*-: Slabs
T = 20 cm@
l.l = 300 kg / cm 2
ws = 0.2*2.50+0.15 + 0.3+0.3 = 1.15 t/m2
t = 25 cm@
Ws = 0.25*2.50+0.15+0.3+0.3 = 1.40 t/m2
Bearing capacity
Assume F.L=-3.00
N= 18
=34
C=0.0
Nq=33
q=1.3
1=18kn/m2
2=8kn/ m2
B=2.00m
N=23
=0.7
qult = c.Nc. c+ 1. Df. Nq. q +2.B. Nq.q
qult =2896.20 KN/ m2
qunet =896.20 -18*3= 2842.20
qall net = 947.40 KN/ m2
KG/Cm2 9.70=
Take B.C=2.50 KG/Cm2
-: Selection of foundation type for hotel part (b)
Sress = p / Abuild = 17894.70 / 668.147 = 26.70 > 25
M = 5824.03M.T
2nd direction
V = 158.04
T= 0.9
B = 25
C = 0.0702
Ft = 0.07*0.9*158.04 = 9.956
148.08 = (v-ft)
M = 5610.34 m.t
Check sresses
Mx = 5610.34
My = 5824.03
P = 17894.70
A = 832.51
Ix = 25*33.203/12 = 76445.12
Iy = 253*33.20/12 = 43229.167
In long direction
F = (-N/A) (M.x/I)y
=(2*33.2/76445.12*5610.34)(17894.7/832.51-) =
F1 = 22.7<25*1.3
F2 = 20.30 <25*1.3
Ok safe
In short direction :F = 21.50 2.87
F1 = 24.37 <25*1.3
F2 = 18.63 <25*1.3
Ok safe
Raft
M = 110m.t
130 = k1 (110*105/100)0.5
K1 = 0.3919
. = 0.4
Fc = 50<105
Take t = 140 cm
Check punch
.q = Pcol / (a+d+b+d)d
.q = 392.55*1000 /(50+130+50+130+120+130+120+130)130
= 4.50 < 8.10
ok
1st D.L
V=A*2*rav
(0.25*1*0.3+2*2.55)=
2*7.17=56.89m3
Wdl=V*2.50
143t=2.50*56.89=
L.L use 200kg/m2
Wl.l= 0.2**(8.442-5.892)=23t
wtot= 143+23=166t
Pcol bridge w/8 =166/8=20.75t
M = 1729.77 m.t
F = (-N/A) (M.y/I)
=(14.5/33408*1729.77)(29*5487.25/24-) =
F1 = -7.01<20*1.3
F2 = 8.50 <20*1.3
2nd direction
V = z.i.c.k.s.w
Z = 0.2
I = 1.00
K = 1.32
S = 1.00
W = 0.9*24*29 = 626.40t
Wtot = 3758.40
T = 0.09*23.25/240.5 = 0.43 <0.7 ft = 0.00
C = 0.1
V = 99.2ton
Wi . Hi =
=626.40(6+11+14.25+17.25+20.25+23.25
56728.8
Wi
Hi
.Wi.Hi
Fi
626.40
626.40
626.40
626.40
626.40
626.40
6
11
14.25
17.25
20.25
23.25
3758.25
6890.40
8926.20
10805.4
12684.60
14563.80
6.50
11.90
15.30
18.60
21.80
25.07
M = 1711.64 m.t
F = (-N/A) (M.x/I)y
=(12/33408*1711.64)(29*5487.25/24-) =
F1 = -7.20<20*1.3
F2 = 8.44 <20*1.3
Raft
M = 30m.t
63 = k1 (30*105/100)0.5
K1 = 0.6
. = 0.4
Fc = 55<105
Take t = 70cm
Check punch
.q = Pcol / (a+d+b+d)2d
.q = 431.07*1000 /(50+65+150+50)*65*2=10.00
Mall
loads
Tslab = 30CM
1st D.L
V=A*2*rav
(0.25*1*0.3+2*2.55)=
2*7.17=56.89m3
Wdl=V*2.50
143t=2.50*56.89=
L.L use 200kg/m2
Wl.l= 0.2**(8.442-5.892)=23t
wtot= 143+23=166t
Pcol bridge w/8 =166/8=20.75t
V = z.i.c.k.s.w
Z= 0.2
I = 1.00
K = 1.32
S = 1.00
Wt = (0.3*2.50+0.15)*62*25*5 = 6975 ton
T = 0.09H/B0.5
= 0.09*20/620.5
= 0.23
C = 1/15T = 0.14
take c = 0.12
V = 0.2*1.00*1.32*1*6975 = 221 ton
.ft = 0.00 t<0.7
Fi = Wi Hi (V-Ft)/Wi.Hi
Wi.Hi = 1395(4+8+12+16+20)= 83700
Fi = Wi.Hi(v-Ft)/Wi.Hi
Fi = 1395.Hi*221/83700
F1 = 14.74 t
F2 = 29.46t
F3 = 44.20t
F4 = 58.93t
F5 = 73.67t
My = 3241m.t
2nd in y direction
V = z.i.c.k.s.w
Z = 0.2
I = 1.00
K = 1.32
S = 1.00
Wtot = 6975 t
T = 0.09*20/250.5 = 0.36<0.7
C = 0.11
V = 204.60 ton
ft = 0.00
Wi . Hi = 83700
Fi = 1395.Hi*204.6/83700
F1 = 13.64 t
F2 = 27.28t
F3 = 40.92t
F4 = 54.56t
F5 = 68.20t
Mx = 3000.8m.t
F = (-15122/62*25)(3241*31/496516)=
F1 = -9.96<20*1.3
F2 = -9.55 <20*1.3
ok
Raft
M = 50m.t
63 = k1 (50*105/100)0.5
K1 = 0.282
k2 = 1775
. = 0.4
Fc = 70<105
Take t = 70cm
Check punch
.q = Pcol / (a+d+b+d)2d
.q = 407*1000 /(50+65+140+50)*65*2=9.78<10
ok
* Check sliding
f.s = w.tan / V
= tan (2*30/3) / 221 * 15122 =
ok 24.90
Piles B.C
Qall = qun.ksp.fd..r2
qun=387t/m2
assume c=1.00
c/B=1.67
=0.005
ksp=0.4
Bs=0.6
Ls=3=1.8
Fd=1+0.4Ls/Bs =2.23.00
Qall=387*0.4*2.2**0.32
Qall =96.29 ton
-: Check punch
K1 = 2.22
K 2 = 1832
As = 4.36
Check min As :As min 0.15*360*110 /100 = 59.4
Use 30 16
Check bond :Qb = 130*1.80*0.55 +3*1.80*1.35 -2*82= -28
.
p = 28*10
-: Check punch
p = 420*10^3 / (2*110*(50+110+90+110)) =
5.3kg/cm2
-: Check forces in piles
W pile cap = 6.73*1.2*2.5 = 20.19 t
Nt = 440 ton
Fp = 440/5 = 88 ton Qall ok
-: Check shear
-: One way shear
Out of area
way shear 2
Q= 2*84*0.35+2*84*0.5+84*0.2= 159.6
p = 111.55*10
ton
R = 470.35 ton
X = 1.191
t = 120cm
No of piles = 470.35*1.1/96 = 5.39
Take n = 6 piles
-: Check punch
<8
K1 = 0.52
As = 110*105/(1832*110) = 55 cm2
K2 =1832
Use 2816
I=96/1.4= 69 t/m2
M = 69*0.42*0.25 83*0.5= 34.255 m.t
As = 34.25*105/(1832*110) = 17cm2
As min = 0.15*105*110/100 = 17.32
Use 916
Design of cap no 8
Design of cap no 9
C29 = 241.20
C30 = 250.8
Co3 = 1055.2
C35 = 287.4
C36 = 281.7
C37 = 282
C49 = 132
C48 = 128.30
R = 2658.6
y=
(132*0.61)+(1055.2*3.76)+(281.7*3.65)+(282*7.23)+(250.8*7.33)+(128.3*7.
02)/2658.6
= 3.67
X = (1055.2*.53)+((287.4+281.7+282)*3.36)+((132+128.3)*6.67) /
2658.6= 1.94
W pile cap = 280
Mx = 4000
Nt = 2939.40
y2 =12*4.22+12*3.82+12*1.42 = 408.48
Fp1 = - (2939.4/42) (4000*4.20/408.48) = -111 &-28.85
Fp2 = -97.40 & -42.65
Fp3 = -83.70 & -56.27
Fp4 = -70
ok
-: Check shear
-: way shear 2
-: Design of moment
8>
ok
-: Check shear
-: One way shear
Q = 0.37*88 = 32.56
I1= 104.138t/m2
I2 = 1.20*2.50=3.00t/m2
M 1_1 = (0.95*88 ) + (0.8*88*0.35) (2.8*3.00*0.654) (104.138*1.2
= -61.781m.t .d = K1 m/b
K1 *( 61.781*105/224.4)0.5 =110
K1 =0.6
K2 =1832
5
As = 61.781*10 /(1832*110) = 30.66 cm2
Check min As :As min = 0.15*224.4*110/100 = 37.02
Use 2016
M 2-2 = 2*0.48*88*0.023 -1.20*3.00*0.273 -104.138*0.88*0.275 =
24.24 m.t
Check min As :As min = 0.15*374.2*110 /100 = 61.743
Use 32 16
Check bond :Qb = 88+0.8*88 0.3*88 -104.138*1.20 = 7.0344
p = 7.0344*10
Check bond :-
Design of semell
Basment wall*
1ST E.P
= 30o
Ka = 1/3
= 0.8H.Ka
= .8*.8*4/3 = 1.92
2ND W.P
Assume critical case for W.P
that G.W.L rises till reach G.L
r = 5/4
r = 1.25
= 0.707
= 0.293
strip (1-1)
Pv = ..H = 2.828
Ph = ..H =1.172
M max = 5.87m.t
d = K1(M/b)0.5.
K1(5.87*105/100)0.5 = 30
K1 = 0.392
K2 = 1818
As =5.87*105/ 1818*30 = 10.76
Use 6 16
t/m1.44
M = wl2/10
M = 3.60 t.m
d = K1(M/b)0.5
K1(3.60*105/100)0.5 = 30
K1 = 0.5
K2 = 1832
.
As =3.60*105/ 1832*30 = 6.55
Use 6 12
Secant piles
ea = 7.5*1.8*1/3 = 4.50.
ep = 2.9*1.8*3 = 15.66.
Ea = 4.5*7.5*0.5 = 16.875
Ep = 0.5*15.66*2.9= 22.71
Ma 16.875 *7.5/3 = 42.18
Mp = 22.71 * 2.9/3 = 21.14
Mo = 20m.t
* Water pressure
Assume G.W.L rises till G.L
H = p/ + Z
Mover =
0.035*7.17+0.41*6.39+1.8*5.14+3.36*3.69+4.54*2.
= 23+5.835*.71
m.t 38.8
Mstable = 0.73*2.23+2.15*1.34+3.33*.42=5.9
M = 32.84
Mtot = 52.48
= 40
k1 (52.84 *105 /100)0.5 = 30
K1 = 0.13
un safe
Use = 60
k1 (52.84*105/100)0.5 = 50
K1 = 0.217
Fc = 100 kg/cm2 < 105 kg/cm2
K2 = 1715
As = 52.84/1715*50 = 61.62
2piles in meter
One pile is 9 22
SWIMMING POOL
-: Cases of loading
-: Case 1
Strip (1-1)
M = 1/6 h3 = 3.86 t.m
Q = 0.5h2 = 4.00 t
-: Design of section
Wf =
2.70*1.00*0.45*2.50
= 3.00 t
Ww =
1.9*2.85*1.00= 5.42
N = 2.50
M = 3.86 +
2.50*0.775
5.42*0.4 = 3.63
Nt = 10.92
e = M / Nt = 0.332.
F =( -10.92 / 2.70 ) ( 1 6*0.332/2.70)
F1 = -7.03 t/m2
F2 = 1.00 t/m2
Design of sec 2*
M = 3.86 t.m
N = 4.00
t = 450mm.
Fct (N) = 4*104/100*450 = 0.0889
FCT (M)= 6*3.86*107/100*4502 = 1.1437
Fct = 1.23 t /m2
tv = 450(1+0.0889/1.1437).
tv = 484.
= 1.65.
Fctr / = 1.99 t / m2
Ok
Reinforcement for sec 2
Nu = 1.50*4.00 = 6 t
Mu = 1.50*3.86 = 5.97 t.m
e = Mu / Nu = .965.
es = e -0.5t + cover.
0.78 = 0.965-0.225+0.04 =
Mus = 6* 0.78 = 4.68
d = C1 (Mus / Fcu b )0.5.
d = 450-40 = 410
.C1 (4.83*107/ 30*1000)0.5 =410
C1= 10.21
c/d = 0.025<0.125
take c/d = 0.125
J= 0.825
( Nu /fy/s)+
As = ( Mus /Fy J d/s
Use fy = 360 N/mm2
16
cr = 0.8
fy\ = 288
As = 7.35 cm2
Use 7 12
= 30
= 1.84
Ka = 1/3
e = 0.333*0.8*2.85 = 0.76.
Hint assume G.W.L rises to G.L
M = 3.61*2.852/6 = 4.89
Q = 0.5*3.61*2.85 = 5.14
Ft\ = 6*4.89/1000t2
Tm 366
T = 350
N = 2.50
Fct (N ) = 2.50*104/1000*350 = 0.0714
Fct ( M ) = 2.395
Fct = 2.32
Tv = 350(1-0.0714/2.395) = 339.56
. = 1.51
fctr / = 2.17
use t = 400mm
N = 2.85
fct (N) = 2.85*104/400*1000 = 0.07125
fct (m) = 6*4.89/ 1000*4002 1.83 =
Fct = 1.7625
Tv = 400(1-0.07125/1.83) = 348.4
= 1.60.
Fctr / = 2.05
Floor
T = 0.4 + 0.1 = 0.5
Wf \ = 2.7*0.5*1*2.50 = 3.375
N = 2.85
M = 4.89 2.85*0.775 = 2.68
Nt = 6.225
e = 2.68 / 6.225 = 0.43.
F =(-6.225/2.7) (16*0.43/2.70)
F1 = -4.50
F2 = -0.1
Design of sec 1
Nu = 1.50*2.85 = 4.275
Mu = 1.50*4.89 = 7.335
e = 1.72.
es= 1.72+0.2-0.04 = 1.88.
Mus 4.27*1.88 = 8.00 t.m
C1 = 6.97
c/d = 0.019
J = 0.825
As = (8107 / 288*0.825*360) (4.3*104/ 288/1.40)
= 7.63
Use 712
Check up lift pressure
U = 1.0*23*51*1.00 = 1173
Q = 23*51*0.5*2.50+0.4*23*51*2.2+2*0.3*(23+51)*2 =
2587.29
f.s = 2.2 ok
Design of tunnel
*Hint assume G.W.L rises G.L
Design of section
t = 550.
M = 10.25 m.t
Fctr = 0.6( fcu )0.5
3.29 =
Assume = 1.50
Ft = 6*1.25*107/1000.t2 < 3.29/1.50
T= 529
Take t = 550
r1 = 4.6 * 5.753 / 24 = 36.44.
r2 = (0.8*3.83/24)+ (11*4.2*3.83/360)= 8.87.
24.85MA + 3.80MB = -271.86
Meq at B -3
3.8Ma+ 2Mb (3.8+5.75)+5.75Mb= -6(r1+r2)
r1 = (4.2*3.83/36)+(0.8*3.83/24) = 8.23.
r2 = (2.12*5.753/24) = 16.8.
3.8Ma + 24.85Mb= 150.18
Ma = -10.25
Mb = -4.48
Fct(M)= 6*1.25*107/1000*5502= 2.03
Fct (N) = -6.84*104/1000*550 = -0.124
Fct = 1.90
tv = 516.
= 1.65
fctr / = 1.99
ok
As= 10.25*1.5*107*1.15/(0.825*510*288)
14.6cm2 =
Use 8 16
Case ii
Loads
W1 = 0.5+h
2.12 = 0.9*0.5+1.80=
+Own weight=2*2.5*2.7*0.5+2.5*0.5*2*5.7/ 5.7
2.12
Own weight = 5.80
Surcharge = 0.5*1/3= 0.166
Earth pressure = 0.8*1.8*3.8*1/3 = 1.8
Using 3 mom_ eq at a
Ma *5.75+ 2ma(5.75+3.8)+mb (3.8)=-6(r1+r2)
r1 = 2.12*5.753/24.
24.85ma+3.8mb = -128.45
At b
Ma*3.8 + 2mb(3.8+5.75) +mb (5.75)= -6(r1+r2)
3.8ma +24.85mb= - 244.34
Ma = -3.70
Mb = -9.25
Check up lift pressure
U = 1.85*9.8*5.75 = 104
Q = (5.75*3.75-2.75*4.75)*2.50 = 208
f.s = 2.00