed by
Checked by
Approved by
R0
Revisions
Feb.-2015
Date
Initial Drawings
Description
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/BC/NC/1CELL/Reinf/02 /R0
FILE NAME:-
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
1 : 50
(IMPHAL-KANGCHUP-TAMENGLONG ROAD)
Prepared by
Designed by
Checked by
Approved by
Initial Drawings
Description
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG /BC/NC/MISC/01/R0
R0
Revisions
Project Title:-
Scale:-
As Shown
Prepared by
Designed by
Checked by
Approved by
Feb.-2015
Date
Initial Drawings
Description
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/BC/WC/MISC/02/R0
R0
Revisions
Project Title:-
Scale:-
As Shown
DETAILS OF
APPROACH SLAB & RCC RAILING
(WITHOUT EARTH CUSHION)
(IMPHAL-KANGCHUP-TAMENGLONG ROAD)
Prepared by
Designed by
Checked by
Approved by
Feb.-2015
Date
Initial Drawings
Description
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/BC/WC/MISC/03/R0
FILE NAME:-
R0
Revisions
Project Title:-
Scale:-
NOT TO SCALE
Feb.-2015
Date
Prepared by
Designed by
Checked by
Approved by
Checked by
Revisions
DRAWING No:-
Initial Drawings
Description
FILE NAME:-
PWD/IMPHAL TAMENGLONG/BC/WC/Notes/R0
R0
Revisions
Project Title:-
Scale:-
1:100
Prepared by
Designed by
Checked by
Approved by
Feb.-2015
Date
Initial Drawings
Description
Checked by
Revisions
DRAWING No:-
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
1:100
Prepared by
Designed by
Checked by
Approved by
Initial Drawings
Description
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/BC/1CELL/WC/Reinf/02/R0
Feb.-2015
R0
Date
Revisions
Project Title:-
Scale:-
1:100
(IMPHAL-KANGCHUP-TAMENGLONG ROAD)
Prepared by
Designed by
Checked by
Approved by
Initial Drawings
Description
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/1CELL/WC/Reinf/03/R0
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
1 : 50
(IMPHAL-KANGCHUP-TAMENGLONG ROAD)
Prepared by
Designed by
Checked by
Approved by
Initial Drawings
Description
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/BC/NC/MISC/01/R0
R0
Revisions
Project Title:-
Scale:-
As Shown
Prepared by
Designed by
Checked by
Approved by
Feb.-2015
Date
Initial Drawings
Description
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/BC/NC/MISC/02/R0
BAR
MARKED
TOTAL HEIGHT (HT) TOTAL HEIGHT (HT) TOTAL HEIGHT (HT) TOTAL HEIGHT (HT)
9.0 M
10.0 M
11.0 M
12.0M
20 mm dia @ 90 mm c/c
32 mm dia @ 90 mm c/c
10
EARTH FACE
L
k
j
m
50x BAR DIA
k
k
ST
(m)
St
(m)
SH
(m)
S
(m)
TL
(m)
7.0
0.4
0.3
0.4
1.1
3.0
2.5
HL
(m)
B
(m)
t
(m)
T
(m)
3.45 7.55
0.3
1.1
Base Pressure
H
Df
S.No. (m)
(m)
3-10T
(static cond... as
per design)
8.0
2.5
0.6
0.3
0.4
1.3
3.4
4.0
8.7
0.3
1.3
20.0
9.0
2.5
0.6
0.3
0.6
1.5
3.6
4.8
9.9
0.3
1.3
23.0
10.0
2.5
0.7
0.5
0.6
1.8
4.2
4.6
10.6
0.3
1.8
24.0
11.0
2.5
0.9
0.5
0.6
2.0
4.4
5.2
11.6
0.3
2.0
26.5
12.0
2.5
1.6
0.5
0.5
2.6
4.4
5.6
12.6
0.3
2.4
29.0
b
@ 125 mm c/c
8mm dia @ 200 mm c/c
17.0
Slop
e 3:1
(TYP)
EARTH FACE
c
d
OUTSIDE FACE
REINFORCEMENT DETAILS
RETAINING WALL
600 THK.
FILTER MEDIA
O.G.L.
SHEAR KEY
7. BACK FILLING AND FILTER MEDIA BEHIND THE RETAINING WALL SHALL
BE PROVIDED WITH SELECTED EARTH CONFORMING TO APPENDIX 6 OF
3
Project Title:-
Scale :
PUBLIC WORKS DEPARTMENT
GOVERMENT OF MANIPUR
Not to Scale
B.K SWAIN
DEEPAK KUMAR
ASEEM PRABHAKAR
Designed by
Checked by
Approved by
R0
Revisions
Feb.-2015
Date
INITIAL PLAN
Description
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/RE/ 01 /R0
File Name :
1
3
WEEP HOLES
WEEP HOLES
FILTER MEDIA
FILTER MEDIA
1000
1000
PCC M-15
RIP RAP
DRY SONE 150 mm THICK
PITCHING FOR PROTECTION
SLOPE 1:3
R R STONE MASONARY IN
1:3 CEMENT SAND MORTAR
RIP RAP
P.C.C M-15 BEDDING
SLOPE 1:3
SCALE-1:40
SCALE-1:40
1:2
Retaining walls
600
ROADWAY EDGE
1. 100 MM SIZE PVC PIPE SHALL BE USED FOR WEEP HOLES WHICH SHALL BE PROVIDED AT INTERVAL OF 1500 MM
VERTICALLY & HORIZONTALLY (STAGGERED) WITH SLOPE 1:10.
1500
.5
1:2
2. FOUNDATION OF R.W. SHALL BE TAKEN DEEP ENOUGH TO REST ON SOUND FOUNDATION MATERIAL, SAFE FROM SCOUR
2:1
600
RIP RAP DRY STONE PITCHING IN 1000 MM LENGTH TO PREVENT TOE EROSION IN SOFT STRATA.
4. 500 MM RUBBLE PACKING OF HAND PACKED LOOSE STONE OR GRANULAR MATERIAL PACKING IN THE FORM OF FILTER SHALL
Drain
1200
100
THE COPING SHALL CONSIST OF STONES ON EDGE WITH LARGE STONES WITH TOP OF COPING SLOPING TOWARDS VALLEY SIDE.
6. FILTER MEDIA SHALL BE PROVIDED BEHIND R. WALLS TO DRAIN OFF GROUND WATER TABLE OR RAINWATER SEEPAGE
WHICH SHALL CONFORM TO (APPENDIX-6) OF IRC : 78-2000.
R.R.MASONRY (M15)
7. R.W. TOP SHALL BE KEPT SLIGHTLY LOWER THAN THE SHOULDERS AND SHALL BE SLOPING OUTWARD TO VALLEY SIDE
PCC (M15)
SO THAT WATER RUNS OVER THE WALL INSTEAD OF SEEPING INTO THE BACKFILL.
8. BACK FILL LAYER IMMEDIATELY BEHIND THE R.WALL, SHALL CONSIST OF HAND PACKED STONES OR SOME GRANULAR MATERIAL.
REMAINDER OF BACK FILL SHALL BE RAMMED IN 150 MM THICK LAYERS SLOPING TOWARDS THE BACK OF THE WALL.
BREAST WALL
THE TOP SURFACE OF BACK FILL SHALL BE SEALED TO PREVENT DIRECT SEEPAGE OF WATER BEHIND THE RETAINING WALL.
Project Title:-
Scale :
PUBLIC WORKS DEPARTMENT
GOVERMENT OF MANIPUR
Not to Scale
R0
Revisions
Feb.-2015
Date
INITIAL PLAN
Description
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/RE/ 02 /R0
ARTI ROY
Prepared by
B.K SWAIN
DEEPAK KUMAR
ASEEM PRABHAKAR
Designed by
Checked by
Approved by
File Name :
Checked by
R0
Feb-2015
Date
Revisions
Project Title:-
Scale:-
Prepared by
Designed by
Checked by
Approved by
Initial Drawings
Description
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/MAJ JUN/01/R0
FILE NAME:-
R0
Feb-2015
Date
Revisions
Project Title:-
Scale:-
Designed by
Checked by
Approved by
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/MAJ JUN/02/R0
(IMPHAL-KANGCHUP-TAMENGLONG ROAD )
Prepared by
Initial Drawings
Description
FILE NAME:-
R0
Feb-2015
Date
Revisions
Project Title:-
Scale:-
Designed by
Checked by
Approved by
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/MAJ JUN/03/R0
(IMPHAL-KANGCHUP-TAMENGLONG ROAD )
Prepared by
Initial Drawings
Description
FILE NAME:-
R0
Feb-2015
Date
Revisions
Project Title:-
Scale:-
Designed by
Checked by
Approved by
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/MAJ JUN/04/R0
(IMPHAL-KANGCHUP-TAMENGLONG ROAD )
Prepared by
Initial Drawings
Description
FILE NAME:-
R0
Feb-2015
Date
Revisions
Project Title:-
Scale:-
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Checked by
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/MAJ JUN/05/R0
Deepak Kumar
Approved by
Initial Drawings
Description
FILE NAME:-
R0
Feb-2015
Date
Revisions
Project Title:-
Scale:-
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Checked by
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/MAJ JUN/06/R0
Deepak Kumar
Approved by
Initial Drawings
Description
FILE NAME:-
R0
Feb-2015
Date
Revisions
Project Title:-
Scale:-
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Checked by
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/MAJ JUN/07/R0
Deepak Kumar
Approved by
Initial Drawings
Description
FILE NAME:-
Scale :
PUBLIC WORKS DEPARTMENT
GOVERMENT OF MANIPUR
Project Title:-
Not to Scale
R0
Feb. - 2015
Revisions
Date
INITIAL PLAN
Description
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/RF/02 /R0
ARTI ROY
Prepared by
B.K SWAIN
Designed by
DEEPAK KUMAR
Checked by
ASEEM PRABHAKAR
Approved by
File Name :
Checked by
Scale :
PUBLIC WORKS DEPARTMENT
GOVERMENT OF MANIPUR
Project Title:-
Not to Scale
R0
Revisions
Feb.-2015
Date
INITIAL PLAN
Description
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/RF/ 01/R0
ARTI ROY
Prepared by
B.K SWAIN
DEEPAK KUMAR
ASEEM PRABHAKAR
Designed by
Checked by
Approved by
File Name :
Checked by
CARRIAGEWAY 7.0m
CARRIAGEWAY 7.0m
PLAN
DL4C 1234
DL 1C 0001
SECTION AT AA
R0
Feb. -2015
Date
Revisions
Project Title:-
Scale:-
Vimal Prakash
(IMPHAL-KANGCHUP-TAMENGLONG ROAD)
Prepared by
Designed by
Aseem Prabhakar
Deepak Kumar
Checked by
Approved by
Checked by
Revisions
DRAWING No:-
03
Initial Drawings
Description
FILE NAME:-
PLAN
TYPICAL LAYOUT - PICK UP BUS STOP (IN URBAN SECTION)
SECTION AT AA
R0
Feb.-2015
Date
Revisions
Project Title:-
Scale:-
Prepared by
Designed by
Checked by
Approved by
Initial Drawings
Description
Revisions
DRAWING No:-
FILE NAME:-
Checked by
DL 1C 0001
SECTION AT AA
R0
Feb. -2015
Date
Revisions
Project Title:-
Scale:-
Prepared by
Designed by
Aseem Prabhakar
Deepak Kumar
Checked by
Approved by
Checked by
Revisions
DRAWING No:-
03
Anju
Initial Drawings
Description
FILE NAME:-
R0
Revisions
Scale:-
Drawing Name:N.T.S.
Prepared by
Designed by
Checked by
Approved by
Feb.-2015
Date
Initial Drawings
Description
Revisions
DRAWING No:- PWD/IMPHAL RING ROAD/BUS BAY/04/R0
FILE NAME:-
Checked by
Project Title:-
Scale :
PUBLIC WORKS DEPARTMENT
GOVERMENT OF MANIPUR
Not to Scale
DETAILS OF METALLIC
CRASH BARRIER
(IMPHAL-KANGCHUP-TAMENGLONG ROAD)
R0
Revisions
Feb.-2015
Date
INITIAL PLAN
Description
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/CB/ 01/R0
ARTI ROY
Prepared by
B.K SWAIN
DEEPAK KUMAR
ASEEM PRABHAKAR
Designed by
Checked by
Approved by
File Name :
Checked by
Feb.- 2015
R0
Date
Revisions
Project Title:-
Scale:-
(DIRECTION INFORMATION)
(IMPHAL -KANGCHUP-TAMENGLONG ROAD)
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/RS/ 01 /R0
Deepak Kumar
Approved by
Initial Drawings
Description
FILE NAME:-
Checked by
R0
Feb.- 2015
Date
Revisions
Project Title:-
Scale:-
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/RS/ 03 /R0
Deepak Kumar
Approved by
Initial Drawings
Description
FILE NAME:-
Checked by
R0
Feb.- 2015
Date
Revisions
Project Title:-
Scale:-
(WARNING SIGNS)
(IMPHAL -KANGCHUP-TAMENGLONG ROAD)
Vimal Prakash
Prepared by
Designed by
Aseem Prabhakar
Checked by
Revisions
DRAWING No:- PWD/IMPHAL TAMENGLONG/RS/ 02 /R0
Deepak Kumar
Approved by
Initial Drawings
Description
FILE NAME:-
Checked by