K.VEERABHADRA RAO
RETD.CHIEF ENGINEER,AP TRANSCO
DESIGN BASIS
1.ECONOMIC FACTORS
2.NETWORK SAFETY
3.REDUNDANCY
4
MAIN COMPONENTS
1. CONDUCTOR
2. CONDUCTOR ACCESSORIES
a) REPAIR SLEEVES
b) COMPRESSION JOINTS
c) VIBRATION DAMPERS d) SPACERS / SPACER
DAMPERS
3. EARTH WIRE
a) COMPRESSION JOINTS
b) VIBRATION DAMPERS
c) COPPER EARTH BONDS
4. INSULATORS
5. EARTHING/ COUNTER POISE EARTHING SETS
MAIN COMPONENTS
contd..
b) DANGER BOARDS
d) ANTI CLIMBING DEVICES
6
CONDUCTORS
1. COPPER
2 .COPPER CONDUCTOR STEEL REINFORCED
3. ALUMINIUM
4. ALL ALUMINIUM ALLOY CONDUCTORS(AAAC)
5. ALUMINIUM ALLOY CONDUCTOR STEEL
REINFORCED(AACSR)
5. ALUMINIUM CONDUCTOR STEEL
REINFORCED(ACSR)
6. ALUMINIUM CONDUCTOR ALUMINIUM CLAD
STEEL REINFORCED - ACSR(AS)
7
ADVANTAGES OF ACSR
1. MORE SPAN-LESS SAG
2. LARGER DIA -LESS CORONA LOSS FOR UHV
LINES
STANDARDS
1. IS:398 IEC-1098-1991:
SPECIFICATION FOR ALUMINIUM
CONDUCTORS FOR OVERHEAD
TRANSMISSION LINES
2 IS-398 PART-II
: ACSR
3. IS-398 PART-V
: ACSR FOR 400 kV AND ABOVE
4. IEC-1232
: ALUMINIUM CLAD STEEL WIRES FOR
ELECTRICAL PURPOSES
5.IS-1778
:REELS AND DRUMS FOR BARE
CONDUCTORS
10
INSULATOR STRINGS
TYPES OF INSULATORS
1. PORCELAIN DISC INSULATORS,LONG ROD
INSULATORS
2.TOUGHENED GLASS
3.POLYMER SILICON RUBBER/ALLOY OF SILICON
RUBBER AND EPDM
NORMAL SIZES
INSULATOR STRINGS----
CONTINUED
TYPES OF STRINGS
1.SINGLE SUSPENSION
2.DOUBLE SUSPENSION
3.SINGLE TENSION
4. DOUBLE TENSION
5.V-SRTING
13
CONSTRUCTION WORKS
1. SURVEYS
a) ROUTE ALIGNMENT
b) DETAILED SURVEY
i) PROFILES
ii) SOIL PARTICULARS
iii) SAG TEMPLATE
iv)TOWER SPOTTING
v) RIGHT OF WAY
2. APPROVALS FROM CONCERNED
a) ROAD CROSSINGS
i) RAIL CROSSINGS
iii) RIVER CROSSINGS
c) CHECK SURVEY
CONSTRUCTION WORKS
3. FOUNDATIONS
i) DESIGN FOR DIFFERENT SOILS
iii) FORM BOXES
v) CONCRETING
vii) EARTHING
contd..
4. TOWER ERRECTION
i) TOWER SCHEDULES
CONSTRUCTION WORKS
contd..
5. INSULATOR HOISTING
6. POWER AND EARTH CONDUCTOR ERRECTION
i) DELIVERY OF CONDUCTOR AT SITE
iii) TENSIONING AND SAGGING
16
COST COMPONENTS
1. TOWERS AND ACCESSORIES
2. ACSR CONDUCTOR AND ACCESSORIES
3. EARTH WIRE AND ACCESSORIES
4. INSULATOR AND STRINGS
5. FOUNDATIONS
6. ERRECTION
7. CENTAGES
28%
36%
01%
06%
04%
14%
11%
17
18
19
2. DEAD LOADS
a. WEIGHT OF TOWER
b. WEIGHT OF CONDUCTORS,
c. HARDWARE AND INSULATORS
3. SPECIAL LOADS
a. EXTERNAL LOADS DURING
b. CONSTRUCTION AND MAINTENANACE
20
REQUIREMENT OF LOADS
1.RELIABILITY REQUIREMENTS
CLIMATIC LOADS UNDER NORMAL CONDITIONS
2.SECURITY REQUIREMENTS
FAILURE CONTAINMENT LOADS UNDER BROKEN WIRE CONDITION
3.SAFETY REQUIREMENTS
LOADS DURING CONSTRUCTION AND MAINTENANCE LOADS
21
CALCULATE
CONSTRUCTION
AND MAINTENANCE LOADS
SELECT SECURITY
REQUREMENTS
CALCULATE LOADS
RELATED TO
SECURITY
SELECT
RELIABILITY
CALCULATE
CLIMATIC LOADS
CALCULATE STRENGTH
NEEDED TO COMPLY
WITH ALL LOADS AND
REQUIREMENTS
DESIGN COMPONENTS
FOR LOADS AND
STRENGTH
REQUIREMENTS
CHECK SAFETY
REQUIREMENTS
FROM
NATIONAL
REGULATIONS
22
TOWER OUTLINE
1. TOWER HEIGHT
2. TOWER WIDTH
3. CROSS ARM WIDTH
23
ELECTRICAL CLEARANCES
1. MIN.GROUND CLEARANCE
2. MIN.CLEARANCE ABOVE HIGHEST FLOOD LEVEL
3. CLEARACE AND SWING ANGLES
4. AIR CLEARANCE
5. POWER LINE CROSSINGS
6. TELECOM.LINE CROSSINGS
7. RAIL TRACK CROSSINGS
24
DESIGN PARAMETERS
1. NO.OF CIRCUITS
2. CLIMATIC CONDITIONS
a. WIND
b. TEMPERATURE
c. ISOKERANIC LEVEL
d. SEISMIC INTENSITY
e. ICE FORMATION
3.
4.
5.
6.
7.
LOADINGS
1. CLIMATIC LOADS RELATED TO RELIABILITY REQUIREMENTS:
WIND LOADS
i) SNOWY WITH ICE
ii) SNOWY WITH OUT ICE
iii) NON SNOWY
2. FAILURE CONTAINMENT LOADS RELATED TO SECURITY
REQUIREMENTS.
i) LONGITUDINAL LOADS ii) TORSIONAL LOADS
iii) ANTI CASCADING LOADS
3. LOADS DURING CONSTRUCTION AND MAINTENANCE LOADS
RELATED TO SAFETY REQUIREMENTS.
26
LOADINGS
contd..
NATURE OF LOADS
1. TRANSVERSE LOADS(T)
WIND LOAD ON TOWER STRUCTURE, CONDUCTOR, GW &
INSULATOR STRING
COMPONENT OF MECHANICAL TENSION
2. VERTICAL LOADS(V)
SELF WEIGHT
LOADS DURING CONSTRUCTION AND MAINTENANCE
3. LONGITUDINAL LOADS(L)
RELIABILITY CONDITION (NORMAL CONDITION),
SECURITY CONDITION (BROKEN WIRE CONDITION) AND
SAFETY CONDITION (CONSTRUCTION AND MAINTENANCE)
HAVE ALL THE ABOVE LOADS UNDER THEIR LOADING
COMBINATIONS.
SAFTETY CONDITION HAS BOTH NORMAL AND BROKEN WIRE
CONDITION.
27
2. VERTICAL LOADS(V)
:
CONDUCTOR, GW WEIGHTS ON
ONE SIDE ONLY, WEIGHT OF INSULATOR STRINGS AND
ACCESSORIES
3. LONGITUDINAL LOADS(L):
PULL OF CONDUCTOR/GW AT
EVERY DAY TEMPERATURE AND NO-WIND APPLIED
SIMULTANEOUSLY AT ALL POINTS ON ONE SIDE WITH ZERO
DEGREE DEVIATION.
28
45 MM
< 120
30
contd..
PERMISSIBLE STRESSES
SELECTION OF MEMBERS
BOLTS & NUTS
i) CLASS 4.6
ULTIMATE BEARING STRESS - 4440 Kgf/cm2
ULTIMATE SHEARING STRESS - 2220 Kgf/cm2
ii) CLASS 5.6
ULTIMATE BEARING STRESS - 6322 Kgf/cm2
ULTIMATE SHEARING STRESS -3161 Kgf/cm2
FOR 16 mm DIA BOLTS
31
TESTING OF TOWERS
TOWER TESTING STATION
1. TEST BED
2. PERMANENT ANCHORS: LONGITUDINAL MOST
3. ARRANGEMENT FOR APPLYING THE COMBINATION OF LOADS
4. ELECTRICAL WRINCHES (REMOTE CONTROLLED)
5. INSTRUMENTS TO RECORD THE LOAD APPLIED:
MECHANICAL SPRING GAUGES OR ELECTRICAL /
ELECTRONIC TRANSDUCEROS/DYNAMO METERS
6. CONTROL ROOM
7. THEODOLOTES TO OBSERVE DEFLECTION OF TOWER
TESTING
1. BOLT SLIP TEST
3. NC
APPLICATION OF LOADS
TRANSVERSE, LONGITUDINAL LOADS AND VERTICAL LOADS
AT PEAK AND RESPECTIVE CROSS ARM POINTS.
WIND LOAD ON TOWER BODY SIMULATED AT
A. G.W.
B. CROSS ARM LEVELS
C. WIND BELOW CROSS ARM LEVEL TO BE
SIMULATED TO ACT AT BOTTOM CROSS ARM LEVEL
D. TOWER WITH EXTENSION AT TOP OF EXTENSION
33
DESIGN OF FOUNDATIONS
1. TYPE OF LOADS
a. COMPRESSION OR DOWN WARD THRUST
b. TENSION OR UPLIFT
c. LATERAL FORCES OR SIDE THRUST BOTH, TRANSVERSE AND
LOGITUDINAL DIRECTIONS
2. SOIL PARAMETERS
a. LIMIT BEARING CAPACITY
b. DENSITY OF SOIL
c. ANGEL OF EARTH FRUSTRUM
3. SOIL INVESTIGATION
a. TYPY OF SOIL
b. GROUND WATER TABLE
35
DESIGN OF FOUNDATIONS
contd..
4. TYPES OF FOUNDATIONS
a. NORMAL DRY SOIL FOUNDATION
b. WET SOIL FOUNDATION
c. PARTIAL SUBMERGED FOUNDATION
d. FULLY SUBMERGED FOUNDATION
e. BLACK COTTON SOIL FOUNDATION
f. PARITAL BLACK COTTON SOIL FOUNDATION
g. SOFT ROCK/FISSURED ROCK FOUNDATION
h. HARD ROCK FOUNDATION
i. SANDY SOIL FOUNDATION
36
DESIGN OF FOUNDATIONS
contd..
37
THE END
38