ABC company wants to construct a building as per the requirement below

1.
2.
3.
4.
5.
6.

use given materials alone


Building has 3 floors with clear separation between floors
Tallest possible building and largest possible volume inside the building
Building should stand on its own and stable at the place of construction
Movable to any other place.
Building should be able to hold a small weight.

Materials description:

1.
2.
3.
4.
5.

Type

quantity

Paper cups
cello tape
Scissors
News paper
Scale

2
1
1
2
1

Process flow:
1. Project manager (PM)will define the outcome to achieve at the end of the project in
discussion with the team in the form of team meeting(5 minutes)
2. PM will forms small team of equal number of members, allocate work to team(max of 5
members).
1. Architecture team: will prepare the design or documentation before
the building work starts
2. Integration team: will assemble the design
3. Development/implementation team: build the structure according to
the design made by Architecture team
3. PM should communicate the expectation ,mode of operation and protocol to each team (5
minutes)
4. Building should be constructed in 20 minutes
5. PM will present final outcome of the project (5 minutes)