BMI-5711-01
DATE
01.09.2015
PRODUCTION PLANNING
REVISION
0
PAGE
0 OF 2
PRODUCTION
PLANNING
FOR 2900# BALL VALVE
Revision No. : 0
Date: September 1, 2015
Prepared by:
Date:
Reviewed by:
Date:
Approved by:
Date:
Page
Doc. ID No.
BMI-5711-01
DATE
01.09.2015
PRODUCTION PLANNING
REVISION
0
PAGE
1 OF 2
JOB ORDER
(Operation Manager)
SHOP ORDER
(Production/PPIC)
DESIGN&DRAWIN
G
(Engineering Team)
Drawing
& BOM
NO
YES
MATERIAL
REQUISITION
(Production)
YES
Stock
NO
PURCHASE REQUISITION
(Logistics)
PURSHASE ORDER
(Purchasing)
QC
verifie
d
RECEIVING
MATERIAL
(Logistics & QC)
YES
RELEASE MATERIAL
(Logistics)
YES
NO
Machining
Work
Instruction
MACHINING PROCESS
(Production)
Cutting
Lathe
Milling
YES
INSPECTION
(Quality
Control)
NO
REWOR
K
NO
REJECTED
(Scrap)
NCR
(QC
Inspector)
Page
Doc. ID No.
BMI-5711-01
DATE
01.09.2015
PRODUCTION PLANNING
REVISION
0
PAGE
2 OF 2
A
Assem
bly
Procedur
e
YES
ASSEMBLY
(Production)
YES
INSPECTION
(Quality
Control)
NO
REWOR
K
YES
Hydrot
est
Procedur
e
HYDROTEST
(Production)
INSPECTION
(Quality
Control)
YES
PAINTING
(Production)
FINAL
INSPECTION
(Quality
Control)
NO
REPAIR
(Production)
Paintin
g
Procedur
e
NO
REJECTED
(Scrap/Rejected Area)
NCR
(QC
Inspector)
NCR
(QC
Inspector)
NO
REPAIR
(Production)
NCR
(QC
Inspector)
YES
PRESERVASION
(Logistics)
Preservation of
Product
Procedure
STORAGE
(Ware House Area)
Page
PRODUCTION PLANNING
Doc. ID No.
BMI-5711-01
DATE
01.09.2015
REVISION
0
PAGE
3 OF 2
HYDROTEST
(Production)
Page